Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC | L1 | Accepted-AOC | |
| 2 | L2₹28.8 L+₹1.4 L (5.19%)Rejected-AOC | L2 | Rejected-AOC | |
| 3 | L3₹34.2 L+₹6.8 L (24.7%)Rejected-AOC | L3 | Rejected-AOC | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
29 May 2017, 9:00 amClosed
Chief Engineer
Chief Engineer Office, Gonda
Capacity increasing of transformers of different capacities under Shravasti division
2017_MVVNL_60987_2
892/CE(D)/Gonda_12-05-17
Open Tender
Electrical Works
Item Wise
90 days
Shravasti
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,300
SE, Electricity Distribution Circle, Gonda
₹20,000
14 Jun 2017
15 May 2017
29 May 2017
15 May 2017
29 May 2017
15 May 2017
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .