| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Finance | -1.50% | ₹17.7 L | L1 | Admitted-Finance |
| 2 | L2₹17.8 L+₹8,980.26 (0.51%)Admitted-Finance | -1.00% | ₹17.8 L+₹8,980.26 (0.51%) | L2 | Admitted-Finance |
Tender Value
₹18 L
EMD Value
₹1.8 L
Closing Date
16 Sept 2026, 12:00 pmClosed
EE PD PWD Bulandshahar
EE PD PWD Bulandshahar
Construction work of extra boundary wall of Government Shelter Home Boys located in District Bulandshahr
2026_CEMRT_1183547_1
5480/1A Dt. 14.08.2026
Open Tender
Civil Works - Buildings
Percentage
90 days
Bulandshahar
Construction work of extra boundary wall of Government Shelter Home Boys located in District Bulandshahr
3 documents required · 3 mandatory
₹944
₹1.8 L
Yes
EE PD PWD Bulandshahar
21 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
16 Sept 2026
9 Sept 2026
9 Sept 2026 - 10 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead including all type of taxes,octroi,toll taxes,labour cess ,cost of all material, labour T&P etc required for proper completion of work as per direction of Enginner in charge .But Excluding GST | 36 | Cum | 1,550 | ₹55,800 |
| 2 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M.& lead upto 30 M. & including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth & removal & disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M.from the foundation trenches.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST | 110 | Cum | 100 | ₹11,000 |
| 3 | Cement concrete with 4cm (1/2") gauge approved stone ballast, approved coarse sand, cement in the proportion 6:3:1 including supply of all materials,labour,T&P etc. required for proper completion of the work.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material, labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GSTAs per DSR 4.1.6 | 11 | Cum | 5,400 | ₹59,400 |
| 4 | Brick work in 1:4 cement coarse sand (of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials,labour,T&P etc. required for proper completion of the work. Including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.including all type of taxes,octroi,toll taxes,labour cess ,cost of all material, labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. | 52 | Cum | 5,350 | ₹2,78,200 |
| 5 | Brick work in 1:4 cement & coarse sand mortar in Super Structure including supply of all materials labour,T&P etc.including all type of taxes,octroi,toll taxes,labour cess , cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. | 54 | Cum | 7,050 | ₹3,80,700 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters,buttresses,plinth & string courses,fillets,columns, pillars,piers, abutments, posts & struts etc.above plinth level up to floor five level, excluding cost of centering,shuttering,finishing & reinforcement. including all type of taxes,octroi,toll taxes, labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. | 42 | Cum | 8,150 | ₹3,42,300 |
| 7 | M.S.(tor steel or plain) in Plain work such as R.C.C.or R.B. work including bending for proper shape & including supply of steel & its wastage,bend,hooks,authorised overlapping shall be measured and including cost of binding wire. including all type of taxes,octroi,toll taxes, labour cess,cost of all material,labour,T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST | 57 | Qtl | 7,080 | ₹4,03,560 |
| 8 | 12 mm cement plaster on brick wall of mix :1:6 (1 cement: 6 Coarse sand).Including all type of taxes,octroi, toll taxes, labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.including all type of taxes,octroi,toll taxes,labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. | 549 | Sqm | 259 | ₹1,42,191 |
| 9 | Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over & including priming coat of exterior primer applied @ 2.20 kg/10 sqm.including all type of taxes,octroi,toll taxes, labour cess,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST. | 549 | Sqm | 145 | ₹79,605 |
| 10 | Steel work welded in built up sections/ framed work, including cutting,hoisting,fixing in position & applying a priming coat of approved steel primer using structural steel etc.as required.In stringers,treads,landings etc.of stair cases,including use of chequered plate wherever required, all complete.including all type of taxes,octroi,toll taxes, labour cess ,cost of all material,labour T&P etc required for proper completion of work as per Direction of E/I.But Excluding GST.As Per DSR 10.15.1 | 136 | Kg | 145 | ₹19,720 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_2225984.xls
BOQ • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .