Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.7 L
EMD Value
₹3,660
Closing Date
9 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(V.P)
Block Development Office, Sathankulam
Construction of front compound wall(8m), CC Pavement (53 m)at Samathuva Burial Ground in koovaikinaru Village in Komaneri Panchayat
2022_RDTN_259814_1
A2/2122/2022/AGAMT/komaneri4
Open Tender
Civil Works - Others
Item Rate
90 days
Block Development Office, Sathankulam
As per tender document
4 documents required · 4 mandatory
₹0
₹3,660
9 Nov 2022
1 Nov 2022
9 Nov 2022
1 Nov 2022
9 Nov 2022
1 Nov 2022
Amount
Construction of front compound wall(8m), CC Pavement (53 m)at Samathuva Burial Ground in koovaikinaru Village in Komaneri Panchayat
Earth work excavation and depositin on bank with an initial lead of 10m and initial lift of 2 m in hardsitticlay. Stiff black cotton soil, hard red earth, shales,murams, gravel, stony earth and earth mixed with small size boulders SS 20B as per SS 20B
Cement Concrete 1:4:8 mix using 40 mm ISS, HBG metal including cost and conveyance of all materials including all labour charges for laying compacting etc complete
Cement Concrete 1:3:6 mix using 40 mm ISS, HBG metal including cost and conveyance of all materials including all labour charges for laying compacting etc complete
Cement Concrete 1:2:4 mix using 20 mm ISS, HBG metal including cost and conveyance of all materials including all labour charges for laying compacting etc complete
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including all cost and conveyance of all material and all labour charges etc comp
Brick work in Cement Mortar 1:5 mix using country bricks including cost and conveyance of all material including all labour charges for laying compacting etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors etc complete
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Plastering with cm 1:5 mix using 12mm thick including cost and conveyance of all materials of all labour charges etc complete
Exterior emulsion paint two coat with approved quality colour including cost and conveyance of all materials and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.ANTONY SELVAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .