Loading…
Loading…
Tender Value
₹77.2 L
EMD Value
₹1.5 L
Closing Date
13 Jul 2026, 6:00 pm5d left
Executive Engineer
wdsc tonk
Construction of PCD WHS MPT PT ECD and SSB Block Deoli
2026_WDSC_572885_7
NIT 16-22 2026-27 Div Tonk
Open Tender
Civil Works
180 days
tonk
refer bid
2 documents required · 2 mandatory
₹1,000
Yes
refer bids
₹1.5 L
3 Jul 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
3 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1As per bsr specification | |||||
| 1.01 | डागबेलिंग करना 5 सेमी. से 7.5 सेमी. गहराई तक (RD& PR BSR 2026 Item No-6B) | 4,523 | mtr | 1.71 | ₹7,734.33 |
| 1.02 | जंगल की सफाई, भारी झाडि़यों तथा 30 सेमी लपेट तक के पौधों को काटने समेत। (RD& PR BSR 2026) Item No- 192 | 27,045 | Sqm | 3.6 | ₹97,362 |
| 1.03 | Excavation including loading, unloading, disposal and dressing of excavated earth with in initial lead of 50m and lift up to1.5m including dressing of excavated area and dewatering wherever required complete in all respect | - | - | - | - |
| 1.04 | In Hard soil | 714.25 | Cum | 79 | ₹56,425.75 |
| 1.05 | Hard soil mixed with Kankar / boulders, Morrum (30%) (Item No. 1 c) | 185.45 | Cum | 98 | ₹18,174.1 |
| 1.06 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m | 4,200 | Cum | 82 | ₹3,44,400 |
| 1.07 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil FOR CORE WALL Foundation | 350 | Cum | 79 | ₹27,650 |
| 1.08 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard / dense soil FOR CORE WALL | 1,150 | Cum | 79 | ₹90,850 |
| 1.09 | Refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. FOR CORE WALL | 1,254 | Cum | 77 | ₹96,558 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1019253.xls
BOQ • 0.42 MB
BID.pdf
PDF • 2.61 MB
Download all tender documents and submit your bid