Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.1 LAccepted-Finance NABAGRAM DURGAPUR DISTRICT BURDWAN WEST BENGAL 713363 | DURGAPUR | BURDWAN | WEST BENGAL | 713363 | ₹32.1 L | 1 | Accepted-Finance L1 |
| 2 | 2₹33.1 L+₹1.0 L (3.24%)Rejected-Finance PANDAVSWAR AREA MORE PASCHIM BARDHAMAN WB 713378 | PASCHIM BARDHAMAN | PASCHIM BARDHAMAN | WB | 713378 | ₹33.1 L+₹1.0 L (3.24%) | 2 | Rejected-Finance Not L1 |
| 3 | 3₹33.8 L+₹1.7 L (5.31%)Rejected-Finance | ₹33.8 L+₹1.7 L (5.31%) | 3 | Rejected-Finance Not L1 |
| 4 | 4₹36.3 L+₹4.2 L (13.1%)Rejected-Finance CHINCHURIA JAMURIA KENDA 713378 WEST BENGAL INDIA | KENDA | PASCHIM BARDHAMAN | WEST BENGAL | 713378 | ₹36.3 L+₹4.2 L (13.1%) | 4 | Rejected-Finance Not L1 |
| 5 | 5₹38.2 L+₹6.2 L (19.2%)Rejected-Finance 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | ₹38.2 L+₹6.2 L (19.2%) | 5 | Rejected-Finance Not L1 |
Tender Value
₹46.6 L
EMD Value
₹58,300
Closing Date
12 May 2026, 5:00 pmClosed
Area Engineer (Civil), Pandaveswar Area
Office of the General Manager Pandaveswar Area
Construction of ICCC room at Area Office under Pandaveswar Area
2026_ECL_358927_1
GM-PA/AE(C)/e Tender/26-27/02/13 dated 30.04.2026
Open Tender
Civil Works - Buildings
Percentage
120 days
PANDAVESWAR AREA office
Please refer Tender documents.
4 documents required · 4 mandatory
₹58,300
18 Jul 2026
30 Apr 2026
13 May 2026
2 May 2026
12 May 2026
2 May 2026
2 May 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 M2 on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 16.41 | M3 | 188.75 | ₹3,098.05 |
| 2 | Supplying and filling in plinth with sand under floors, including watering,ramming, consolidating and dressing complete. | 4.22 | M3 | 1,061.6 | ₹4,476.03 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.39 | M3 | 5,434.55 | ₹12,994.57 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 8.25 | M3 | 6,903.9 | ₹56,928.26 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | 51.3 | M2 | 269.3 | ₹13,815.76 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.18 | M3 | 8,030.65 | ₹81,739.47 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 135.71 | M2 | 644.7 | ₹87,493.85 |
| 8 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor fivelevel, excluding the cost of centering, shuttering, finishing and reinforcementwith 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 52.81 | M3 | 8,420.4 | ₹4,44,712.01 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 275.88 | M2 | 617 | ₹1,70,216.42 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 152.34 | M2 | 494.05 | ₹75,261.77 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_371797.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .