Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.7 LAccepted-AOC SAKTHI MAHAL NO 63 PERUNDURAI ROAD ERODE 638 011 | ERODE | TAMIL NADU | 638011 | ₹95.7 L Quoted ₹97.6 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical NEW NO H 98 1 PERIYAR NAGAR ERODE 638 001 | ERODE | TAMIL NADU | 638001 | - | - | Rejected-Technical prequalification fail |
| Sl No | Description | Qty | Unit | R R THULASI BUILDERS INDIA P LTD L1 |
|---|---|---|---|---|
| 1.00 | Design, Engineering, Supply, Fabrication, Erection, Testing, commissioning and handing over of 1 no of 15 passenger stretcher lift as per the following specifications including taxes and duties.(Gearless lift with machine room) 1.Location: Nattan thottam 2.No of lift: 2 nos. (Gearless) 3.Type of lift: stretcher lift 4.Capacity of lift: 15 persons / conforming to 14665 (part 1) 2000 5.Speed: 1.5 M / Sec 6.Type of drive: V3F drive with enhanced ride comfort and near zero level functions 7.No of floors: S + 9 Floor 8.Total travel: 3.0 mts x 7 Landing = 30 mts 9.Leveling accuracy: high level accuracy with smooth and jerk free stopping 10. Construction of CAR: No. 4 hardened sheet high quality stainless steel car and hand rail granite flooring and Perspex false ceiling. 11. Position of machine: directly above the lift well. 12. No of landing service: One in the front side - 1 no. 13. No. of car entrance: one in the front side only 14. Car entrance door: power operated automatic V3F drive center opening sliding SS door 15. Landing entrance door: power operated V3F drive center opening sliding SS door with provision for emergency exit key at all landings. 16.Lift well :As per structural design conforming to IS 14665(part1) 2000 to be constructed by the Building contractor 17.Lift pit depth: conforming to 14665 (part 1)2000 18. Car inner size, Total weight of person and Overhead height : conforming to 14665 (part 1)2000 19. Car clear opening:conforming to 14665 (part 1)2000 20.Lift machine room size: as per ISI 14665 (part 1) 2000 to be constructed by the building contractor 21. Power supply: 400 / 440 v three phase 50 Hz AC supply for power and 230 V 50 Hz single phase power supply for light. 22.Control: micro computer (micro processor):based simplex collective control with / without attendant 23. Car fittings: CFL lighting with 1 no 300 mm sweep cabin fan. 24. Lift well: RCC construction with brick masonry to be constructed by the building contractor 25. Induction: UP / DOWN digital direction and floor position indicator for all landings in all floors and inside the car. 26.Emergency alarm bell: battery operated bell to be provided with automatic charging device 27.Emergency light: battery operated light to be provided with automatic charging device 28.Fire mans switch: to be provided at the GF 29. Minor builder works: to be provided by the lift contractor.(S&F of bulk head, 5A switch, light point, wiring 2 of 2.5 sqmm at every floor and machine room lighting, 4way/8way/12 way TPN DB) and other requirements. 30. Scaffoldings: to be provided by the lift contractor. 31. Sill angles and facia plates: SS to be provided by the lift contractor. 32. Steel for lift machinery: to be provided by the lift contractor. 33. Servicing and maintenance: free comprehensive servicing and maintenance for one year Guarantee period to be provided by the lift contractor. 34. Automatic rescue device: to facilitate the landing of the nearest floor at the time of power failure this shall consist of suitable battery system with charger inverter under voltage protection system etc. complete with all accessories and single phase preventor specifying to IS norms 35. Provision for intercom with phone: to be provided by the lift contractor. 36.Lift license: preparation of drawings payment of charges to CEIG and insurance policy for both lift & body if any and obtaining CEIG approval for the lift as per lift act should be done by the lift contractor 37. Floor position announcer: to be provided by the lift contractor.38.Special features a) Infra red door sensor with full height screen b) Full width half height rear panel mirror c)Tubular SS hand rail in car d) Stainless steel signal features e) Vandal proof SS button with SS cover f) SS door frames for landing doors g) V3F door operator h) Call register signal i) Stainless steel facia plates for car operating panel and landing fixtures i) Stainless steel facia plates for car operating panel and landing fixtures j) Steel ladder for lift machine room k) On / off switch for fan and light l) Over load warning indicator with audio announcer m)Voltage stabilizer for control circuits n)Braille button o) Precautionary measures etched in SS plate 39.Over speed governor phase failure and phase reversal relay alarm bell T guide brackets for car and counter weight rubber padding under the winding unit motor of adequate capacity signal reduction worm gear electromagnetic brake with compression springs car safety gears buffers electro mechanical locks emergency key side supporting angles motor over load protection devices final limit switch main suspension ropes counter weight lifting joist for mounting the machineries 40. Guarantee: guarantee at least for one year for the material and workman ship of equipments should be offered by the lift contractor. 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 42. Supply operation and maintenance manual and necessary tools for operation and a set of Spare parts required for one year 43. All the features as per differently abled person Act should be provided. 44. 2 hrs.fire retardent landing doors | 2 | Nos | 27,56,000 ₹55,12,000 Lowest |
| 2.00 | Design, Engineering, Supply, Fabrication, Erection, Testing, commissioning and handing over of 1 no of 10 passenger lift as per the following specifications including taxes and duties.(Gearless lift with machine room)1.Location:Nattan thottam2.No of lift: 1 no. (Gearless)3.Type of lift: Passengar lift 4.Capacity of lift: 10 persons / conforming to 14665 (part 1) 2000 5.Speed: 1.5M / Sec 6.Type of drive: V3F drive with enhanced ride comfort and near zero level functions 7.No of floors: S + 9 Floor 8.Total travel: 3.0 mts x 10 Landing = 30 mts 9.Leveling accuracy: high level accuracy with smooth and jerk free stopping 10. Construction of CAR: No. 4 hardened sheet high quality stainless steel car and hand rail granite flooring and Perspex false ceiling. 11. Position of machine: directly above the lift well 12. No of landing service: One in the front side - 1 no 13. No. of car entrance: one in the front side only 14. Car entrance door: power operated automatic V3F drive center opening sliding SS door 15. Landing entrance door: power operated V3F drive center opening sliding SS door with provision for emergency exit key at all landings. 16.Lift well :As per structural design conforming to IS 14665(part1) 2000 to be constructed by the Building contractor 17.Lift pit depth: conforming to 14665 (part 1)2000 18. Car inner size, Total weight of person and Overhead height : conforming to 14665 (part 1)2000 19. Car clear opening:conforming to 14665 (part 1)2000 20.Lift machine room size: as per ISI 14665 (part 1) 2000 to be constructed by the building contractor 21. Power supply: 400 / 440 v three phase 50 Hz AC supply for power and 230 V 50 Hz single phase power supply for light. 22.Control: micro computer (micro processor):based simplex collective control with / without attendant 23. Car fittings: CFL lighting with 1 no 300 mm sweep cabin fan.24. Lift well: RCC construction with brick masonry to be constructed by the building contractor 25. Induction: UP / DOWN digital direction and floor position indicator for all landings in all floors and inside the car. 26.Emergency alarm bell: battery operated bell to be provided with automatic charging device 27.Emergency light: battery operated light to be provided with automatic charging device 28.Fire mans switch: to be provided at the GF 29. Minor builder works: to be provided by the lift contractor.(S&F of bulk head, 5A switch, light point, wiring 2 of 2.5 sqmm at every floor and machine room lighting, 4way/8way/12 way TPN DB) and other requirements. 30. Scaffoldings: to be provided by the lift contractor. 31. Sill angles and facia plates: SS to be provided by the lift contractor. 32. Steel for lift machinery: to be provided by the lift contractor.33. Servicing and maintenance: free comprehensive servicing and maintenance for one year Guarantee period to be provided by the lift contractor. 34. Automatic rescue device: to facilitate the landing of the nearest floor at the time of power failure this shall consist of suitable battery system with charger inverter under voltage protection system etc. complete with all accessories and single phase preventor specifying to IS norms 35. Provision for intercom with phone: to be provided by the lift contractor. 36.Lift license: preparation of drawings payment of charges to CEIG and insurance policy for both lift & body if any and obtaining CEIG approval for the lift as per lift act should be done by the lift contractor 37. Floor position announcer: to be provided by the lift contractor. 38.Special features a) Infra red door sensor with full height screen b) Full width half height rear panel mirror c)Tubular SS hand rail in car d) Stainless steel signal features e) Vandal proof SS button with SS cover f) SS door frames for landing doors g) V3F door operator h) Call register signal i) Stainless steel facia plates for car operating panel and landing fixtures j) Steel ladder for lift machine room k) On / off switch for fan and light l) Over load warning indicator with audio announcer m)Voltage stabilizer for control circuits n)Braille button n)Braille button o) Precautionary measures etched in SS plate 39.Over speed governor phase failure and phase reversal relay alarm bell T guide brackets for car and counter weight rubber padding under the winding unit motor of adequate capacity signal reduction worm gear electromagnetic brake with compression springs car safety gears buffers electro mechanical locks emergency key side supporting angles motor over load protection devices final limit switch main suspension ropes counter weight lifting joist for mounting the machineries 40. Guarantee: guarantee at least for one year for the material and workman ship of equipments should be offered by the lift contractor. 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 42. Supply operation and maintenance manual and necessary tools for operation and a set of Spare parts required for one year 43. All the features as per differently abled person Act should be provided. 44. 2 hrs.fire retardent landing doors 44. 2 hrs.fire retardent landing doors | 1 | Nos | 26,31,000 ₹26,31,000 Lowest |
| 3.00 | Earthing as per the ISI specification with an earth electrode of 2.10 metre Class "B" GI pipe of dia not less than 40mm with copper earth plate of size 125mmx 50 mmx x 6mm with necessary funneling arrangements with necessary masonary work and with 38mm Rcc cover slab for the brick work masonary,ect complete in all respecs (SD-221) | 6 | Nos | 3,200 ₹19,200 Lowest |
| 4.00 | Supply and laying of 31/2 x 50 sq.mm pvc armoured Aluminium LT UG cable of approved brand having ISI mark on post or wall with M.S clamps etc., complete in all respects | 105 | Rm | 680 ₹71,400 Lowest |
| 5.00 | Supply and runof 25mmx6mmGI strip FlatDownCondutorwith necessaryclamps/supportsonwall / floor /groundforearth connection | 210 | Rm | 180 ₹37,800 Lowest |
| 6.00 | GST @ 18 % | 18 | Percentage | 14,88,852 ₹14,88,852 Lowest |
Tender Value
₹95.7 L
EMD Value
₹58,000
Closing Date
2 Sept 2025, 12:00 pmClosed
The Superintending Engineer
The Superintending Engineer, TNUHDB, East -1 Circle, T. Nagar, Chennai - 17
Providing Lift arragements for the Reconstruction of 252 tenements in Splus9 at Nattan Thottam scheme in Greater Chennai Corporation under HFA Vertical - III AHPof PMAY.
2025_TNUHB_597780_1
TNUHDB/76/D1/SE(East -1)/2025
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
Chennai
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹58,000
Yes
5 Dec 2025
27 Aug 2025
3 Sept 2025
27 Aug 2025
2 Sept 2025
27 Aug 2025
Amount
Design, Engineering, Supply, Fabrication, Erection, Testing, commissioning and handing over of 1 no of 15 passenger stretcher lift as per the following specifications including taxes and duties.(Gearless lift with machine room) 1.Location: Nattan thottam 2.No of lift: 2 nos. (Gearless) 3.Type of lift: stretcher lift 4.Capacity of lift: 15 persons / conforming to 14665 (part 1) 2000 5.Speed: 1.5 M / Sec 6.Type of drive: V3F drive with enhanced ride comfort and near zero level functions 7.No of floors: S + 9 Floor 8.Total travel: 3.0 mts x 7 Landing = 30 mts 9.Leveling accuracy: high level accuracy with smooth and jerk free stopping 10. Construction of CAR: No. 4 hardened sheet high quality stainless steel car and hand rail granite flooring and Perspex false ceiling. 11. Position of machine: directly above the lift well. 12. No of landing service: One in the front side - 1 no. 13. No. of car entrance: one in the front side only 14. Car entrance door: power operated automatic V3F drive center opening sliding SS door 15. Landing entrance door: power operated V3F drive center opening sliding SS door with provision for emergency exit key at all landings. 16.Lift well :As per structural design conforming to IS 14665(part1) 2000 to be constructed by the Building contractor 17.Lift pit depth: conforming to 14665 (part 1)2000 18. Car inner size, Total weight of person and Overhead height : conforming to 14665 (part 1)2000 19. Car clear opening:conforming to 14665 (part 1)2000 20.Lift machine room size: as per ISI 14665 (part 1) 2000 to be constructed by the building contractor 21. Power supply: 400 / 440 v three phase 50 Hz AC supply for power and 230 V 50 Hz single phase power supply for light. 22.Control: micro computer (micro processor):based simplex collective control with / without attendant 23. Car fittings: CFL lighting with 1 no 300 mm sweep cabin fan. 24. Lift well: RCC construction with brick masonry to be constructed by the building contractor 25. Induction: UP / DOWN digital direction and floor position indicator for all landings in all floors and inside the car. 26.Emergency alarm bell: battery operated bell to be provided with automatic charging device 27.Emergency light: battery operated light to be provided with automatic charging device 28.Fire mans switch: to be provided at the GF 29. Minor builder works: to be provided by the lift contractor.(S&F of bulk head, 5A switch, light point, wiring 2 of 2.5 sqmm at every floor and machine room lighting, 4way/8way/12 way TPN DB) and other requirements. 30. Scaffoldings: to be provided by the lift contractor. 31. Sill angles and facia plates: SS to be provided by the lift contractor. 32. Steel for lift machinery: to be provided by the lift contractor. 33. Servicing and maintenance: free comprehensive servicing and maintenance for one year Guarantee period to be provided by the lift contractor. 34. Automatic rescue device: to facilitate the landing of the nearest floor at the time of power failure this shall consist of suitable battery system with charger inverter under voltage protection system etc. complete with all accessories and single phase preventor specifying to IS norms 35. Provision for intercom with phone: to be provided by the lift contractor. 36.Lift license: preparation of drawings payment of charges to CEIG and insurance policy for both lift & body if any and obtaining CEIG approval for the lift as per lift act should be done by the lift contractor 37. Floor position announcer: to be provided by the lift contractor.38.Special features a) Infra red door sensor with full height screen b) Full width half height rear panel mirror c)Tubular SS hand rail in car d) Stainless steel signal features e) Vandal proof SS button with SS cover f) SS door frames for landing doors g) V3F door operator h) Call register signal i) Stainless steel facia plates for car operating panel and landing fixtures i) Stainless steel facia plates for car operating panel and landing fixtures j) Steel ladder for lift machine room k) On / off switch for fan and light l) Over load warning indicator with audio announcer m)Voltage stabilizer for control circuits n)Braille button o) Precautionary measures etched in SS plate 39.Over speed governor phase failure and phase reversal relay alarm bell T guide brackets for car and counter weight rubber padding under the winding unit motor of adequate capacity signal reduction worm gear electromagnetic brake with compression springs car safety gears buffers electro mechanical locks emergency key side supporting angles motor over load protection devices final limit switch main suspension ropes counter weight lifting joist for mounting the machineries 40. Guarantee: guarantee at least for one year for the material and workman ship of equipments should be offered by the lift contractor. 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 42. Supply operation and maintenance manual and necessary tools for operation and a set of Spare parts required for one year 43. All the features as per differently abled person Act should be provided. 44. 2 hrs.fire retardent landing doors
Design, Engineering, Supply, Fabrication, Erection, Testing, commissioning and handing over of 1 no of 10 passenger lift as per the following specifications including taxes and duties.(Gearless lift with machine room)1.Location:Nattan thottam2.No of lift: 1 no. (Gearless)3.Type of lift: Passengar lift 4.Capacity of lift: 10 persons / conforming to 14665 (part 1) 2000 5.Speed: 1.5M / Sec 6.Type of drive: V3F drive with enhanced ride comfort and near zero level functions 7.No of floors: S + 9 Floor 8.Total travel: 3.0 mts x 10 Landing = 30 mts 9.Leveling accuracy: high level accuracy with smooth and jerk free stopping 10. Construction of CAR: No. 4 hardened sheet high quality stainless steel car and hand rail granite flooring and Perspex false ceiling. 11. Position of machine: directly above the lift well 12. No of landing service: One in the front side - 1 no 13. No. of car entrance: one in the front side only 14. Car entrance door: power operated automatic V3F drive center opening sliding SS door 15. Landing entrance door: power operated V3F drive center opening sliding SS door with provision for emergency exit key at all landings. 16.Lift well :As per structural design conforming to IS 14665(part1) 2000 to be constructed by the Building contractor 17.Lift pit depth: conforming to 14665 (part 1)2000 18. Car inner size, Total weight of person and Overhead height : conforming to 14665 (part 1)2000 19. Car clear opening:conforming to 14665 (part 1)2000 20.Lift machine room size: as per ISI 14665 (part 1) 2000 to be constructed by the building contractor 21. Power supply: 400 / 440 v three phase 50 Hz AC supply for power and 230 V 50 Hz single phase power supply for light. 22.Control: micro computer (micro processor):based simplex collective control with / without attendant 23. Car fittings: CFL lighting with 1 no 300 mm sweep cabin fan.24. Lift well: RCC construction with brick masonry to be constructed by the building contractor 25. Induction: UP / DOWN digital direction and floor position indicator for all landings in all floors and inside the car. 26.Emergency alarm bell: battery operated bell to be provided with automatic charging device 27.Emergency light: battery operated light to be provided with automatic charging device 28.Fire mans switch: to be provided at the GF 29. Minor builder works: to be provided by the lift contractor.(S&F of bulk head, 5A switch, light point, wiring 2 of 2.5 sqmm at every floor and machine room lighting, 4way/8way/12 way TPN DB) and other requirements. 30. Scaffoldings: to be provided by the lift contractor. 31. Sill angles and facia plates: SS to be provided by the lift contractor. 32. Steel for lift machinery: to be provided by the lift contractor.33. Servicing and maintenance: free comprehensive servicing and maintenance for one year Guarantee period to be provided by the lift contractor. 34. Automatic rescue device: to facilitate the landing of the nearest floor at the time of power failure this shall consist of suitable battery system with charger inverter under voltage protection system etc. complete with all accessories and single phase preventor specifying to IS norms 35. Provision for intercom with phone: to be provided by the lift contractor. 36.Lift license: preparation of drawings payment of charges to CEIG and insurance policy for both lift & body if any and obtaining CEIG approval for the lift as per lift act should be done by the lift contractor 37. Floor position announcer: to be provided by the lift contractor. 38.Special features a) Infra red door sensor with full height screen b) Full width half height rear panel mirror c)Tubular SS hand rail in car d) Stainless steel signal features e) Vandal proof SS button with SS cover f) SS door frames for landing doors g) V3F door operator h) Call register signal i) Stainless steel facia plates for car operating panel and landing fixtures j) Steel ladder for lift machine room k) On / off switch for fan and light l) Over load warning indicator with audio announcer m)Voltage stabilizer for control circuits n)Braille button n)Braille button o) Precautionary measures etched in SS plate 39.Over speed governor phase failure and phase reversal relay alarm bell T guide brackets for car and counter weight rubber padding under the winding unit motor of adequate capacity signal reduction worm gear electromagnetic brake with compression springs car safety gears buffers electro mechanical locks emergency key side supporting angles motor over load protection devices final limit switch main suspension ropes counter weight lifting joist for mounting the machineries 40. Guarantee: guarantee at least for one year for the material and workman ship of equipments should be offered by the lift contractor. 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 41. Site testing in accordance with IS 14665 should be carried out at the time of handing over to the user department 42. Supply operation and maintenance manual and necessary tools for operation and a set of Spare parts required for one year 43. All the features as per differently abled person Act should be provided. 44. 2 hrs.fire retardent landing doors 44. 2 hrs.fire retardent landing doors
Earthing as per the ISI specification with an earth electrode of 2.10 metre Class "B" GI pipe of dia not less than 40mm with copper earth plate of size 125mmx 50 mmx x 6mm with necessary funneling arrangements with necessary masonary work and with 38mm Rcc cover slab for the brick work masonary,ect complete in all respecs (SD-221)
Supply and laying of 31/2 x 50 sq.mm pvc armoured Aluminium LT UG cable of approved brand having ISI mark on post or wall with M.S clamps etc., complete in all respects
Supply and runof 25mmx6mmGI strip FlatDownCondutorwith necessaryclamps/supportsonwall / floor /groundforearth connection
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].