Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹109.5 Cr
EMD Value
₹2.2 Cr
Closing Date
23 Nov 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
AS PER NIT AND TENDER DOCUMENT
AS PER NIT AND TENDER DOCUMENT
CONSTRUCTION OF ROAD ON NEW ALIGNMENT FROM NH-21 (KM 78.00) TO UCCHAIN AND CONSTRUCTION OF BYPASS AND IMPROVEMENT WORK ON UCHHAIN TO GAHNOLI MOD (NH-123) VIA PICHUNA MADARIYAPURA AND SEDPURA VILLAGES
2026_CEPWD_606167_1
Nit No 13/2026-27 ACE PWD ZONE BHARATPUR
Open Tender
Civil Works - Roads
Percentage
540 days
AS PER NIT AND TENDER DOCUMENT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
AS PER NIT AND TENDER DOCUMENT
₹2.2 Cr
Yes
ACE PWD ZONE BHARATPUR
19 Nov 2026
19 Nov 2026
25 Nov 2026
19 Nov 2026
23 Nov 2026
19 Nov 2026
19 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per MoRTH Specification Clause 201.
Lead upto 1000 m | - | - | - | - |
| 2 | Girth from 300 mm to 600 mm | 300 | Each | 116 | ₹34,800 |
| 3 | Girth from 600 mm to 900 mm | 500 | Each | 219 | ₹1,09,500 |
| 4 | Girth from 900 mm to 1800 mm | 200 | Each | 437 | ₹87,400 |
| 5 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.
By Mechanical Means
In area of non-thorny jungle | - | - | - | - |
| 6 | By Mechanical Means (In area of light jungle) | 74 | Hect | 10,374 | ₹7,67,676 |
| 7 | EARTH WORK | - | - | - | - |
| 8 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 76,782 | Cum | 25 | ₹19,19,550 |
| 9 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 5 Km as per MoRTH Specification Clause 305.3 | 6,30,666 | Cum | 90.2 | ₹5,68,86,073.2 |
| 10 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 54,479.02 | Cum | 33 | ₹17,97,807.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.36 MB
BOQ_1075179.xls
BOQ • 0.53 MB
Pontital.pdf
Tender Documents • 2.02 MB
Financial.pdf
Tender Documents • 8.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .