Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| 2 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| 3 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| 4 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| 5 | L1₹77.5 LAdmitted-Finance | ₹77.5 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SRI HITESH KALITA L1 | M/S K.B. ENGINEERS L1 | MS D.M. ENTERPRISE L1 | PRAKASH ENTERPRISES L1 | M/S M R ENTERPRISE L1 | M/S SHIVAM ENTERPRISE L1 | M/S PADMA STORE L1 | KANAK CHANDRA GOSWAMI L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing of deposited compact water hyacinth root, other aquatic plants, garbage, plastics etc. from the bed of Drainage Channel including cutting, removing and stacking at places away from the bank etc. with all lead and lift etc. complete as directed. | 30,997 | sqm | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest | 124.81 ₹38,68,735.57 Lowest |
| 2.00 | Shifting / loading of 1(one) no. hired Iron Barge using 2 (two) heavy-duty hydraulic cranes and 1 (one) low-bed trailer for carriage to the worksite including unloading at site for cleaning and excavation works and reloading at worksite for carrying back after completion of work.
i) Heavy duty crane : 2 Cranes x2 operations x 1 nos.= 4 operations | 4 | operation | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest | 15,000 ₹60,000 Lowest |
| 3.00 | ii) Low bed trailer: 1 Trailer x 2 operations x 1 nos.= 2 operations | 2 | operation | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest | 40,500 ₹81,000 Lowest |
| 4.00 | Hire Charge of Iron Barge as per IS specification for mounting of Chain mounted hydraulic excavator – 71/80.
Qty = 1 Nos/month. x 1.5 months = 1.5 nos | 1.5 | nos | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest | 93,500 ₹1,40,250 Lowest |
| 5.00 | Hire charges for heavy-duty flat low-bed trailer for carriage of hired chain-mounted hydraulic excavators including loading and unloading, fuel, POL, operator, helper etc. to the designated worksite – 3 nos. excavator x 1 operation = 3 operations | 3 | operation | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest | 30,000 ₹90,000 Lowest |
| 6.00 | Hire charges for deployment of Chain Mounted Excavator – 71/80 with bucket capacity of 0.60 cum mounted on iron barge for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation etc. as directed including cost of operator, maintenance, fuel/POL and all incidental charges on daily basis considering 7 to 9 working hours per day. | 360 | Hours | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest | 2,403 ₹8,65,080 Lowest |
| 7.00 | Hire charges for deployment of Chain Mounted Hydraulic Excavators – 210/220 with bucket capacity of 0.90 cum for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation etc. as directed including cost of operator, maintenance, fuel / POL and all incidental charges on daily basis considering 7 to 9 working hours per day. | 720 | Hours | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest | 3,333 ₹23,99,760 Lowest |
| 8.00 | Engagement of ordinary labours for various assisting & helping requirements during de-siltation and excavation works of the drainage channel for watch keeping duty, clearing light jungles and trees from work site etc. | 180 | Manday | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest | 402.33 ₹72,419.4 Lowest |
| 9.00 | Engagement of ordinary labour for intermittent cleaning of drainage channel during the rainy season from May to October 2026, considering 2 days per month (total 12 days), including removal of floating garbage, aquatic weeds etc. | 120 | Manday | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest | 402.33 ₹48,279.6 Lowest |
| 10.00 | Hire charge of Country boat with capacity of 20 to 40 Quintal (without boatman) to facilitate cleaning & maintenance work of the channel. | 90 | No. | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest | 1,416 ₹1,27,440 Lowest |
Tender Value
₹77.5 L
EMD Value
₹1.6 L
Closing Date
26 Mar 2026, 2:00 pmClosed
Chief Engineer, WRD, Assam
O/o the Chief Engineer, WRD, Assam, AWC Basistha, Ghy 29
Cleaning and De-siltation of the drainage channel outside the AIIMS Guwahati Campus from WRD Pumping Station to Bhetamukh Pumping Station for the year 2025-26.
2026_DoWR_52093_1
ACE (Mech) WR/G-17/ 2026/466
Open Tender
Civil Works
Works
180 days
KAMRUP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹1.6 L
Yes
6 Jul 2026
16 Mar 2026
26 Mar 2026
16 Mar 2026
26 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of deposited compact water hyacinth root, other aquatic plants, garbage, plastics etc. from the bed of Drainage Channel including cutting, removing and stacking at places away from the bank etc. with all lead and lift etc. complete as directed. | 30,997 | sqm | 124.81 | ₹38,68,735.57 |
| 2 | Shifting / loading of 1(one) no. hired Iron Barge using 2 (two) heavy-duty hydraulic cranes and 1 (one) low-bed trailer for carriage to the worksite including unloading at site for cleaning and excavation works and reloading at worksite for carrying back after completion of work.
i) Heavy duty crane : 2 Cranes x2 operations x 1 nos.= 4 operations | 4 | operation | 15,000 | ₹60,000 |
| 3 | ii) Low bed trailer: 1 Trailer x 2 operations x 1 nos.= 2 operations | 2 | operation | 40,500 | ₹81,000 |
| 4 | Hire Charge of Iron Barge as per IS specification for mounting of Chain mounted hydraulic excavator – 71/80.
Qty = 1 Nos/month. x 1.5 months = 1.5 nos | 1.5 | nos | 93,500 | ₹1,40,250 |
| 5 | Hire charges for heavy-duty flat low-bed trailer for carriage of hired chain-mounted hydraulic excavators including loading and unloading, fuel, POL, operator, helper etc. to the designated worksite – 3 nos. excavator x 1 operation = 3 operations | 3 | operation | 30,000 | ₹90,000 |
| 6 | Hire charges for deployment of Chain Mounted Excavator – 71/80 with bucket capacity of 0.60 cum mounted on iron barge for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation etc. as directed including cost of operator, maintenance, fuel/POL and all incidental charges on daily basis considering 7 to 9 working hours per day. | 360 | Hours | 2,403 | ₹8,65,080 |
| 7 | Hire charges for deployment of Chain Mounted Hydraulic Excavators – 210/220 with bucket capacity of 0.90 cum for desiltation and excavation of the drainage channel to the required grade and slope as per section including cutting and dressing of channel bed and slopes, removing deposited silt, debris, vegetation etc. as directed including cost of operator, maintenance, fuel / POL and all incidental charges on daily basis considering 7 to 9 working hours per day. | 720 | Hours | 3,333 | ₹23,99,760 |
| 8 | Engagement of ordinary labours for various assisting & helping requirements during de-siltation and excavation works of the drainage channel for watch keeping duty, clearing light jungles and trees from work site etc. | 180 | Manday | 402.33 | ₹72,419.4 |
| 9 | Engagement of ordinary labour for intermittent cleaning of drainage channel during the rainy season from May to October 2026, considering 2 days per month (total 12 days), including removal of floating garbage, aquatic weeds etc. | 120 | Manday | 402.33 | ₹48,279.6 |
| 10 | Hire charge of Country boat with capacity of 20 to 40 Quintal (without boatman) to facilitate cleaning & maintenance work of the channel. | 90 | No. | 1,416 | ₹1,27,440 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
aiims_bid.pdf
Tender Documents • 0.56 MB
BOQ_82485.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .