Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30,616Accepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹36,300+₹2,550 (7.56%)Rejected-AOC 40 E SUNDARAVELPURAM 7TH STREET TUTICORIN 628 002 | TUTICORIN | TAMIL NADU | 628002 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
Closing Date
3 Apr 2024, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ECHP-I- Complete overhauling of Conveyor-17 head end ILMS/ CBMS oil filled rectifier transformer at JT-V.
2024_EB_449592_1
CE/SE/MI/TTPS/86/2024-2025
Open Tender
Miscellaneous Works
Works
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
5 Jul 2024
16 Mar 2024
4 Apr 2024
16 Mar 2024
3 Apr 2024
16 Mar 2024
Charges for replacement of the damaged bottom support, damaged hylam sheet, copper flexible cable ,lug, cable support and internal wiring inside the IMS panel at Junction tower – 5.
Charges for cleaning panel, transformer, fixing of cable support, hylam sheet, copper flexible cable, cable support & Lug including wiring and checking the operation(including the cost of the material)
Charges for painting of Rectifier transformer tank in and out side with on coat of red oxide paint and two coats of enamel paint including cost of paint, consumables etc., complete.
S. MURUGAN CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .