Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.2 LAccepted-AOC | ₹43.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹50.0 L+₹6.8 L (15.7%)Rejected-AOC | ₹50.0 L+₹6.8 L (15.7%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Irregular |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Irregular |
| 5 | Rejected-Technical HOUSE NO 4 NAMGHAR PATH KHANAPARA GUWAHATI P O KHANAPARA P S DISPUR DIST KAMRUP M PIN 781022 | KAMRUP METRO | ASSAM | 781022 | - | - | Rejected-Technical Technically Irregular |
Tender Value
₹48.0 L
EMD Value
₹95,916
Closing Date
18 Apr 2023, 11:00 amClosed
CGM Generation
Third Floor Bijulee Bhawan Paltanbazar ghy 01
12 nos of various works at MSHEP
2023_APGCL_30152_1
MSHEP SOPD 29 44
Open Tender
Civil Works
Works
90 days
Myntriang West Karbi Anglong
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹95,916
Yes
9 Jul 2024
28 Mar 2023
18 Apr 2023
28 Mar 2023
18 Apr 2023
28 Mar 2023
Amount
(A) Removing of earth, sand deposit & decomposed material at upstream side of weir St-I, MSHEP, APGCL using sand dredging machine.
(B) Filling the big size road side holes adjacent to the power channel at Ch.2750.00m & Ch.2940.00m of MSHEP, APGCL
(C ) Clearance of deposited sand and earth material from road and drain & spreading of GSB material at few locations and clearance of deposited sand from hume pipe culvert at Ch.2100 m of St-II, MSHEP, APGCL
(E ) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 184 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(F ) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 369 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(G) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 580 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(H) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 1218 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(I) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 1582 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(J) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.-1870 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(K) RCC cum Boulder Masonry Box culvert Cross Drainage at Ch.- 2188 m from Forebay St-I towards Weir St-II of MSHEP, APGCL, West Karbi Anglong, Assam.
(L) Raising the height of forebay-I and Power Channel-I upto Spillway and backfilling of cavity/ erosion beneath and side of power channel, Stage-I, MSHEP.
KULDEEP BORA
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .