| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹5.7 L+₹3,449.72 (0.61%)Rejected-Finance | L2 | Rejected-Finance Highest Price Rejected |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
22 Sept 2023, 3:00 pmClosed
Executive Officer, Melpattampakkam
No.1, Town Panchayat Office, Melpattampakkam
15th Finance commisin UnTied grand -2022-2023 Construction of Storm Water Drain at Pillayar kovil street Ward no-08 melpattampakkam Town panchayat
2023_DTP_370769_1
95/2023/A1
Open Tender
Civil Works
Works
90 days
Melpattampakkam Town Panchayat
15th Finance commisin UnTied grand -2022-2023 Construction of Storm Water Drain at Pillayar kovil street Ward no-08 melpattampakkam Town panchayat
2 documents required · 2 mandatory
₹0
₹7,000
Town Panchayat Office, Melpattampakkam
13 Mar 2024
16 Sept 2023
22 Sept 2023
16 Sept 2023
22 Sept 2023
16 Sept 2023
16 Sept 2023 - 22 Sept 2023
20 Sept 2023
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B TNDSS NO. 23 &24 V, VI (S2) VI 9
Collection supply and filling of Stone Dust of approved quarry including cost and Conveyance of all materials to site and all labor charges for filling etc., Complete.
Plain Cement concrete of mix 1:4:8 (One cement four sand and eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including shoring, strutting forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO.28 V,VI S25
Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 A Without strutting
Supplying & Erecting of steel centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). TNDSS NO.86 K, 86 AWith strutting
Plain Cement concrete 1:2:4 Using 20mm ISS gauge hard broken granite stone jelly for Top layer concrete including watering wherever necessary and in layers not more than 15 cm in thick etc., including compacting and all labour charges for curing and all other incidental charges etc., complete complying with standard specification.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification .
Supplying and Fabrication of Steel and placing in position TMT steel Grills for RCC works as per design given including cost of steel and GI binding wire and labour charges for cutting bending tying etc etc,. Complete complying with standard specification in force and as directed by department officials.- TNDSS NO. SS 86 & 86A V,VI, VII (S6) 7,3
RCC 1:1½:3 (One cement one point five sand and three aggregates) mix using 20mm gauge hard granite broken stone jelly in all RCC works connected to the work excluding shuttering , Centering and cost of Reinforcement grills but including curing ,finishing etc complete with standard specification and as directed by Engineer incharge. TNDSS NO. 28 V,VI S25
Thirumalai Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_442164.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .