Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.3 Cr+₹23.7 L (4.66%)Admitted-Finance | ₹5.3 Cr+₹23.7 L (4.66%) | L2 | Admitted-Finance |
| 3 | L3₹5.5 Cr+₹40.2 L (7.90%)Admitted-Finance | ₹5.5 Cr+₹40.2 L (7.90%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 Cr+₹41.6 L (8.18%)Admitted-Finance | ₹5.5 Cr+₹41.6 L (8.18%) | L4 | Admitted-Finance |
| 5 | L5₹5.5 Cr+₹41.6 L (8.18%)Admitted-Finance | ₹5.5 Cr+₹41.6 L (8.18%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Samruddhi Construction L12 | Ruby enterprises L13 | ONIX ENCLAVES PVT LTD L3 | Cordant Associates Pvt.Ltd. L2 | Shri Venkateshwara Engineers L5 | FIXO FIT WELL L15 | D G ENTERPRISES L11 | SHREE SIDDHIVINAYAK ENGINEERS & CONTRACTORS L9 | Deva Construction and Project L8 | Rohit Telecommunication L14 | Om Veeraya Engineering L4 | Shreenath Construction & labour contractor L1 | Multiple Industrial Services L16 | GURUKRUPA ENTERPRISE L10 | TELELINK L7 | DEEP GAS SYSTEM L17 | cordant engineerings india pvt.ltd. L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | INSTALLATION OF DOMESTIC METER-CU/GI-CONVERSION:
SOR covers the Installation, testing painting commissioning of GI pipe up to 10 m from Tee point/MCV-I to MCV-II including/ or Testing & Commissioning of domestic Meter, regulator, GI/Copper Service Pipes and Conversion of domestic appliance with supply of rubber tube as per contract.
"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI & Copper pipes and supply of necessary GI / copper fittings (like elbow, coupler, tee etc) required for installation of GI and copper tubing as per Technical Specification and satisfaction of EIC. The required GI & copper fittings shall be procured from vendors who have supplied these items for similar application earlier and with prior approved of Client / Consultant.
GI service pipes shall be installed from MCV1 to MCV2 and as up-down stream of meter in case meter is installed outside the kitchen, Copper service pipes shall be installed (rate of drilling holes of all size are included in the rate) from the Up & downstream of meter upto the valve before the customers' appliance as per MNGL's SOP. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the CU/GI or combination of both pipe/tubes.
Installation of Domestic Meter: Installation & Fixing of meters with associated inlet and outlet connections/ fittings, valves approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.
Installation of domestic Regulator : Installation & Fixing of Domestic regulator with associated inlet and outlet connections/ fittings, purging valves approved regulator brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification.
Conversion of appliances: Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge.
Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge. | 20,000 | Nos. | 2,100 ₹4,20,00,000 | 2,800 ₹5,60,00,000 | 2,400 ₹4,80,00,000 | 2,400 ₹4,80,00,000 | 2,400 ₹4,80,00,000 | 2,860 ₹5,72,00,000 | 2,800 ₹5,60,00,000 | 2,800 ₹5,60,00,000 | 2,439 ₹4,87,80,000 | 2,772 ₹5,54,40,000 | 2,400 ₹4,80,00,000 | 2,079 ₹4,15,80,000 Lowest | 2,840 ₹5,68,00,000 | 2,800 ₹5,60,00,000 | 2,500 ₹5,00,00,000 | 4,725 ₹9,45,00,000 | 2,499 ₹4,99,80,000 |
| 2.00 | INSTALLATION OF EXTRA CU PIPE: (Over and above 5m length)
SOR covers the installation of Cu pipe over and above the allowable (5m) length and contractor has to ensure the recovery of such installation from customer, failing which will be recover for the contractor. | 25,000 | M | 300 ₹75,00,000 | 30 ₹7,50,000 | 20 ₹5,00,000 | 30 ₹7,50,000 | 15 ₹3,75,000 Lowest | 35 ₹8,75,000 | 30 ₹7,50,000 | 25 ₹6,25,000 | 64 ₹16,00,000 | 80 ₹20,00,000 | 15 ₹3,75,000 Lowest | 80 ₹20,00,000 | 390 ₹97,50,000 | 55 ₹13,75,000 | 20 ₹5,00,000 | 73 ₹18,25,000 | 32 ₹8,00,000 |
| 3.00 | CONVERSION OF STOVE:
This SOR covers the conversion of stove where Meter and Cu is already installed including satisfactory testing and Pre-commissioning of the installed system.
Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge.
Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge. | 5,000 | Nos. | 1,000 ₹50,00,000 | 200 ₹10,00,000 | 200 ₹10,00,000 | 130 ₹6,50,000 | 115 ₹5,75,000 Lowest | 250 ₹12,50,000 | 250 ₹12,50,000 | 150 ₹7,50,000 | 280 ₹14,00,000 | 280 ₹14,00,000 | 115 ₹5,75,000 Lowest | 235 ₹11,75,000 | 230 ₹11,50,000 | 200 ₹10,00,000 | 300 ₹15,00,000 | 273 ₹13,65,000 | 130 ₹6,50,000 |
| 4.00INSTALLATION OF GI PIPE THREADED: Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.) "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipes of all sizes, Isolation and appliance valves (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of GI fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials (except Owner supplied materials), consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Preparation and approval of schedules, execution procedures, sketches. Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. Making temporary but stable platforms/ scaffolding/ rope ladders and all other safety devices. Installation of GI Pipes & Fittings, Valves etc. including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/ Consultant. Any other activity(such as drilling holes of all size & glass cutting, installation of regulator"4bar-21mbar" in the riser and two MCV in lateral for each house are included in this rate) not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule. Liasioning and Follow-up for permission with all the concerned customer, society member etc. is the scope Contractor. | ||||||||||||||||||||
| 4.10 | ½” GI pipe | 2,000 | M | 215 ₹4,30,000 | 180 ₹3,60,000 | 220 ₹4,40,000 | 190 ₹3,80,000 | 210 ₹4,20,000 | 180 ₹3,60,000 | 100 ₹2,00,000 Lowest | 100 ₹2,00,000 Lowest | 270 ₹5,40,000 | 230 ₹4,60,000 | 210 ₹4,20,000 | 205 ₹4,10,000 | 240 ₹4,80,000 | 150 ₹3,00,000 | 275 ₹5,50,000 | 211 ₹4,22,000 | 200 ₹4,00,000 |
| 4.20 | ¾” GI Pipe | 1,000 | M | 250 ₹2,50,000 | 200 ₹2,00,000 | 220 ₹2,20,000 | 170 ₹1,70,000 | 210 ₹2,10,000 | 185 ₹1,85,000 | 100 ₹1,00,000 Lowest | 100 ₹1,00,000 Lowest | 298 ₹2,98,000 | 210 ₹2,10,000 | 208 ₹2,08,000 | 230 ₹2,30,000 | 245 ₹2,45,000 | 250 ₹2,50,000 | 275 ₹2,75,000 | 242 ₹2,42,000 | 190 ₹1,90,000 |
| 4.30 | 1” GI Pipe | 200 | M | 250 ₹50,000 | 200 ₹40,000 | 220 ₹44,000 | 170 ₹34,000 | 208 ₹41,600 | 450 ₹90,000 | 100 ₹20,000 | 60 ₹12,000 Lowest | 409 ₹81,800 | 200 ₹40,000 | 208 ₹41,600 | 280 ₹56,000 | 250 ₹50,000 | 250 ₹50,000 | 300 ₹60,000 | 255 ₹51,000 | 190 ₹38,000 |
| 5.00 | TESTING & COMMISSIONING OF ALREADY LAID GI PIPE:
Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.) SOR covers Jointing of GI pipes, testing, purging, commissioning and painting of the complete installation as per specification. Restoring the wall surface to original condition etc. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.
Painting of already laid GI pipe: Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. | 5,000 | M | 200 ₹10,00,000 | 40 ₹2,00,000 | 50 ₹2,50,000 | 20 ₹1,00,000 | 5 ₹25,000 Lowest | 70 ₹3,50,000 | 50 ₹2,50,000 | 35 ₹1,75,000 | 39 ₹1,95,000 | 40 ₹2,00,000 | 5 ₹25,000 Lowest | 40 ₹2,00,000 | 38 ₹1,90,000 | 55 ₹2,75,000 | 45 ₹2,25,000 | 29 ₹1,45,000 | 30 ₹1,50,000 |
| 6.00 | DISMANTLING & INSTALLATION OF CU PIPE:
Dismantling of copper pipe laid by another contractor & installation of new copper pipe ,"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied Copper pipes & supply of necessary fittings required for installation of copper tubing as per Technical Specification and satisfaction of EIC. The copper fittings shall be procured from approved vendors with prior approved of Client / Consultant. SOR covers dismantling (if required) or reinstallation of Cu pipe, testing, commissioning etc. which is recuired to complete the job.
Copper service pipe shall be installed (rate of drilling holes of all size are included in the rate) from the up-downstream of meter upto the valve before the customers' appliance as per MNGL's Drawing to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the tubes. | 2,000 | M | 300 ₹6,00,000 | 150 ₹3,00,000 | 200 ₹4,00,000 | 30 ₹60,000 Lowest | 49 ₹98,000 | 65 ₹1,30,000 | 65 ₹1,30,000 | 30 ₹60,000 Lowest | 129 ₹2,58,000 | 160 ₹3,20,000 | 49 ₹98,000 | 330 ₹6,60,000 | 415 ₹8,30,000 | 100 ₹2,00,000 | 100 ₹2,00,000 | 155 ₹3,10,000 | 32 ₹64,000 |
| 7.00DMA activities in the Allocated Area | ||||||||||||||||||||
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
23 Feb 2022, 3:00 pmClosed
Cheif Manager (C and P)
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune-411045
Tender for Rate Contract for appointment of the Contractors to attend D-PNG online connection and conversion requests with DMA activity for CGD Network of MNGL, Pune.
2022_MNGL_104103_1
MNGL/CP/2021-22/230
Open Tender
Miscellaneous Works
Works
365 days
Pune
As per tender document
15 documents required · 15 mandatory
₹0
₹2 L
Yes
MNGL, Baner, Pune
13 Apr 2022
2 Feb 2022
24 Feb 2022
2 Feb 2022
23 Feb 2022
2 Feb 2022
9 Feb 2022
Amount
INSTALLATION OF DOMESTIC METER-CU/GI-CONVERSION: SOR covers the Installation, testing painting commissioning of GI pipe up to 10 m from Tee point/MCV-I to MCV-II including/ or Testing & Commissioning of domestic Meter, regulator, GI/Copper Service Pipes and Conversion of domestic appliance with supply of rubber tube as per contract. "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI & Copper pipes and supply of necessary GI / copper fittings (like elbow, coupler, tee etc) required for installation of GI and copper tubing as per Technical Specification and satisfaction of EIC. The required GI & copper fittings shall be procured from vendors who have supplied these items for similar application earlier and with prior approved of Client / Consultant. GI service pipes shall be installed from MCV1 to MCV2 and as up-down stream of meter in case meter is installed outside the kitchen, Copper service pipes shall be installed (rate of drilling holes of all size are included in the rate) from the Up & downstream of meter upto the valve before the customers' appliance as per MNGL's SOP. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the CU/GI or combination of both pipe/tubes. Installation of Domestic Meter: Installation & Fixing of meters with associated inlet and outlet connections/ fittings, valves approved meter brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification. Installation of domestic Regulator : Installation & Fixing of Domestic regulator with associated inlet and outlet connections/ fittings, purging valves approved regulator brackets and other supports by proper scaffolding/ grouting, Restoring the area to original condition as per specification. Conversion of appliances: Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge. Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge.
INSTALLATION OF EXTRA CU PIPE: (Over and above 5m length) SOR covers the installation of Cu pipe over and above the allowable (5m) length and contractor has to ensure the recovery of such installation from customer, failing which will be recover for the contractor.
CONVERSION OF STOVE: This SOR covers the conversion of stove where Meter and Cu is already installed including satisfactory testing and Pre-commissioning of the installed system. Conversion of all types of LPG kitchen appliances to NG based appliances. Supply & changing of nozzles/ jets/grill/oven and associated controls for domestic & imported appliances with proper tools & tackles. Supply and installation of Steel Braided Hose (Suraksha make or Equivalent with ISI mark) between Appliance Valve and the Appliance, wherever required as per the instructions of the Engineer-In-Charge. Cleaning and performing minor maintenance, greasing etc. of domestic appliance, testing/ showing performance to the customer ,signing of joint meter records (JMR) & uploded in system and instructing customer on use & safety norms, complete as per specifications & to satisfaction of customer/Engineer-in-charge.
INSTALLATION OF GI PIPE THREADED: Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.) "Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied GI pipes of all sizes, Isolation and appliance valves (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover , including supply of GI fittings/accessories of all sizes & thickness like Elbows, Tees, unions, sockets, reducers, GI plugs etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials (except Owner supplied materials), consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Preparation and approval of schedules, execution procedures, sketches. Finalisation of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. Making temporary but stable platforms/ scaffolding/ rope ladders and all other safety devices. Installation of GI Pipes & Fittings, Valves etc. including NPT threading, painting as specified (installation of meters & regulators forms a separate SOR item). Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through tiles/ wood/ marble/ Granite etc. jointing of PE to above Ground service GI pipes, testing, purging with Nitrogen and commissioning of the complete installation as per specification. Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/ Consultant. Any other activity(such as drilling holes of all size & glass cutting, installation of regulator"4bar-21mbar" in the riser and two MCV in lateral for each house are included in this rate) not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule. Liasioning and Follow-up for permission with all the concerned customer, society member etc. is the scope Contractor.
½” GI pipe
¾” GI Pipe
1” GI Pipe
TESTING & COMMISSIONING OF ALREADY LAID GI PIPE: Excluding supply of all GI pipes, Isolation and appliance valves (as free issue items) but, Including supply of all GI fittings like Elbows, Tees, unions, sockets, reducers, GI plugs etc. as required to complete the job. (Particular job specification.) SOR covers Jointing of GI pipes, testing, purging, commissioning and painting of the complete installation as per specification. Restoring the wall surface to original condition etc. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. Painting of already laid GI pipe: Painting of pipe & fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original condition. All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge.
DISMANTLING & INSTALLATION OF CU PIPE: Dismantling of copper pipe laid by another contractor & installation of new copper pipe ,"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied Copper pipes & supply of necessary fittings required for installation of copper tubing as per Technical Specification and satisfaction of EIC. The copper fittings shall be procured from approved vendors with prior approved of Client / Consultant. SOR covers dismantling (if required) or reinstallation of Cu pipe, testing, commissioning etc. which is recuired to complete the job. Copper service pipe shall be installed (rate of drilling holes of all size are included in the rate) from the up-downstream of meter upto the valve before the customers' appliance as per MNGL's Drawing to the satisfaction of EIC. The Contractor to provide all equipment, tools and material necessary to execute the work in an efficient manner by cutting, cleaning, flux application, soldering and lacquering. The work includes supply of all tools, tackles and consumables including clamps for fixing the tubes.
DMA activities in the Allocated Area
D-PNG Registration Gasified Society
Collection of KYC
Registration through MNGL web site.
Notes : 1. The Schedule of Rates shall be read with all other sections of this bid document. 2. The contractor is deemed to have studied the drawings, specifications and details of works to be done within the time schedule and should have acquainted himself of the conditions prevailing at site. 3. The SOR items would be operatable as per job requirement and quantities may vary on +/- sides. 4. The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevant clauses of the specifications. 5. The above quantities are tentative and may vary considerably depending upon site conditions, methodology adopted as per site requirement with due approval of owner. 6. Evaluation and comparison shall be done on overall basis least cost to the MNGL. 7. The rate should be ALL INCLUSIVE, including all expenses, other costs & charges etc. 8. Taxes & Duties if any shall be indicated clearly in your quotation and total amount should be inclusive of all taxes etc. 9. Bidder shall note that any error in estimating Taxes & Duties will be to Bidder's Account.
Cordant Associates Pvt.Ltd.
ONIX ENCLAVES PVT LTD
Om Veeraya Engineering
Shri Venkateshwara Engineers
cordant engineerings india pvt.ltd.
TELELINK
Deva Construction and Project
SHREE SIDDHIVINAYAK ENGINEERS & CONTRACTORS
GURUKRUPA ENTERPRISE
D G ENTERPRISES
Samruddhi Construction
Ruby enterprises
Rohit Telecommunication
FIXO FIT WELL
Multiple Industrial Services
DEEP GAS SYSTEM
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .