| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.6 L+₹8,440 (0.74%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SEENAPPA BASKAR L2 | C REVATHI L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 1,200 | Rm | 305 ₹3,66,000 | 304 ₹3,64,800 Lowest |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,200 | Rm | 208 ₹2,49,600 | 207 ₹2,48,400 Lowest |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,200 | Rm | 21 ₹25,200 | 20 ₹24,000 Lowest |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,200 | Rm | 33 ₹39,600 | 32 ₹38,400 Lowest |
| 5.00 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm | 1,200 | Rm | 81 ₹97,200 | 80 ₹96,000 Lowest |
| 6.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,200 | Rm | 30 ₹36,000 | 28 ₹33,600 Lowest |
| 7.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 10 | Nos | 1,200 ₹12,000 Lowest | 1,200 ₹12,000 Lowest |
| 7.01 | 90 mm HDPE Elbow | 20 | Nos | 345 ₹6,900 | 343 ₹6,860 Lowest |
| 7.02 | 90 mm HDPE Flange set | 10 | Nos | 1,100 ₹11,000 Lowest | 1,100 ₹11,000 Lowest |
| 7.03 | 90 mm HDPE Tee | 20 | Nos | 475 ₹9,500 Lowest | 475 ₹9,500 Lowest |
Tender Value
₹13.8 L
EMD Value
₹13,750
Closing Date
24 Jul 2026, 3:00 pmClosed
commissioner
hosur city municipal corporation
Providing 90mm HDPE pipe line works at W.No.08, Basthi AD Colony, Maharishi Nagar to Thirupathi Nagar in Hosur City Municipal Corporation
2026_MAWS_685665_4
5684/2026/E1 Hosur City Municipal Corporation
Open Tender
Civil Works
Works
90 days
hosur city municipal corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,750
9 Oct 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 1,200 | Rm | - | - |
| 2 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,200 | Rm | - | - |
| 3 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,200 | Rm | - | - |
| 4 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,200 | Rm | - | - |
| 5 | Testing of pipes for water supply with hudralic testing equipments by filling with water including cost of water @ 60/KL and testing to recommended Pressure in convenient stretches and attending the brusts if any occurred during the test excluding the cost of pipes but including other incidential and operational charges ETC... complete for the following diameteres of pipes HDPE Pipe 90mm | 1,200 | Rm | - | - |
| 6 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,200 | Rm | - | - |
| 7 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 10 | Nos | - | - |
| 7.01 | 90 mm HDPE Elbow | 20 | Nos | - | - |
| 7.02 | 90 mm HDPE Flange set | 10 | Nos | - | - |
| 7.029999999999999 | 90 mm HDPE Tee | 20 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
Tendernotice_2.pdf
PDF • 0.95 MB
BOQ_824193.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .