| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.3 L+₹53,695.90 (6.92%)Rejected-AOC SABITGANJ SABITGANJ SABITGANJ SABITGANJ ETAWAH UTTAR PRADESH 206001 | ETAWAH | UTTAR PRADESH | 206001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.7 L+₹94,628.92 (12.2%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹7.8 L
EMD Value
₹7,760
Closing Date
6 Aug 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC ETAWAH
STATION ROAD ETAWAH
65/EDCE/2023-24
2023_DVVNL_822719_1
65/EDCE/2023-24
Open Tender
Electrical Works
Item Wise
180 days
EDD-III SAIFAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL.ORG
₹7,760
3 Feb 2024
27 Jul 2023
7 Aug 2023
27 Jul 2023
6 Aug 2023
27 Jul 2023
Carriage of the following material from Store Center Kunera Etawah to site of work Under Jurisdiction of EDD-III Saifai Etawah through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
PCC Pole 9/8.5 Mtrs.
ST Pole 11 Mtrs.
Conductor, GI earthwire, cross arm, insulator and other line material.
11 KV CT/PT
Metering Qubical
LT XLPE Cable
Transformer 16 KVA
Transformer 25 KVA
Transformer 63 KVA
Transformer 100 KVA
Erection and grouting of 9/8.5 Mtrs. long PCC Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.
Erection and grouting of 11 Mtrs. long ST Pole duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.
Erection and grouting of double pole structure of duly grouted including necessories clamps, accessories required fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand and brick ballast. It including the cost of all labour, T&P etc. required for proper completion of work.
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Mounting of 16 KVA Transformer on the Single Pole/Double pole/Plinth structures with connections thereof.
Mounting of 25 KVA Transformer on the Single Pole/Double pole/Plinth structures with connections thereof.
Mounting of 63 KVA Transformer on the Single Pole/Double pole/Plinth structures with connections thereof.
Mounting of 100 KVA Transformer on the Single Pole/Double pole/Plinth structures with connections thereof.
Laying, sagging and stringing and jumpering / binding etc. of ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying, sagging and stringing and jumpering / binding etc. of Dog Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying of cable with GI pipe in trench
Filling of Cable Jointing Kit Outdoor type 3X185, 3x70 Sqmm
CT PT unit mounting double pole
Metering Cubical mounting double pole
Installation of 11 KV Pin insulator with pin.
Installation of 11 KV Disk insulator with fitting.
Installation of T Off channel.
Installation of Top channel.
Installation of Stay Clamp channel.
Installation of Cross Arm
Installation of Fuse Set
Installation of TPMO
Installation of Droper channel.
Installation of Stay Insulator
Installation of DP Clamp
Installation of F Clamp
Installation of Base Angle.
Installation of Holding Clamp
Installation of Connecting Clamp
INDIAN ELECTRICALS
SANDHYA TRADERS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .