Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹47.6 L
EMD Value
₹95,140
Closing Date
14 Nov 2026, 6:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Col Pawan Kumar, CWE
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
SPL REPAIR TO CENTRAL AC PLANT AT PANCHAJANYA AUDITORIUM UNDER GE DRONACHAL
2026_MES_795999_1
84315/E8
Open Tender
Civil Works
Item Rate
180 days
Dronachal
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE Dronachal
₹95,140
Yes
27 Oct 2026
27 Oct 2026
16 Nov 2026
27 Oct 2026
14 Nov 2026
9 Nov 2026
27 Oct 2026 - 9 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Chiller Unit | |||||
| 1.01 | Overhauling of 100 TR Capacity refrigerant compressor of water cooled central AC Plant (Blue Star) comprising the following works:
(A) Isolating and Pumping down
(i) Pumping down refrigerant gas and isolating compressor from system
(ii) safe recovery and storage of refrigerant gas.
(B) Dismantling
(i) Disconnecting electrical connections, oil lines, and suction & discharge connections.
(ii) Dismantling compressor from chiller unit.
(C) Opening & Internal Inspection
(i) Opening compressor body.
(ii) Checking Crankshaft, connecting rods, pistons, cylinders, bearings
(iii) Checking rotor/ stator
(iv) Checking suction & discharge valves
(v) Checking mechanical seal/ shaft seal.
(D) Replacement of worn parts
(i) Main bearings
(ii) Thrust bearing
(iii) Gasket & O-rings
(iv) Oil seals
(v) Shaft seal kit
(vi) Valve plates
(E) Replacement of compressor oil with approved grade
Cleaning & Re-assembly
(i) Cleaning of all parts with approved solvent
(ii) Re-assembling compressor with new gasket
(iii) Proper torque tightening as per OEM
(F) Testing and commissioning
(i) Vacuuming of system
(ii) Charging of refrigerant (if required)
(iii) Trial run compressor | 2 | Each Job | - | - |
| 2 | Supply and filling of compressor lubricant after draining out old Lubricant complete all as specified and directed.
Note : (i) The oil to be supplied in sealed can.
(ii) Empty cans will be returned to contractor after
consumption of Oil. | 38 | Ltr | - | - |
| 3 | M&L de- scaling the shell and tube of condensor by circuilating de-scaling chemical applying for 2 to 3 hours and including opening the end cover of condensor and cleaning inner tubes manually with the help of nylon / wire brush until complete scale to be removed and flush out with fresh water, reassembling the end cover including replacement of gasket, bolts, nuts etc, as required and commissioning for the 100 TR complete all as specified and directed by Engr-in-charge | 2 | Each Job | - | - |
| 4 | M&L pumping down the gas of the central AC plant of 100 x 2 TR capacities and including the pressure testing the complete plant by dry nitrogen gas by separating high side and low side, rectifying and sealing the leakage by gas welding / brazing pressure, completely vaccuming the system and re-charging the system with R134a gas or as mentioned in the AC plant system, testing and commissioning complete all as specified and directed:-
Note :- Supply only nitrogen gas and refrigerant will be measured and paid separately. | 2 | Each Job | - | - |
| 5 | Supply only nitrogen gas for leak testing of central A/C plant system. | 3 | Cylinder | - | - |
| 6 | Supply, filling and testing of Refrigerant R-134A in the system to its rating capacity to the extent to full fill required temperature conditions and service leak testing and complete all as specified and as per directed.
Note:- Labour shall be included in item No 2. | 130 | Kg | - | - |
| 7 | Supply and fix of CI Butterfly Valve of 150mm dia, ISI Marked PN-1.6, having Nitrile/EPDM rubber lining, SS stem, CS/SS Disc, Lever operated, including all jointing material i.e. Nut, Bolt, washer, Packing material etc duly insualted with checking, Testing and commissioning complete all as specified and as per directed. | 23 | Each | - | - |
| 8 | M&L repair & overhauling of condensor water pump and chilled water pump of 10 to 15 HP and including taking out impeller, cleaning, descaling & greasing to bearings, replacement of unserviceable parts such as bearings DE & NDE, gland flange, etc, cleaning and varnishing the starter and rotar, winding, heating and drying replacement of burnt terminals of motor assembling in the pump with new packing materials nuts, bolts, washers checking alignment connecting all electrical / water connections, checking the vibrations & alignment, RPM, DOR, painting with one coat of synthetic enamel paint after preparing the surfaces, testing the pump set on full load for the 10/15 HP complete all as specified and directed
Note :-Lathe work & service charges deemed to be included in the quoted rate. (ii) Worn out spare shall be measured and paid as under :- | 6 | Each Job | - | - |
| 8.01 | Supply only Impeller CI | 4 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
84315TenderDocuments.pdf
Tender Documents • 0.97 MB
BOQ_892783.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .