Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC HOUSE NO 217 WARD 32 NAVJEEVAN VIHAR DISTT SINGRAULI M P | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486890 | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2,L3 AND L4 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical CHILKATAND BASTI DIYA PAHARI PO SHAKTINAGAR DIST SONEBHADRA UP 231222 | SHAKTINAGAR | SONBHADRA | UTTAR PRADESH | 231222 | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical SHOP NO 31 MASJID MARKET JAYANT SINGRAULI DISTT SINGRAULI M P | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486890 | - | Rejected-Technical NOT L1 BIDDER | |
| 4 | Rejected-Technical ANPARA BAZAR PO ANPARA DIST SONEBHADRA U P 231225 | ANPARA | SONEBHADRA | UTTAR PRADESH | 231225 | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹16.0 L
EMD Value
₹20,100
Closing Date
23 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Offloading material handling of lubricants barrel, loading and unloading, other cleaning work including operator cabin, under carriage track chain and rollers mud of 4 Nos. Hydraulic Shovels of Khadia Project for a period of 624 days.
2022_NCL_255797_1
KHD/G.M. (Excv)/E-Tender/22-23/572
Open Tender
Excavation Department Work
Item Rate
624 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,100
24 Nov 2022
8 Sept 2022
24 Sept 2022
8 Sept 2022
23 Sept 2022
9 Sept 2022
8 Sept 2022 - 16 Sept 2022
Amount
Scope of Work/Technical Specification: 1. Complete cleaning of dust, mud, grease and oil etc. 2. Cleaning of operator cabin, safety glasses, light assemblies, etc. 3. Removal of dry mud from where it is deposited.
Cost for up keeping, cleaning of 88.80 square meter area (22.20 sqm area/day/shovel) to be cleaned of machine housing including material handling of lubricants barrels, loading and unloading & other cleaning work including operator cabin, undercarriage track chain and rollers mud by 4 Nos. un-skilled manpower per day of four nos. Hydraulic shovels [BE700, Tata Hitachi ZX650H, PC2000-8 SL No.1 and SL No.2] of Khadia Project for a period of 624 Days including CMPF as per scope of work.
Total impact of GST for the purpose of CTC
VEER CONSTRUCTION
LION INDIA CONSTRUCTION
M/s. Pankaj Kumar Tiwari
stage.html
html • 0.04 MB
techsummary_264474.pdf
PDF • 0.10 MB
finsummary_264474.pdf
PDF • 0.10 MB
scan0409.pdf
PDF • 1.01 MB
finance_264474.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .