Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.9 CrAccepted-AOC NAMAKKAL | L1 | Accepted-AOC AOC | |
| 2 | L2₹33.7 Cr+₹54.7 L (1.65%)Rejected-Finance NO 07 CENTRAL STREET KILPAUK GARDEN COLONY CHENNAI 600 010 | CHENNAI | CHENNAI | TAMIL NADU | 600010 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹34.2 Cr+₹97.8 L (2.95%)Rejected-Finance 4 324M MAIN ROAD VANNICONENDAL TIRUNELVELI DISTRICT 627951 | TIRUNELVELI | TAMIL NADU | 627951 | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹27 Cr
EMD Value
₹15.9 L
Closing Date
16 Apr 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer
Fishing Harbour Project Circle Fisheries and Fishermen Welfare Department Chennai35
Construction of Bait Arch at Erayumanthurai Village in Kanniyakumari District.
2024_AHDF_449301_1
19 /DB/F.114 N/2024
Open Tender
Civil Works
Lump-sum
365 days
Erayumanthurai
As Mentioned in PQ Document
4 documents required · 4 mandatory
₹0
₹15.9 L
13 Aug 2024
15 Mar 2024
20 Jun 2024
15 Mar 2024
16 Apr 2024
15 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Formation of Bedding Layer/Filter Layer for rubble mound Groyne with quarry run hard blue granite stone of weight 1kg to 30kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1:1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 11,281 | MT | 1,193.85 | ₹1,34,67,821.85 |
| 2 | Formation of Core Layer for rubble mound Groyne with quarry run hard blue granite stone of weight upto 100kg- 300kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1:1.5 on both sides with necessary equipment and devices as per the drawings and specification etc complete as directed by the Departmental Officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 32,538 | MT | 1,193.85 | ₹3,88,45,491.3 |
| 3 | Formation of Toe Berm Layer / Under Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 1000 Kg to 1500 Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 :1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 41,027 | MT | 1,262.2 | ₹5,17,84,279.4 |
| 4 | Formation of Armour Layer for rubble mound Groyne with hard blue granite stone of weight ranging from 2000 Kg to 3000Kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 1.5 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the Departmental Officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge. | 25,695 | MT | 1,262.3 | ₹3,24,34,798.5 |
| 5 | Providing concrete Tetra pod weighing 8T in plain cement concrete M35 grade including, casting, finishing and curing, transporting placing in position as per approved design and slope over a under layer of rubble mounded Groyne complete as directed by the departmental officers and as per the drawings and specifications and as per the condition laids in special conditions. | 7,990 | Cum | 14,314 | ₹11,43,68,860 |
| 6 | Deepening and dredging the basin area to maintain (-) 3.00m (maximum) drought from chart datum including dredging along sides of berths to the level as indicated in the drawing in all types of soil as existing at site including loose oir compacted sand, silt mixed with / without clay or soft clay or any other soft materials including boulders spilled cargoes and any broken concrete pieces/debris and foreign materials like fishing nets, broken pieces or mechanised boats etc but including hard rock by suitable methods acceptable to the Departmental Officers using Grab Dredger or cuter suction Dredger or any offer suitable Machinery and sufficient number of barges for dumping transporting and disposal without disturbing / damaging the existing wharf / jetty structures, break water, groyne including removal and conveying the dredged materials and dumping in the complex area including spreading etc. complete as shown in the drawings and as directed by the Departmental Officers with all lead and lift Mobilisation of Machineries cost of surveying at the time of part payment and at completion stage including all tools, plants, equipment and labour, consumables fuel etc., complete as directed by the departmental officers. | 513 | Cum | 210 | ₹1,07,730 |
| 7 | Providing and forming Rubble matters with 40mm to 80mm metal to the required with thickness and levelles with along the alignment of the quay for preparing the bed for blocks. | 180 | Cum | 1,539.2 | ₹2,77,056 |
| 8 | Providing precast blocks of different size Cement Concrete mix M35 with 10% plumps by volume of concrete and laying them in position for the block work of quay as directed using suitable cranes including moulding charges compacting finishing and curing with the help of drivers wherever required and other accessiores etc complete and as directed by the departmetnal officers. | 755 | Cum | 13,487.9 | ₹1,01,83,364.5 |
| 9 | Supplying factory fusion bonded epoxy coated with minimum 175 microns thickness H.Y.S.D. steel ( Cold, Twisted ) reinforcement for R.C.C work including cost and conveyance from point of purchase to reputed company and to site after coated straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design etc., complete as per specifications. | 147 | Qtl | 8,887.35 | ₹13,06,440.45 |
| 10 | Formation of backfilling foundation layer of rubble mountd breakwater, with quarry stone (rough regular) weighing to 50 Kg including quarrying, loading, grading, conveying with contractors transporting by tippers / lorries including weighing in the electronic bridge for the purpose of th measurement and dumping into the sea with required width and side slop 1:2 on both side with necessary equipment and devices as [er drawings and specifications etc., complete as per the directed by the departmental engineers. The payment shall be made weigh basis (i.e) ladden weight minus. unladden weight) The contractor has to make his own arrangements for weighing the materials in the presence of Department Engineer / Authorized Engineer. | 1,400 | MT | 1,193.85 | ₹16,71,390 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_535036.xls
BOQ • 0.29 MB
142073144.pdf
Tender Documents • 0.39 MB
142073147.html
Tender Documents • 0.03 MB
Cover1.pdf
Tender Documents • 0.84 MB
Cover2.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .