Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 CrAccepted-AOC 4 87 1ST STREET VADAKKUPPATTI PO EDAPPADI SALEM 637102 | SALEM | SALEM | TAMIL NADU | 637102 | L1 | Accepted-AOC After negotiation Plus Four point Nine Nine percentage Excess over than Departmental rate as per SoR 2022 2023 | |
| 2 | L2₹53.9 Cr+₹5.6 Cr (11.6%)Rejected-Finance DOOR NO 2 9 AN TOWERS DR SATHYAMOORTHY HOSPITAL OPP ROAD 2 5 PERUNDURAI ROAD ERODE TAMILNADU 638011 | ERODE | ERODE | TAMILNADU | 638011 | L2 | Rejected-Finance Plus Seventeen point One Six percentage Excess over than Departmental rate as per SoR 2022 2023 |
Tender Value
₹46 Cr
EMD Value
₹34.5 L
Closing Date
15 Jun 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer TWAD Board Coimbatore
Office of the Chief Engineer TWAD Board No 30 Siruvani Nagar Bharathipark Road Coimbatore 641 043
Retrofitting of existing CWSS to 136 Fluoride affected habitations and 604 wayside habitations in Kadayampatty and 3 other unions of Salem district
2023_TWAD_321465_1
IFB13RetroKadayampatty2ndCall
Open Tender
Composite Works
Lump-sum
365 days
Salem District
As per Clause 7.1 and 7.2
4 documents required · 4 mandatory
₹0
₹34.5 L
Yes
Office of the Chief Engineer TWAD Board Coimbatore
30 Aug 2023
1 Jun 2023
16 Jun 2023
1 Jun 2023
15 Jun 2023
1 Jun 2023
1 Jun 2023 - 7 Jun 2023
7 Jun 2023
Replacement of the existing 813mm MS Pipe Clear Water Pumping Main from Thottilpatty to SIDCO Fire Service & From Jeeva Nagar to Raman Nagar Pump house
Replacement of AC Pipes with DI Pipes from various reaches
Branch Feeder main from various sumps in Kolathur Omalur and Kadayampatty Unions
Clear Water Pumping Main from Thindamangalam MSR to Thimmirikottai Pirivu - 350mm dia DI K7 (LS 0m to 2100m)
Constructions of Clafiflocculator :-
Clarified Water Channel from Clariflocullator
Construction of Clariflocculator
Construction of Flash Mixer
Pipe Connections for Flash Mixer
Pipe Connections in Clariflocculator
Electrical and Mechanical Items for Flash Mixer and Clarifloculator
Operation and Maintenance :-
Operation and Maintenance of Kadayampatty CWSS for 24 months on MLD Basis
Repairs and Renewals For the period of First 12 months (i.e., 1st year) from the date of Trial run Completion of the entire CWSS
Repairs and Renewals For the period of Second 12 months (i.e., 2nd year) from the date of Completion of First Year maintenance of the entire CWSS
ANNAI INFRA DEVELOPERS LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_381557.xls
BOQ Document • 1.32 MB
122088799.pdf
Tender Document • 5.40 MB
TB_RetroKadayampatty2ndcall.pdf
Tender Document • 2.01 MB
IFB13Kadayampatty2ndCallweb.pdf
Tender Document • 5.39 MB
FlowDiagramRetroKadayam.pdf
Tender Document • 0.12 MB
122088801.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .