Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Dec 2021, 4:00 pmClosed
Executive Engineer REW Budgam
Rural Engineering Complex Budgam
c/o WHT near l/o basher ah kutay at Shuth kargoam halqa palpora
2021_RDPR_151859_4
NIT_88_REW BUDGAM OF 2021-22
Open Tender
Civil Works
Item Rate
60 days
Kargam Parnewa
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Rural Development and Panchayati Raj
Exempted
15 Dec 2021
6 Dec 2021
15 Dec 2021
6 Dec 2021
14 Dec 2021
6 Dec 2021
Amount
Earth work in excavation by manual means in trenches for foundation, drains ,pipes , cables etc ( not exceeding 1.5 m in width ) and for shafts ,wells ,cesspits and the like not exceeding 10 sqm on plan ,depth up to 1.50 mtr from cutting edge, disposed earth to be leveled and neatly dressed in all kinds of soil.1 meter from cutting edge.
Providing and laying charges for laying of dry Stone Solling duly hand packed, rammed,watering . All job complete
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Carriage of cement for 05 Kms average lead from Source to site of work
Carriage of Sand for 20 Kms average lead from Source to site of work
Carriage of Stone aggregates for 10 Kms average lead from Source to site of work
Cement plaster in fine sand 12mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand)
Carriage of stone boulders for 05 Kms average lead from Source to site of work
Provisions for CIB ,photographs ,head load and other unforseen items
FAYAZ AHMAD KUDATY
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .