Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 150 VILLARASAMPATIBALL ROAD PO NASIYANUR ROAD ERODE 638107 TAMIL NADU | ERODE | ERODE | TAMIL NADU | 638107 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 3A 330 NEAR NAGARPUTRUKAN DELTA ROTO TECH PRIVATE LIMITED 3 152 1 NEAR NAGARPUTRUKAN SAIRAM NAGAR SANKARI MAIN ROAD NETHIMEDU SANKARI MAIN ROAD | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance 17 KOVAI ROAD KANGAYAM 638 701 | TIRUPPUR | TAMIL NADU | 638701 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.1 L
EMD Value
₹14,200
Closing Date
25 Nov 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Elec II Rewinding of stator rotor rebarring restacking of rotor core and servicing of 260KW 6 point 6 KV 3 phase HT induction motor Sl No 3851203 05.
2021_EB_213247_1
CE SE M II MTPS I CHP I OT136 2021 2022
Open Tender
Miscellaneous Works
Works
60 days
MTPS-I
As per Tender Specification
5 documents required · 5 mandatory
₹0
₹14,200
Yes
26 Nov 2021
11 Nov 2021
26 Nov 2021
11 Nov 2021
25 Nov 2021
11 Nov 2021
180 days
Amount
STATOR REWINDING (6.6KV)Charges towards dismantling the motor, threading out the rotor from the stator core pack, stripping out of old windings, cleaning the slots, conducting hot spot tests to find out the core damages, rewinding the stator using 180kgs. Of class ‘F’ enameled double fibre glass covered electrolytic grade rectangular copper conductors, winding, insulating the slot portions using semicatherm insulating materials, applying flexible insulation to the overhang portion, applying corona protective coating to slot portion and applying stress grading coating to the overhang portions, inserting the windings into the slots, banding the overhang portions in the surge ring, leading out the end connection, fixing RTDs, 12 Nos. preheating, varnishing, baking, applying finishing varnish including assembling, no load trial run at the rated voltage of 6.6KV and measuring all no load parameters. No load test results to be sent to us.
ROTOR RE-BARRING:Charges towards mounting the rotor in the lathe machining both side end ring, stripping out the bars in bar removing machine using special tools and machineries, machining the rotor bars & end rings made out of electrical conductivity grade copper using copper bars & copper end rings, inserting the rotor bars using special tools and machineries, positioning, locking, machining both side rotor bars for proper bedding of bars and end rings, brazing the bars and end rings using silver brazing rods, flux & oxy-acetylene gas and thermal protection materials, conducting the healthiness of the brazed joints before and after machining the excessive materials, cleaning dip varnishing the rotor with class ‘F’ varnish, baking, applying finishing varnish to the overhang portions.
ROTOR CORE RESTACKING: Charges towards machining the lock welding, shifting the rotor to hydraulic press, removing the core locks, lifting the core one by one with special fixtures, segregating the damaged rotor core from core pack, removing the old burnt core plate varnishes by chemical treatment, cleaning, removing the surface kinks, varnishing the stampings in re-varnishing cum conveyor oven to cure the core plate varnish, staggering the core with special tools and machineries, locking and repositioning the core pack to the rotor shaft, welding the locks in hydraulic press and finally conducting the flux loop test to ascertain the restacked core healthiness, cleaning and polishing the slots ready to feeding. Replacement of new bearings in DE & NDE sides (Necessary bearings 6324 C3 & NU 324 will be supplied by board at free of cost.)
Charges towards providing DE side housing bearing seating sleeve
Charges towards providing NDE side housing bearing seating sleeve
Charges towards providing 1 No. new star point copper clamp
Charges towards proving 3 Nos. new terminal gland
Charges towards 2 Nos. new BTD with adopters and bearing temperature gauge.
Charges towards providing 2 Nos. core lock plates
Charges towards dynamically balancing the rotor to grade G 2.5 at rated RPM.
Charges towards to and fro transport and transit insurance.
Less : Saleable copper scrap
Less : Saleable copper scrap
Ramakrishna Electrical Winding Works
Coral rewinding India Private Limited
SENTHIL ENGINEERING WORKS
Delta Roto Tech Private LimitedV
stage.html
html • 0.03 MB
finance_252609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .