| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-Finance | ₹22.2 L | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among Four. |
| 2 | L2₹22.7 LRejected-Finance | ₹22.7 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among Four. |
| 3 | L3₹22.8 LRejected-Finance | ₹22.8 L | L3 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among Four. |
| 4 | L4₹23.3 LRejected-Finance | ₹23.3 L | L4 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among Four. |
| Sl No | Description | Qty | Unit | M/S AZAM KHAN CONTRACTOR L4 | SUNSHINE ASSOCIATES L1 | KAZIM KHAN L2 | NANDINI ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | 882.04 | cum | 150 ₹1.3 L | 110 ₹97,023.96 | 100 ₹88,203.60 | 131 ₹1.2 L |
| 2.00 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 46.23 | cum | 6,500 ₹3.0 L | 5,800 ₹2.7 L | 6,500 ₹3.0 L | 6,000 ₹2.8 L |
| 3.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 44.39 | cum | 7,000 ₹3.1 L | 6,650 ₹3.0 L | 6,800 ₹3.0 L | 6,900 ₹3.1 L |
| 4.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 7.91 | cum | 8,500 ₹67,209.50 | 7,500 ₹59,302.50 | 6,900 ₹54,558.30 | 7,700 ₹60,883.90 |
| 5.00 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 41.26 | sqm | 500 ₹20,629.50 | 480 ₹19,804.32 | 450 ₹18,566.55 | 500 ₹20,629.50 |
| 6.00 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | 61.02 | sqm | 800 ₹48,816.80 | 770 ₹46,986.17 | 800 ₹48,816.80 | 822 ₹50,159.26 |
| 7.00 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | 163.86 | cum | 5,100 ₹8.4 L | 5,100 ₹8.4 L | 5,200 ₹8.5 L | 5,100 ₹8.4 L |
| 8.00 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | 133.23 | sqm | 100 ₹13,322.80 | 100 ₹13,322.80 | 90 ₹11,990.52 | 116 ₹15,454.45 |
| 9.00 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 6 | each | 700 ₹4,200 | 720 ₹4,320 | 680 ₹4,080 | 720 ₹4,320 |
| 10.00 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 8 | each | 140 ₹1,120 | 154 ₹1,232 | 130 ₹1,040 | 154 ₹1,232 |
Tender Value
₹23.5 L
EMD Value
₹2.3 L
Closing Date
25 Apr 2026, 12:00 pmClosed
RAJEEV KUMAR EXECUTIVE ENGINER
O/O EXECUTIVE ENGINEER MADHYA GANGA CANAL CONSTRUCTION DIVISION-9 SAMBHAL
CONSTRUCTION OF V.R.B AT KM 1.970 OF ESCAPE.
2026_UPIDC_1128901_3
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹854
Yes
₹2.3 L
SAMBHAL
5 May 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
25 Apr 2026
20 Apr 2026
21 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | - | cum | - | - |
| 2 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 3 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 4 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | - | cum | - | - |
| 5 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | - | sqm | - | - |
| 6 | Ordinary Centering and Shuttering or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete. | - | sqm | - | - |
| 7 | Providing first class M-100 brick work in 1:4 CM including cost of all materials, labour T & P, all lifts and leads etc. for proper completion of work. | - | cum | - | - |
| 8 | Providing struck deep pointing in 1:2 cement mortar including cost of all material, labour, T&P all lifts and leads etc complete. | - | sqm | - | - |
| 9 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | - | each | - | - |
| 10 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.82 MB
BOQ_2126863.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid