| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.3 LAccepted-Finance | 1 | Accepted-Finance Lowest Rate | |
| 2 | 2₹33.3 L+₹2.0 L (6.35%)Rejected-Finance | 2 | Rejected-Finance Higher RAte | |
| 3 | Rejected-Technical | - | Rejected-Technical Technical Bid Found Not Ok. |
Tender Value
₹32 L
EMD Value
₹35,000
Closing Date
30 Sept 2023, 1:00 pmClosed
SE EDC Etah
Vidhyut Colony, Aruna Nagar, Railway Road.
Various Electrical work for strengthening of electric supply in the area of EDSD IVth Etah (EDD-Ist, Etah) under additional business plan on Semi Turnkey basis.
2023_DVVNL_840720_1
37/2023-24/EDC ETAH
Open Tender
Electrical Works
Turn-key
Distt Etah
As per Tender Documents.
2 documents required · 2 mandatory
₹3,540
DVVNL
₹35,000
17 Oct 2023
20 Sept 2023
30 Sept 2023
20 Sept 2023
30 Sept 2023
20 Sept 2023
Amount
Supply of The Line Material as per Relevent ISS :-
Danger Board with barbed wire
Dead end Clamp
Holding Clamp for Top Channel
I Hook
LT Clamp
Dropper Channel
Top Channel
Tee off Channel 125x65x1300 mm
Nut & Bolts with washer
PRC Connector A&B Type
Protection board for TF
Stone Pad
Suspention Clamp
Tong Tester AC DC with mili Amp Range
4 Core LT MCB with Box
LT PVC Cable AL 3.5x400 sqmm
Alluminium Lug
Copper L Piece
11 KV Fuse Set
Erection Work :-
Safe carriage of line material from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Safe carriage of 33 KV XLPE Cabel 3x120 sqmm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Safe carriage of 33 KV XLPE Cabel 3x300 sqmm from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Safe carriage of 11 KV VCB from store center Etah to pit site in distance range 0 to 60 km including loading & unloading at both ends.
Safe Carriage of 8.5 Mtr Long PCC Pole from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side
Safe Carriage of following T/F from Electricty store center Etah/nearest 33/11 KV S/S to direect Pit site in distance range 0 to 60 Kms. Including loading and unloading at both side.
(A) 25 KVA T/F
(B) 250 KVA T/F
Erection of 8.5 mtr long PCC Pole as single support including fixing of HT/LT accessories etc and other work complete as per RESPO norms.
Erection of 8.5 mtr long PCC Pole as Double Pole/Section Pole including fixing of HT/LT accessories with TPMO etc. and other work complete as per RESPO norms.
Dismantling and removal of existing ACSR Weasel/Dog conductor/GI Wire from the various area, stacking and placement their coils and their in the safer place including cost of lobour T&P etc. required for proper completion of work.
Laying sagging stringing, binding, jumpering & fixing of all accessories etc of following conductor on the newly/old erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc required for proper completion of work.
(a) ACSR Weseal Conductor
(b) ACSR Dog Conductor
(c) ABC Cabile 3x120
(d) ABC Cabile 3x95
(e) 33 KV XLPE Cabile 3x120
(f) 33 KV XLPE Cable 3x300
Re-sagging of loose Weseal conductor/Dog Conductor as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work.
LT Protection for TF
Stone Pad
Suspention Clamp
LT incoming panel with metering equipment.
Erection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Earthing Complete
11 KV Fuse Set
11 KV VCB O/G CTR 200/100/5A 350 MVA
Cable Jointing Kit O/D 3x300 sq mm
Cable Jointing Kit I/D 3x300 sq mm
33 KV Circuit Bracker
Danger Board with barbed wire
Distribution Box with clamp
Dead end Clamp
PRC Connector A&B Type
PVC Armoud Cable 2x6 sqmm
Meter Box
4 Core LT MCB with Box
LT PVC Cable AL 3.5x400 sqmm
Mounting of 25 KVA T/F on double pole including making of the connection etc. complete.
Installation of 250 KVA T/F on newly/old constructed Plinth in proper alignment direction and making HT/LT connection all cost labour and t&p which reqired for complation of Work.
Pipe earthing of 250 KVA medium power T/F
Any other material/consumable required to complete the work shall be arrange by the contractor at his own cost.
Carriage of following old material from pit site to JE store/store center Etah in distance range 0 to 60 km. including loading & unloading and proper stacking.
(a) 10 KVA TF (Old)
(b) 100 KVA TF
(c) ACSR Dog Conductor/ABC Cable (Scrap)
(d) GI Wire (Scrap)
YASH URJAA VARDHAN PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .