Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.7 LAdmitted-Finance | -1.19% | ₹8.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹6,253.98 (0.72%)Admitted-Finance | -0.48% | ₹8.8 L+₹6,253.98 (0.72%) | L2 | Admitted-Finance |
| 3 | L3₹8.8 L+₹6,518.23 (0.75%)Admitted-Finance | -0.45% | ₹8.8 L+₹6,518.23 (0.75%) | L3 | Admitted-Finance |
Tender Value
₹10.4 L
EMD Value
₹88,084
Closing Date
24 Jul 2026, 3:00 pmClosed
Chief Enigneer
Nagar Nigam Firozabad
Construction of a drain and a CC road from Chandrawar Gate Road via Saurabh Halwai to Harishankar, as well as the unpaved lane known as Premchandra Wali Gali in Ward No. 06 Shyam Nagar.
2026_DOLBU_1168774_3
08_PWD_Rajvitt_2026-27
Open Tender
Civil Works - Roads
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,039
Municipal Corporation
₹88,084
11 Sept 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
24 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete pavement by mechanical means using pneumatic tools, breakingg to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately. (PWD SOR 2025-26, Chepter-10, Item No.6 ) | 49.6 | Cum | 690 | ₹34,224 |
| 2 | Disposal of malba form site with cartage up to 8 km distance etc……… all complete. | 44.64 | Cum | 230 | ₹10,267.2 |
| 3 | Earth Filling work with 10 kM cartage ……….. Including all complete. (as per Analysis of Rate) | 36 | Cum | 374 | ₹13,464 |
| 4 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) | 59.65 | cum | 3,234 | ₹1,92,908.1 |
| 5 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse Fine sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work) (Fine sand not less than in 1.25 FM)(PWD SOR 2022-23 Chapter No-06 Item No. 6.1.1 A) | 17.65 | cum | 5,500 | ₹97,075 |
| 6 | 12 mm thick plaster with cement mortar in proportion of 1:4 cement & fine sand (Dholpur sand Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including intarnal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.(PWD SOR 2022-23 Chapter No-13 Item No. 13.1 spec. No. 13.1.1) | 214.5 | Sqm | 200 | ₹42,900 |
| 7 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in ...........Technical Specification Clause 1501 (approved Quarri grit) (PWD SOR 2022-23, Chepter-20, SI N0 23 Item No New Item) | 57.01 | cum | 7,700 | ₹4,38,977 |
| 8 | R.C.C work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (PWDSOR 2022-23 Chapter No-05 Item No. 5.1spec. No. 5.1.3) | 0.54 | cum | 8,600 | ₹4,644 |
| 9 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) | 0.34 | Qtl | 7,800 | ₹2,652 |
| 10 | Provind and Laying Cement concrete in 1:2:4 with cement coarse sand : 20mm graded stone etc…… all complete. | 4.26 | cum | 6,600 | ₹28,116 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_2192881.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .