Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹12.6 L+₹6,371 (0.51%)Accepted-Finance | L2 | Accepted-Finance L2 |
Tender Value
₹12.7 L
EMD Value
₹13,000
Closing Date
25 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,PWD., Bldgs (C and M) Dn, VNR.
Executive Engineer PWD Buildings C M Division Virudhunagar
Construction of Boys toilet 1 unit in Government Higher Secondary school campus at Maharajapuram in Watrap Taluk of Virudhunagar District
2026_PWD_724646_1
04/Buildings C and M Div vnr 2026-27 dt 02.11.2026
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Maharajapuram in Watrap Taluk
please refer Tender document
7 documents required · 7 mandatory
₹0
₹13,000
26 Nov 2026
11 Nov 2026
25 Nov 2026
11 Nov 2026
25 Nov 2026
11 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock rock requiring blasting but inclusive of shoring strutting, baling out water wherever necessary and depositing the surplus earth within the compound in places shown by departmental officers with an initial lead of 10mts and initial lift of 2mts and clearing and levelling the site etc. complete complying with standard specification. | 29 | cum | 256.75 | ₹7,445.75 |
| 2 | Earth work open excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock rock requiring blasting but inclusive of shoring strutting, baling out water wherever necessary and depositing the surplus earth within the compound in places shown by departmental officers with an initial lead of 10mts and initial lift of 2mts and clearing and levelling the site etc. complete complying with standard specification. | 22.2 | cum | 110 | ₹2,442 |
| 3 | Supply and filling in foundation and basement with Stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc. complete complying with standard specification and as directed by the departmental officers. | 2.85 | cum | 250.35 | ₹713.5 |
| 4 | Supplying and filling in foundation, basement, etc with conveyed earth from 5 km in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 8.75 | cum | 314.3 | ₹2,750.13 |
| 5 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 6.15 | cum | 5,405.6 | ₹33,244.44 |
| 6 | Brick work in following Cement Mortar using best quality Country Brick of size 8 3/4" x 4 1/4" x 2 3/4" in C.M.1: 6 (one cement and six crushed stone M-sand ) with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge.
For Foundation and Basement | 6.1 | cum | 6,237.7 | ₹38,049.97 |
| 6.01 | For Ground Floor | 16 | cum | 6,330.57 | ₹1,01,289.12 |
| 7Renewal of Brick work in following Cement Mortar using best quality Country Brick of size 8 3/4" x 4 1/4" x 2 3/4" in C.M.1: 3 (one cement and three crushed stone M-sand ) with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 7.01 | For Foundation and Basement | 6.15 | cum | 6,301.9 | ₹38,756.69 |
| 8 | Brick partition walls of 10.80cm thickness using best quality County Brick of size 8-3/4” x 4-1/4” x 2-3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately)
For Foundation and Basement | 5.4 | sqm | 834.05 | ₹4,503.87 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_869961.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tenderdocument.pdf
Tender Documents • 1.51 MB
BOQ_869961.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .