| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.1 LAccepted-AOC 105 B TOP FLOOR MOTIA CITY ZIRAKPUR 140603 PB | S A S NAGAR | PUNJAB | 140603 | ₹16.1 L | 1 | Accepted-AOC DUE TO L-1 AGENCY |
| 2 | 2₹16.6 LRejected-Finance 11 NO 870 SECTOR 13 A CHANDIGARH | ₹16.6 L | 2 | Rejected-Finance RATE ON HIGHER SIDE |
| 3 | 3₹18.7 LRejected-Finance CHANDIGARH | ₹18.7 L | 3 | Rejected-Finance RATE ON HIGHER SIDE |
| 4 | 4₹18.8 LRejected-Finance 1662 SECTOR 15 PANCHKULA | ₹18.8 L | 4 | Rejected-Finance RATE ON HIGHER SIDE |
| 5 | 5₹20.8 LRejected-Finance 1194 PUSHPAC COMPLEX SECTOR 49B CHANDIGARH | ₹20.8 L | 5 | Rejected-Finance RATE ON HIGHER SIDE |
Tender Value
₹28.1 L
EMD Value
₹56,155
Closing Date
13 Feb 2026, 11:00 amClosed
XEN CP3
XEN CP3 SEC 16 CHD
ROOF TREATMENT AT GYNAE WARD IN CIVIL HOSPITAL SECTOR 22 CHANDIGARH.
2026_CHD_90522_1
CP3/2026/2578070
Open Tender
Civil Works
90 days
SECTOR 22 CHANDIGARH.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹56,155
21 May 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Regrading terracing of mud phaska covered with tiles or brick, in cement mortar by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud phaska to proper slope, relaying mud plaster gobri leaping and tiles or bricks, grouted in cement mortar 1:3 (1 cement : 3 fine sand), including replacing unserviceable tiles or bricks with new ones and disposal of unserviceable material to the dumping ground (the cost of the new tiles or brick excluded), all complete as per direction of Engineer-in-Charge
Scrapping / dismantling of exisitng Tarfelt using suitable means, including the charges of disposal of the malba to the designated malba dumping ground in city, complete in all repsects and to the entire satisfaction of the Engineer in Charge.
Removing the earth filling under tiles and cleaning and scraping old bitumen of the roof surface with wire brushes and refilling the earth after cleaning etc. complete in all respect engineer in charge.
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10 mm and down gauge), including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design In 75x75 mm deep chase
P/F 110mm internal dia PVC pipe as rain water pipe on walls of 6 kg. pressure with Bend, Elbow and Clamps complete in all respect to the entire satisfaction of Engineer--in-Charge
Dismantling old plaster or skirting raking out joints and cleaning thesurface for plaster including disposal of rubbish to the dumping groundwithin 50 metres lead
15 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) (DSR 13.2.1)
.Providing and laying in situ five course water proofing treatment with APP (Atactic Polypropylene) modified Polymeric memberane over roof consisting of first coat of bitumen primer @ 0.40 litre per sqm, 2nd & 4th courses of bonding material @ 1.20 kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS : 702, 3rd layer of roofing membrane APP modified Polymeric membrane 2.0 mm thick of 3.00 Kg/ sqm weight consisting of five layers prefabricated with centre core as 100 micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 5th, the top most layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately).
Supply of 1st quality brick tiles 9"x 4 1/2"x 1 1/2" complete in all respect and to the entire satisfaction of Engineer-in-Charge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.20 MB
BOQ_110706.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid