Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC P 27 1 RASHTRAGURU AVENUE DUM DUM KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹1.3 Cr | L1 | Accepted-AOC L1 hence work awarded to this agency |
| 2 | L2₹1.3 Cr+₹4.8 L (3.78%)Rejected-AOC | ₹1.3 Cr+₹4.8 L (3.78%) | L2 | Rejected-AOC L2 hence rejected as per NIT |
| 3 | L3₹1.3 Cr+₹4.9 L (3.83%)Rejected-Finance 95B LENIN SARANI LENIN SARANI 95B LENIN SARANI VILLAGE TOWN KOLKATA CITY KOLKATA KOLKOTA WEST BENGAL 700013 INDIA | KOLKATA | WEST BENGAL | 700013 | ₹1.3 Cr+₹4.9 L (3.83%) | L3 | Rejected-Finance L3 hence rejected as per NIT |
| 4 | L4₹1.3 Cr+₹7.5 L (5.92%)Rejected-Finance 1001 SHIVALIK ABAISE 100 FEET ROAD OPP ANANDNAGAR APARTMENT PRAHALADNAGAR AHMEDABAD AHMEDABAD GUJARAT 380015 | AHMADABAD | GUJARAT | 380015 | ₹1.3 Cr+₹7.5 L (5.92%) | L4 | Rejected-Finance L4 hence rejected as per NIT |
| 5 | L5₹1.4 Cr+₹14.8 L (11.7%)Rejected-Finance 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹1.4 Cr+₹14.8 L (11.7%) | L5 | Rejected-Finance L5 hence rejected as per NIT |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
15 Oct 2020, 5:00 pmClosed
AGM Engg Elect ER
Office of GM Engg ER. AAI operational office 1st Floor. Kolkata 700052
Annual Operation and and M Installations and CMC of ACs and Water Purifier n Coolers at Bagdogra Airport for 2 years
2020_AAI_58009_2
AAI/BD/EE/20-21/01
Open Tender
Electrical Works
Works
730 days
Bagdogra
As per NIT
2 documents required · 2 mandatory
₹1,180
Yes
AAI Bagdogra
₹3.1 L
Yes
2 Dec 2020
5 Oct 2020
21 Oct 2020
5 Oct 2020
15 Oct 2020
5 Oct 2020
5 Oct 2020 - 8 Oct 2020
Amount
SH -I : OPERATION & MAINTENANCE OF E & M INSTALLATIONS Operation & Maintenance of Electrical & Mechanical installations including Fire Alarm and Fire Fighting System of Operational and Non-Operational areas including periodical maintenance, repairs, attending to complaints /fault /breakdowns and taking rectification action, ensuring serviceability / satisfactory working condition of the entire system, maintenance of records/documentation etc. on all days including Sundays and holidays on round the clock basis.as per the detailed specifications, terms and conditions covered under this contract etc. complete as required.
SH -II : FILTRATION OF TRANSFORMER OIL AND OTHER MAINTENANCE WORKS Complete items of CPWD schedule of rates (electrical) internal & External- 2018 (Note: 1 Please refer particular specification clause no. 14 for Guidance of quoting rate for this item, 2 As per DSR 2018 total amount of work to be executed amounting to ₹ 2,00,000/- in 24 months )
Filtration of transformer oil in 1.25 MVA, 11KV / 415 V transformer including testing of transformer oil (acidity, moisture etc.) before and after filtration, confirming to latest indian standard at site till the reach of satisfactory di-electric strength of 50KV or above and submitting the report, replacement of silica gel of transformer etc as complete as required. a) First Year
b) Second Year
Top up the Transformers ISI with marked Transformer oil during filtration as per site requirement etc complete as required.
Repairing including rewinding and replacement of bearings of ceiling fan/wall fan/ exhaust fan of all make/model/type including transporting from the AAI store (as may be required) and returning back after thorough service etc as complete as required. (Dismantled copper wire need not return to AAI)
Repairing including rewinding and replacement of bearings of AirCirculators/ Pedestal fan of all make/model/type including transporting from the AAI store (as may be required) and returning back after thorough service etc as complete as required. (Dismantled copper wire need not return to AAI)
Repairing including rewinding and replacement of bearings of three phase monoblock pump set upto 5HP rating of all make/model/type including transporting from the AAI store (as may be required) and returning back after thorough etc as complete as required. (Dismantled copper wire need not return to AAI)
Repairing including rewinding and replacement of bearings of three phase submersible pump set upto 5HP of all make/model/type including transporting from the AAI store (as may be required) and returning back after thorough service etc. as complete as required. (Dismantled copper wire need not return to AAI)
Lifting and lowering of submersible pump set of various capacities alongwith GI pipes from a depth upto 200m due to defect in existing pump set on urgent basis within a short notice including connection of cable, jointing of cable etc with successful testing & commissioning etc as complete as required.
Providing synthetic enamel paint of approved brand and manufacturer by spray painting method after thorough cleaning of existing LT panels/feeder pillars in installed condition including minor repair and providing red oxide primer as per site requirement and upto the satisfaction of EIC etc as complete as required.
Providing synthetic enamel paint of approved brand and manufacturer by spray painting method after thorough cleaning of existing street poles (upto 11 m) installed including minor repair and providing red oxide primer as per site requirement and upto the satisfaction of EIC etc as complete as required.
SH-III : CMC OF ACs AND WATER PURIFIER/ COOLERS Comprehensive maintenance of single/three phase, High Wall/Tower/Ductable Type Split AC of following capacity of all makes and models/types with voltage stabilizers (if installed) at different locations including providing two numbers manpowers (one technician & one helper) in two shifts for all days with all necessary consumables and maintenance spares etc. as complete as required as per special conditions. i) First Year a) a) 1.5 TR, Single Phase High Wall Split AC
b) 2 TR, Single Phase High Wall Split AC
c) 2 TR, Single Phase Floor Mounted (Tower Type) Split AC
d)1.5 TR, Three Phase High Wall Split AC
e) 2 TR, Three Phase High Wall Split AC
f) 3 TR, Three Phase Split AC (Tower Type)
g) 3 TR, Three Phase Ductable AC
h) 4 TR, Three Phase Floor Mounted Split AC (Tower Type)
ii) Second Year a) 1.5 TR, Single Phase High Wall Split AC
b) 2 TR, Single Phase High Wall Split AC
c) 2 TR, Single Phase Floor Mounted (Tower Type) Split AC
d)1.5 TR, Three Phase High Wall Split AC
e) 2 TR, Three Phase High Wall Split AC
f) 3 TR, Three Phase Split AC (Tower Type)
g) 3 TR, Three Phase Ductable AC
h) 4 TR, Three Phase Floor Mounted Split AC (Tower Type)
Dismantling and reinstallation of split Airconditioners (Both indoor and outdoor unit as required) of different make and capacity installed at different locations of the airport including gas charging, making foundation/fixing iron angle etc complete as required. a) High Wall Split type AC Upto 2 TR
b) Floor Mounter Split Type Tower AC upto 4 TR
Extra for Supply and Laying of suitable size Cu piping along with thermal insulation & protective tape and FRLS PVC insulated multi core Cu conductor cable for connection between indoor and outdoor unit etc. complete as required for following type of ACs. a) High Wall Split type AC Upto 2 TR
b) Floor Mounter Split Type Tower AC upto 4 TR
Comprehensive maintenance of standalone Water Purifiers installed at different locations including providing all necessary consumables and spares etc. as complete as required as per special conditions. (Maintenance should be done through OEM's Authorized dealer in the name of AAI and original maintenance contract receipt should be submitted to AAI) i) First Year a) Make: Eureka Forbes, Model: Hi-Flo (AG-200)
ii) Second Year a) Make: Eureka Forbes, Model: Hi-Flo (AG-200)
Comprehensive maintenance of Aquaguard Cooler cum Purifier installed at different locations including providing all necessary consumables and spares etc. as complete as required as per special conditions. (Maintenance should be done through OEM/Authorized dealer in the name of AAI and original maintenance contract receipt should be submitted to AAI) i) First Year a) Make: Eureka Forbes, Model: AGCCP (PG-600)
ii) Second Year a) Make: Eureka Forbes, Model: AGCCP (PG-600)
Comprehensive maintenance of Industrial type Water Puirifier Cum Cooler (60/80 ltrs.) installed at different locations including providing all necessary consumables and spares etc. as complete as required as per special conditions. (Maintenance should be done through OEM/Authorized dealer in the name of AAI and original maintenance contract receipt should be submitted to AAI) i) First Year a) Make: Eureka Forbes, Model: 80PSS
ii) Second Year a) Make: Eureka Forbes, Model: 80PSS
Comprehensive maintenance of water coolers of all makes of different capacity installed at different locations including providing all necessary consumables and spares etc. as complete as required as per special conditions. i) First Year a) 60/120 ltrs.
b) 150/150 ltrs.
ii) Second Year a) 60/120 ltrs.
b) 150/150 ltrs.
SH-IV : FIRE ALARM & FIRE FIGHTING Service visit through OEM/Specialised Agency for carrying out servicing/maintenance of Complete FAD System with all detectors/Fire alrarm panel(installed in terminal building / power house/ admin building) and complete checking of fire fighting system in case of breakdown/ emergency/ as and when required and submission of service / maintenance report of OEM or Specialized Agency complete in all respect. a) First year
b) Second year
ABHISHEK ASSOCIATES
A R Rural Electricals
CENTRE TAP ENGINEERING
Voltas Limited
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .