SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Repair and protective works on the approach road to the minor bridge located at Km 34 (Gumdi Ghat) on the Gonda-Utraula road
2026_CEDPW_1140814_3
1207/Com(B)/Gonda Circle/25-26 dt 12.3.26
Open Tender
Civil Works
60 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,600
Yes
₹4.4 L
Yes
GONDA
8 Jun 2026
23 Apr 2026
6 May 2026
23 Apr 2026
6 May 2026
23 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, upto 1km transporting to site, spreading, grading to required slope and compacting to meet requirement of 95% of proctor density. As per intregated SOR page 83 item 1.1.2 | - | CUM | - | - |
| 2 | Supply and Laying of Geo textile (sheet) made of 240 gsm woven multifilament polypropylene yarn for filter material underneath pitch in slopes complete. As per intregated SOR item m107 | - | Sqm | - | - |
| 3 | Providing and laying stone boulder pitching using 25-60 kg stone boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications (MORT&H Specification no 2504) | - | Sqm | - | - |
| 4 | Excavation of foundation in ordinary soil (Ioam clay or sand) including lift upto 1.50 meter and lead up to 30meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches.as per DSR 2.8.1 | - | CUM | - | - |
| 5 | Cement Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work.as per S.I. No. 280 | - | CUM | - | - |
| 6 | Furnishing & Placing reinforced/ cement concrete in super structure a per drawing and Technical Specification DSR5.3 | - | CUM | - | - |
| 7 | Mild steel or iorn work in plain work such as in reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shapes as necessary and bending for the proper coppletion of the work and including supply of steel and its wastage etc. and all labour and tools and plants required for proper completion of work Note: the steel shall be bent cold and bends hooks and authorised over lapping shall be measured. | - | qtl | - | - |
| 8 | Painting of steel work with Deluxe Multi Surface paint required shade (Two or more coat applied @ 0.90 Ltr/10Sqm over and including base coat of water proofing cement paint applied @ 0.80kg/10sqm.) As per DSR13.48.3 | - | CUM | - | - |
| 9 | Construction of K.C. Drain | - | RM | - | - |
| 10 | Construction of Chute Drain | - | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
BOQ_2130396.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid