Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹27.9 L+₹1.9 L (7.22%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Sanjay Kumar Contractor L2 | kapil kumar contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 566.82 | Cum | 83.49 ₹47,323.8 | 77.85 ₹44,126.94 Lowest |
| 2.00 | P.C.C. 1:3:6 (M10) with Cement & Stone girt 4 mm to 20 mm for toe wall base etc in with all cost of material, T&P and labour complete. | 57.17 | Cum | 3,988.84 ₹2,28,041.98 | 3,719.38 ₹2,12,636.95 Lowest |
| 3.00 | Providing and Laying RCC/CC A20 M-20 with crushed stone ballast and coarse sand with its proper mixing, shuttering, placing curing etc. including all cost of material T&P labour etc complete. | 164.67 | Cum | 5,257.93 ₹8,65,823.33 | 4,902.74 ₹8,07,334.2 Lowest |
| 4.00 | Laying M-15(1:2:4) including cost of all material labour T&P etc required for proper completion of work compaction by pavar. | 45 | Cum | 4,612.56 ₹2,07,565.2 | 4,314.98 ₹1,94,174.1 Lowest |
| 5.00 | Placing steel Reinforcement for Rcc Work including cost of material, cutting, bending, binding, welding etc Complete | 6.65 | MT | 63,003.22 ₹4,18,971.41 | 58,747.17 ₹3,90,668.68 Lowest |
| 6.00 | 1st class brick work in 1:4 cement coarse sand mortar inclduing all cost of material & labour etc all completion of work (per cum) | 145.19 | Cum | 4,647.93 ₹6,74,832.96 | 4,333.95 ₹6,29,246.2 Lowest |
| 7.00 | Pointing struck deep in (1:2 CM) cement, coarse sand mortar including all cost of material & labour T&P etc complete. | 630 | Sqm | 116.51 ₹73,401.3 | 108.64 ₹68,443.2 Lowest |
| 8.00 | Cement Plaster in (1:2 CM) cement, coarse sand including all cost of material, labour T&P etc complete. | 630 | Sqm | 155.05 ₹97,681.5 | 144.58 ₹91,085.4 Lowest |
| 9.00 | Painting with Acrylic Smooth exterior paint of approved brand and manufacture of required colour to give an even shade as per directed by engineer in charge. | 1,260 | Sqm | 139.3 ₹1,75,518 | 129.89 ₹1,63,661.4 Lowest |
| 10.00 | Supplying & Fixing of PVC Pipe 35 mm dia and 0.30 mtr long in weep hole with all cost of material, T&P and labour complete. | 33.6 | RM | 52.81 ₹1,774.42 | 49.24 ₹1,654.46 Lowest |
Tender Value
₹33.4 L
EMD Value
₹66,880
Closing Date
21 Sept 2026, 12:00 pmClosed
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Muzaffarnagar Khand Ganga Nahar Muzaffarnagar ke Antargat Upper Gangar Nahar ke Km 34.630 par isth Targhar ki surksha hetu chardiwari ka karya
2026_UPIDC_1185333_4
TN-04/EE/2026-27
Open Tender
Civil Works
Item Wise
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹66,880
9 Oct 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 566.82 | Cum | - | - |
| 2 | P.C.C. 1:3:6 (M10) with Cement & Stone girt 4 mm to 20 mm for toe wall base etc in with all cost of material, T&P and labour complete. | 57.17 | Cum | - | - |
| 3 | Providing and Laying RCC/CC A20 M-20 with crushed stone ballast and coarse sand with its proper mixing, shuttering, placing curing etc. including all cost of material T&P labour etc complete. | 164.67 | Cum | - | - |
| 4 | Laying M-15(1:2:4) including cost of all material labour T&P etc required for proper completion of work compaction by pavar. | 45 | Cum | - | - |
| 5 | Placing steel Reinforcement for Rcc Work including cost of material, cutting, bending, binding, welding etc Complete | 6.65 | MT | - | - |
| 6 | 1st class brick work in 1:4 cement coarse sand mortar inclduing all cost of material & labour etc all completion of work (per cum) | 145.19 | Cum | - | - |
| 7 | Pointing struck deep in (1:2 CM) cement, coarse sand mortar including all cost of material & labour T&P etc complete. | 630 | Sqm | - | - |
| 8 | Cement Plaster in (1:2 CM) cement, coarse sand including all cost of material, labour T&P etc complete. | 630 | Sqm | - | - |
| 9 | Painting with Acrylic Smooth exterior paint of approved brand and manufacture of required colour to give an even shade as per directed by engineer in charge. | 1,260 | Sqm | - | - |
| 10 | Supplying & Fixing of PVC Pipe 35 mm dia and 0.30 mtr long in weep hole with all cost of material, T&P and labour complete. | 33.6 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.92 MB
BOQ_2230542.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .