Tender Value
₹77.2 L
EMD Value
₹1.5 L
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer
wdsc tonk
Construction of PCD WHS MPT PT ECD and SSB Block Deoli
2026_WDSC_572885_7
NIT 16-22 2026-27 Div Tonk
Open Tender
Civil Works
Percentage
180 days
tonk
refer bid
2 documents required · 2 mandatory
₹1,000
Yes
refer bids
₹1.5 L
4 Aug 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
3 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1As per bsr specification | |||||
| 1.01 | डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक (RD& PR BSR 2026 Item No-6B) | 4,523 | mtr | 1.71 | ₹7,734.33 |
| 1.02 | जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। (RD& PR BSR 2026) Item No- 192 | 27,045 | Sqm | 3.6 | ₹97,362 |
| 1.03 | Excavation including loading, unloading, disposal and dressing of excavated earth with in initial lead of 50m and lift up to1.5m including dressing of excavated area and dewatering wherever required complete in all respect | - | - | - | - |
| 1.04 | In Hard soil | 714.25 | Cum | 79 | ₹56,425.75 |
| 1.05 | Hard soil mixed with Kankar / boulders, Morrum (30%) (Item No. 1 c) | 185.45 | Cum | 98 | ₹18,174.1 |
| 1.06 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m | 4,200 | Cum | 82 | ₹3,44,400 |
| 1.07 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil FOR CORE WALL Foundation | 350 | Cum | 79 | ₹27,650 |
| 1.08 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil FOR CORE WALL | 1,150 | Cum | 79 | ₹90,850 |
| 1.09 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. FOR CORE WALL | 1,254 | Cum | 77 | ₹96,558 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1019253.xls
BOQ • 0.42 MB
BID.pdf
PDF • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .