Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
17 Apr 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EX.Engineer irrrigation ompora budgam
EX.Engineer irrrigation ompora budgam
Stage Contract for urgent nature Restoration works under M andR of Irrigation Division Ompora Budgam Chatta Khul, Fresin Gurvan and Lainz Khul For the year 2021-22
2021_IFC_122290_9
ENIT 02 OF 04-2021
Open Tender
Civil Works
Item Wise
365 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Yes
ExecutiveEngg ID ompora
₹6,000
Yes
19 Apr 2021
12 Apr 2021
19 Apr 2021
12 Apr 2021
17 Apr 2021
12 Apr 2021
365 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
Banking of excavated earth in layers not exeeding 20cm in depth, breaking clods watering,a rolling each layer with 1/2 ton roller or wooden or steel rammers and rolling every third and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks , marginal banks guide banks etc lead upto 50mtr and lift upto 1.5mtr in all kind of soil.
Felling of trees of girth (measured at height of 1 mtr above ground) including cutting of trunk and branches, removing of roots and stacking of seviceable material and disposal of unserviceable material beyond a) Beyond 3-cm girth upto and including 60 cm girth
b)beyond 60cm girth upto and including 120cm girtth
Providing of JCB (Hydraulic excavator) for emrgency works at site of work during flood or heavy rains and when required including cost of fuel and other allied charges,including haltage complete job.
Supply of earth during floods /heavy rains as and when required
Supply of 2nd class sand during floods/heavy rasins as and when required
Dumping stone excI cost of stone in Horizontal on level.
Hand packed stones into wire crates excluding cost of stones and crates.
Supply of stone boulders (nallah) during floods /heavy rains as and when required
Filling e/c bags with availalble earth including cost of strings and sewing
Placing of earth filled bags in position(Dry)
Placing of earth filled bags in position(Wet)
Laying of poythene sheets to prevent leakages
Laying of Non presured NP2 class light duty RCC spun pipes with collors jointed with stiff mixture of cement mortar in proportion of 1:2 including testing of joints complete Job.a) (250mm )
Providing and fixing of corrugated HDPE pipes including all sorts of carriages upto site of work. a) 8"
Silt Clearance from canals in Wet
Silt Clearance from canals in Dry
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive
Slip Clearance
Supply of Labours
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In Cement Motar
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:in Cement Motar
Dismantling wooden ballies in posts and struts including stacking within 50 meters lead.
Dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of rcc
Collection of stone boulders from the nearby site of canal/nallah including stacking at site.
Providing & fixing of Popular Sawed wood in the form of josts , planks, struts etc . for providing of wooden flume on canals in case of emergency including all accessores materials like nails etc. and all sorts of carriages. Complete job as per direction of Engineer Incharge.
Providing & fixing of plain GI tin sheets over flumes for cheaing leaks including all accessories materials and carriages complete job as per direction of Engineer Incharge.
Cost of Geo Tagged Photographs ( both Soft and Hard Copy) size 4"x6"
Carriage of Materials upto road site to site of work by Mechnical transport including cost of loading unloading and stacking a1)earth 1km (1st Km)
a2) Carraige of Earth for every additional km (actual as per site)
b1)sand 1km (1st Km)
b2) Carraige of Sand for every additional km (actual ap per site)
c1) stone boulder 1km (1st Km)
C2) Carraige of stone boulder for every additional km (actual as per site)
f1)E/C bags 1km (1st Km)
f2) Carraige of E/C bags for every additional km (actual as per site)
g1) crate mesh 1km (1st Km)
g2) Carraige of crate mesh for every additional km (actual as per site)
h1)Polythene 1km (1st Km)
h2) Carraige of Polyethene for every additional km (actual as per site)
i) RCC spun pipes 12" 1km (1st Km)
ii) Carraige of RCC spun pipes 12" for every additional km (actual as per site)
i)RCC spun pipe 18" 1km (1st Km)
ii) Carraige of RCC spun pipe 18" for every additional km (actual as per site)
i) RCC spun pipes 24" 1km (1st Km)
ii) Carraige of RCC spun pipes 24" for every additional km (actual as per site)
i)RCC spun pipe 36" 1km (1st Km)
ii) Carraige of RCC spun pipe 36" for every additional km (actual as per site)
Carraige of Un-hygenic Material/ Sludge (Wet) 1st km (1st Km)
Carraige of Un-hygenic Material/ Sludge (Wet) for every additional km (actual as per site)
Extra carriage of Materials from road site to site of work by Mannual labour/ponies Including loading unloading and stacking
a)earth 1st 50m
a2) Head Load of Earth for every additional 50m (actual as per site)
b)sand 1st 50m
b2) Head Load of Sand for every additional 50m (actual as per site)
c)E.C bags 1st 50m
c2) Head Load of E.C bags for every additional 50m (actual as per site)
d)crate mesh 1st 50m
d2) Head Load of Crate Mesh for every additional 50m (actual as per site)
e)poythene 1st 50m
e2) Head Load of Polyethene for every additional 50m (actual as per site)
i) RCC spun pipes 12" 1km (1st Km)
ii) Head Load of RCC spun pipes 12" for every additional 50m (actual as per site)
i) RCC spun pipes 18" 1km (1st Km)
ii) Head Load of RCC spun pipes 18" for every additional 50m (actual as per site)
i) RCC spun pipes 24" 1km (1st Km)
ii) Head Load of RCC spun pipes 24" for every additional 50m (actual as per site)
i) RCC spun pipes 36" 1km (1st Km)
ii) Head Load of RCC spun pipes 36" for every additional 50m (actual as per site)
Head Load Un-hygenic Material/ Sludge (Wet) 1st km (1st Km)
Head Load Un-hygenic Material/ Sludge (Wet) for every additional km (actual as per site)
M/S SHOWKAT NABI BANDAY
GH AHMAD DAR
BASHIR AHMAD PARRAY
GH AHMAD BHAT
M/s Ghulam Mohd Khan
M/S DANISH HASSAN WAZA
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .