Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC 901 GH 83 SECTOR 20 PANCHKULA 134116 | PANCHKULA | HARYANA | 134116 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹11.5 L+₹1.8 L (18.2%)Rejected-Finance 3082 SECTOR 20D CHANDIGARH 160 020 | CHANDIGARH | CHANDIGARH | 160020 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹11.9 L+₹2.2 L (22.2%)Rejected-Finance 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L3 | Rejected-Finance NOT LOWEST |
Tender Value
₹9.7 L
EMD Value
₹19,460
Closing Date
25 Jul 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Patiala
HQ CWE BLDG No 26 New Lal Bagh Patiala - 147001
REPAIR AND MAINTENANCE OF HT DISTRIBUTION SYSTEM/INSTALLATION AT MIL STN DAPPAR UNDER GE (P) DAPPAR
2020_MES_312505_4
8319/PAT/T-47/E8
Open Tender
Civil Works
Lump-sum
120 days
Dappar
As per cover 1
6 documents required · 6 mandatory
₹500
Yes
GE PROJECT DAPPAR
₹19,460
Yes
5 Sept 2020
6 Jul 2020
27 Jul 2020
6 Jul 2020
25 Jul 2020
13 Jul 2020
6 Jul 2020 - 10 Jul 2020
60 days
Amount
Schedule 'A'Section-I (EXINTERNAL ELECTRIFICATION WORKS)
Total amount of Sch 'A' Sec I (ExInternal Electrification Works)
Schedule 'A'Section-II (Misc Items of Works) Note : This schedule is not pre-priced by MES and the pre-priced rate indicated as "Rs 0.00" under Col. 5 siginifies this fact only.
Supplying, installing, testing and commissioning in replacement of old GODs complete HT 11 kV, 200 Amp outdoor type gang operated single air-break switch, triple pole, tilting type, vertical mounting, mechanically operated consisting of hot dip galvanised channel iron base having 3 Nos 11 KV Post type insulator in stack - 3 stack per phase, copper or copper alloy high pressure heavily tinned contacts, MS arcing horns capable of breaking the magnetizing current with operating mechanism worked from ground level complete with horizontal connecting square bar, GI pipe of size not less 25mm dia, medium grade and of suitable length as down rod levers coupling & operating handle with locking arrangement connected with new ACSR conductor (jumper) - set of 3 duly logged incoming and out going with steel nut bolts and washers incld. dismantling and taking out old switch and connections complete complying to IS 9921/1985 (Part I to IV) or its latest amendment all as specified and directed by Engr-in-Charge. NOTE - The quoted rate is deemed to be inclusive of cost of cutting, welding, drilling etc. and other jobs incld. cost of nut, bolts, washers, etc. minor items required for the efficient operation of GOD.
Supply and install drop out fuse in replacement of old DOs complete, HT 11 kV, 200 Amps fuse link consisting of channel iron base having 1 No 11 KV post type insulators in stack & 2 stack per phase complete with fuse carrier of SRBP tube with heavily tinned non ferrous metal parts and spring loaded phosphor bronze contact complete manufactured as per IS 9385 complete all as specified and directed. NOTE - The quoted rate is deemed to be inclusive of cost of cutting, welding, drilling etc. and other jobs incld. cost of nut, bolts, washers, etc. minor items required for the efficient operation of DO fuse unit.
upply, laying in replacement, in trenches /ducts/fixing on pole/STR with suitable size of GI clamps made out of GI strip 32 mm x 6 mm, XLPE insulated, screened, earthed, PVC bedded, galvanised steel strip, electric power cable (heavy duty) of size 3 x 120 sqmm with aluminium conductor suitable for 11 kV (E) grade as per relevent IS including latest amendment for IS testing, commissionong along with S&F for HT cable route indicator for every 100 m with suitable PCC Foundation complete all as specified and directed including taking out of old burnt out cable alongwith cable covers. Note:- (a) Earth work, EHV cable cover, sand coushioning & GI pipe will be measured and paid seperately. (b) High voltage test to be conducted at site with suitable voltage before and after laying of HT cable and reading shall be recorded jointly and test report to be submitted in triplicate to the Engineer-in-Charge. The cost of the same shall be deemed to be included in the unit rate quoted above.
as per srl item No. 04 above but XLPE insulated, screened, earthed, PVC bedded, galvanised steel strip, electric power cable (heavy duty) of size 3 x 95 sqmm with aluminium conductor suitable for 11 KV (E) grade.
M&L for disc insulator porcelain vitreous brown 145 mm height & 225 mm dia ball and socket type two in series assembly with cast aluminium 4 U bolt tension hardware and tension clamps for conductors working pressure HT 11 kV complete all as specified and directed.
S&F Male contact (gunmetal) suitable for vertical operating type GOD 11 kV grade, 200 Amps rating in position as in replacement including testing and commissioning to the complete satisfaction of Engr-in-Charge.
As per srl item No. 08 but Female gunmetal contact.
As per srl item No. 08 but Tinned copper flexible jumper.
M&L for fixed type top contact for DO fuse units 11 kV in replacement complete all as specified and directed.
M&L for fixed type bottom contact for DO fuse units 11 kV in replacement complete all as specified and directed.
Dismantling rusted/unsv GI pipe operating handle of any size of GOD complete.
M&L GI pipe of size 25mm dia, medium grade, as down rod levers coupling & operating handle of the existing GOD cut to suitable length including fixing up the same and commissioning of the respective GOD complete. NOTE - The quoted rate is deemed to be inclusive of cost of threading, cutting of pipe incld. cost of nut, bolts, washers, etc. minor items required for the efficient operation of GOD.
M & L for servicing, greasing, cleaning of GOD, adjustment of its operation, cleaning and checking (for any type of damage) of insulators and lightening arresters incl. tightening of all loose nuts & bolts on the HT structure at site complete all as specified and directed by Engineer-in-Charge. NOTE :- 1. All the necessary tools, tackles and ladder shall be arranged by the contractor for the subject work. 2. Contractor has to arrange for necessary cleaning agent (petrol, diesel, CRC 2-26 etc.) and lubricating material like grease, oil and lubricating sprays if any, as required for subject work. 3. Major spares required to be replace during servicing will be measured and paid under relevant item as specified in the schedule hereforth
S&F in replacement heavy duty station class, Gap less type Metal oxide lightning arrestors, 12 kV of 10kA rupturing capacity complete with all fittings distribution class suitable for 11KV earthed system discharge capacity 65 Kilo Amps complete all as specified and directed. Modifications to support structure as per OEM Requirements shall be the scope of Contractor. No Extra payment will be entertained on this account Make:- BHEL/ ELPRO/ CROMPTON GREAVES
M&L for Boring of holes under road, pavement, hard standing by trenchless technology using ultra sound technique and necessary machine including HDPE pipe of 150 mm dia suitable for 0.4 mpa working pressure complete all as specified and as directed. NOTE - (a). Cost of cutting out of trench for accomodating the machine and making good to the surface after completion of the job are deemed to be inclusive in the quoted rate. (b). Contractor has to rectify any damage to cables, pipes or other govt. property free of cost to the complete satisfaction of Engr-in-Charge. (c). Any extra excavation or the any other connected jobs required other than as mentioned in the scope of work will be measured and paid under the relevant items of this schedule.
M&L for application of aluminium paint two coats after removal of old paint, rust, dust, oil, grease and any other foreign deposits by paint removers or burning off by blow lamps and cleaning with scrapers and chemicals for removal of rust for any number of coats, any width or girth incl. painting five no. strips of 30 cm each on bottom of pole with black and red colour paint, alternately, all as specified and directed for 2 pole structure.
S&F ACP (aluminium composite panel) 4 mm thick composed of non combustible virgin LDPE laminated sandwitched between two fine aluminium sheets 0.25mm thick on both sides painted with blue colour polyster paint inclusive of folding and cutting with machine to obtain require shape and size fixing the same on M.S. channels/Poles, wall, etc. with nuts/bolts or screws/anchor fasteners, etc. complete all as directed and specified.
Material & labour for dismantling of top cover alongwith conservator tank, disconnecting HT/LT cables/from HT/LT bushing rod & earthing strips, nuts & washers etc for filteration of transformer oil, refitting top cover & conservator tank after cleaning, removing the sludge including replacement of gasket, nuts, bolts & washers, reconnecting HT/LT cable/conductor and earthing strips,testing the transformer on load complete all as directed for transformer of rating upto and incl. 300 KVA.
M&L for dehydration/filteration of transformer oil with mobile transformer filteration plant at site with all required accessories connected to transformer and carrying out filteration of old transaformer oil for the desired dielectric strength of 60 KV at 2.5mm gap all as specified and directed.
Material only transformer oil low viscoscitiy EHV grade having 60 KV di-electric strength conforming to IS-335 in orginal company sealed drum for replacement or topping up to oil level mark at the conservator all as specified and directed by Engr-in-CHarge.
Supply & fix in replacenment of Breather assembly complete directed and specified by the Engr-in-Charge.
M&L for replacement of existing unserviceable silica gel granules with new Self-indicating Orange to Green Silica Gel granules from transformer breather assembly all as specified and directed by Eng-in-Charge.
S&F inspection glass and gasket of conservator of transformers of capacity 63 KVA to 300 KVA after draining out oil and refilling the same after filteration all as specified and directed by Engr-in-Charge.
Repairs and maintenence of 11 KV 800A HV VCB Crompton make, 50 Hz 350 MVA yearly 02 (two) times as under :- (i). Ensuring the switching OFF operation of the VCB positively by racking it out at service position & testing its manual & electrical ON-OFF operations by applying control panel supply source, repair/replacement of the defective components. (ii). After ensuring the VCB is in isolated position, inspection of entire breaker mech parts like, breaker ON OFF operations, mech gear drive assy, closing & tripping mechanisms, spring charging indications, ON-OFF mechanical indications, condition of main closing & tripping spring assy, allied hardwares & it's tightness and alignments. (iii). Inspection of Electrical parts - motor assy, aux block operations, tripping & closing coil operations, main male-female contacts, insulating material, insulating oil healthiness, etc.(iv). Checking operation of relays. (vi). Checking and recording of IR value of VCB trolley and panel.(vii). Checking/repairing/rectification of the control wiring. . (xi). Checking & updating all mech + electrical critical settings of VCB like closing & tripping & trouble free operations. (xii). Checking VCB manual ON-OFF operations by local closing & tripping push assy. (xiii). Checking VCB electrical ON-OFF operations by applying control supply source. VCB should switch ON & OFF by breaker ON-OFF control switch which in installed on control panel. VCB tripping operations to be checked using protection relay units like LSIG realy + master trip realy units + other tripping units installed in the breaker. (xiv). Ensuring if VCB is in trip position, it should not re-close again, even when closing command is applied. (xv). Ensuring VCB's positive & trouble free performance in service position by switching ON the plant load. (xvi). Checking fibre plates, gaskets, , applying properly with LICOM 2 HPCL make/Balmier Lawire make grease or equivalent one using help of grease gun to VCB cradle, racking in-out assy, mech rubbing parts + bushing assy & dry graphite conductive sealant to contacts of PT etc. & re-assembling the same and commissioning complete to the entire satisfaction of Engr-in-Chrg. incld. testing of polarities of CTs. (xvii). High voltage testing with high voltage tester of CT & Breaker pole to with stand working pressure of HT 22 KV to ascertain servicieability and spare parts found defective to be replaced for smooth functioning as directed by Engr-in-Chrg. (xviii). Labour only for opening the busbar chamber of HT board cleaning the bus bar chamber, cleaning of entire dust in side the control panel + VCB by using dry air pressure, inspect the CT's wiring, spout insulator & bus-bar joints & tightening if required & heating up with hot air blower to remove moisture, meggering, HV testing applying TRTPPEX(B) s
M&L for complete overhauling, testing, calibrating and commissioning of numerical relay/electro-mechanical relay - 1 UV/OV relay + 1 earth fault/O/C + 1 master trip relay by secondary injection on each multiple settings of relays by injecting artificial load to ascertain correctness completely including primary injection through CTs by injecting artificial load on each multiple setting of relay to check correctness as well setting the relay at the settings which is inco-ordination with the MSEDCL sub-station (source) and as per the further downstream distribution of HV breakers complete all as specified and directed. NOTE - (a). The contractor has to test the functioning/tripping operations of relay caliberated to the complete satisfaction of Engr-in-Charge alongwith the two copies test reports. A total no. of three hard copies and one soft copy (CD) of the reports shall be submitted. (b). The contractor has to arrange for electrical shutdown prior to carry own repairs incld. switching OFF of VCB positively and racking it out at service position.
Testing of transformers of various capacities installed at various locations under by performing following tests - 1.IR Value on L.V & H.V side using 500 V & 5KV Megger respectively. 2.Ratio on all the taps. 3.Magnetic Balance tests on L.V & H.V. 4.Vector group. 5.Magnetizing current. 6.Winding Resistance Test on H.V & LV terminals. Note : i) Contractor should make his own arragement of testing equipments and electric supply so required. (ii) A detailed Test Report should be submitted to Engr-in-Charge.
M&L for for painting of transformers of 63 to 125 KVA ratings with two coats of first quality synthetic enamel paint by spray painting technique after cleaning the body surface of transformer by rubbing with emery paper to remove oil stains, dust etc including writing SM/MES numbers all as directed by Engineer in Charge.
M&L for for painting of transformers of 200 to 300 KVA ratings with two coats of first quality synthetic enamel paint by spray painting technique after cleaning the body surface of transformer by rubbing with emery paper to remove oil stains, dust etc including writing SM/MES numbers all as directed by Engineer in Charge.
M&L for replacing unserviceable drain valve 50 mm size of various transformers after draining out transformer oil and refilling the oil into the transformer all as specified and directed by Engineer in Charge.
M&L for rewinding of HT coils with super enamelled copper winding wire of appropriate gauge and proper number of turns to get the same capacity along with insulating materials e.g. leatheriod paper insulation, cotton tape, empire tape, wooden blocks, PVC sleeves, soldering job, varnishing and heating, drying etc complete as directed by Engineer in Charge.
All as per item No 32 here in before but of LT coils with super enamelled class 'B' copper strip with Electrical Grade Insulating Kraft paper all confirming to IEC-60554-3-5 (1984).
Taking down defective distribution transformer 11/0.433 KV capacity 50 KVA to 300 KVA from 2 pole structure / 4 pole structure / plinth mounted and transportation to workshop and back after carrying out necessary repairs / replacement of defective parts and refixing, including installation, commissioning testing on load as specified. Opening of transformer top cover by unscrewing nuts, bolts etc and keeping aside and getting out transformer oil, isolation of HV & LV winding from tank and checking, testing by technical expert team, Rewinding of 11 KV HT / LT side out of 11 / 0.433KV, distribution transformer with super enameled copper conductor as per existing size and gauge with providing 'F' class insulating materials and carrying out varnishing, drying by electric furnace. Note : HT/LT Coil for rewinding of transformer shall be measured seperately in respective item.
M&L in repairs Heat shrinkable outdoor type end termination cable jointing kit suitable for earthed 3 core 120/185 sqmm HT 11KV XLPE aluminium conductor cable incld. disconnecting concerned cable, cutting out burnt/damaged jointing kit, jointing new kit inld. testing and commissioning of the complete cable to the complete satisfaction of Engr-in-Charge all as specified and directed. Make:- Raychem/M-Seal/Denson. NOTE- a. The quoted rate is deemed to be inclusive of cost of saddling or clamping of cable all as directed by Engr-in-Charge. b. Contractor has to arrange proper electrical shutdown after informing to depratment concerned.
All as per Item No. 35 above but 95 Sqmm 3 core cable
All as per Item No. 35 above but 240 Sqmm 3 core cable.
All as per Item No. 35 above but Heat shrinkable indoor type end termination cable jointing Kit suitable for earthed 3 core 95 Sqmm HT 11kV XLPE aluminium conductor cable.
All as per Item No. 35 above but Heat shrinkable indoor type end termination cable jointing Kit suitable for earthed 3 core 120 Sqmm HT 11kV XLPE aluminium conductor cable.
All as per Item No. 35 above but Heat shrinkable indoor type end termination cable jointing Kit suitable for earthed 3 core 240 Sqmm HT 11kV XLPE aluminium conductor cable.
M&L in repairs Heat shrinkable straight through cable jointing kit suitable for earthed 3 core 185/120 sqmm HT 11 kV XLPE aluminium conductor cable incld. disconnecting concerned cable, cutting out burnt/damaged jointing kit, jointing new kit inld. testing and commissioning of the complete cable to the complete satisfaction of Engr-in-Charge all as specified and directed. Make:- Raychem/ XICON/ M-Seal/Denson. NOTE- (a). The quoted rate is deemed to be inclusive of cost of saddling or clamping of cable all as directed by Engr-in-Charge. (b). Contractor has to arrange proper electrical shutdown after informing to depratment concerned. (c). Cost of connected excavation, soil removal, returning filling in, sand cusshioning and cable covers will be measured and paid in the respective items of the Schedule.
All as per Item No. 41 above but straight through cable jointing kit suitable for earthed 3 core 95 sqmm HT 11KV XLPE aluminium conductor cable
All as per Item No. 41 above but straight through cable jointing kit suitable for earthed 3 core 240 sqmm HT 11KV XLPE aluminium conductor cable
LONGIA ENGINEERS
R D Bansal
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .