| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 CrAccepted-AOC 344 SAKET COLONY ANSARI ROAD MUZAFFARNAGAR | SHAMLI | UTTAR PRADESH | 247771 | L1 | Accepted-AOC L1 | |
| 2 | L2₹22.3 Cr+₹99.7 L (4.68%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹22.4 Cr+₹1.1 Cr (4.97%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S CHAUDHARY ASSOCIATES L2 | Aryan Constrution and Associates L3 | raghuvanshi construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1Km i/c removal & disposal of top organic soil not exceeding 150 mm in thickness. as per MoRT&H specification clause No. 201,2.3 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 28,000 | Sqm. | 9 ₹2,52,000 | 8 ₹2,24,000 | 6 ₹1,68,000 Lowest |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 1,23,112 | Cum. | 180 ₹2,21,60,160 | 175 ₹2,15,44,600 Lowest | 175 ₹2,15,44,600 Lowest |
| 3.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, 4.1 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 14,400 | Cum. | 3,390 ₹4,88,16,000 | 3,400 ₹4,89,60,000 | 3,200 ₹4,60,80,000 Lowest |
| 4.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H specification clause No. 406B, 4.14 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 10,584 | Cum. | 3,860 ₹4,08,54,240 | 3,900 ₹4,12,77,600 | 3,700 ₹3,91,60,800 Lowest |
| 5.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per MoRT&H specification clause No. 502, 5.1 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of Bitumen Emulsion, Contractor Profit but excluding GST. | 77,000 | Sqm. | 40.9 ₹31,49,300 | 41 ₹31,57,000 | 35 ₹26,95,000 Lowest |
| 6.00 | Providing and applying tack coat with bitumen using bitumenn VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRT&H specification clause No. 503, 5.2 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 77,000 | sqm | 15.1 ₹11,62,700 | 16 ₹12,32,000 | 14 ₹10,78,000 Lowest |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505, 5.04 complete in all respects. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 5,005 | cum | 10,210 ₹5,11,01,050 | 10,300 ₹5,15,51,500 | 10,000 ₹5,00,50,000 Lowest |
| 8.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with mechanical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507, 5.5 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,310 | cum | 12,580 ₹2,90,59,800 | 12,600 ₹2,91,06,000 | 12,000 ₹2,77,20,000 Lowest |
| 9.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MoRT&H specification clause No. 304, 9.01B(i) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 168 | Cum. | 135 ₹22,680 | 135 ₹22,680 | 125 ₹21,000 Lowest |
| 10.00 | Plain cement concrete (PCC 1:3:6 in Foundation) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MoRT&H specification clause No. 12.04, 2100, 12.04 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 33 | Cum. | 4,700 ₹1,55,100 | 4,700 ₹1,55,100 | 4,500 ₹1,48,500 Lowest |
Tender Value
₹23 Cr
EMD Value
₹34.5 L
Closing Date
16 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
se pwd saharanpur
se pwd saharanpur
Construction work of remaining part of widening and strengthening from Meerut Karnal National Highway No. 709A to Gandevada Sangam Road via Dhindhali in district Shamli in F.Y. 2025-26
2026_CEMRT_1114844_1
120/25MS-S/2026 Date 06-01-2026
Open Tender
Civil Works
Item Rate
450 days
shamli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹34.5 L
27 Mar 2026
11 Feb 2026
16 Feb 2026
11 Feb 2026
16 Feb 2026
11 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1Km i/c removal & disposal of top organic soil not exceeding 150 mm in thickness. as per MoRT&H specification clause No. 201,2.3 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 28,000 | Sqm. | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 1,23,112 | Cum. | - | - |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401, 4.1 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 14,400 | Cum. | - | - |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H specification clause No. 406B, 4.14 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 10,584 | Cum. | - | - |
| 5 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. as per MoRT&H specification clause No. 502, 5.1 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of Bitumen Emulsion, Contractor Profit but excluding GST. | 77,000 | Sqm. | - | - |
| 6 | Providing and applying tack coat with bitumen using bitumenn VG-10 pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRT&H specification clause No. 503, 5.2 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 77,000 | sqm | - | - |
| 7 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 505, 5.04 complete in all respects. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 5,005 | cum | - | - |
| 8 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with mechanical control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507, 5.5 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,310 | cum | - | - |
| 9 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. as per MoRT&H specification clause No. 304, 9.01B(i) I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 168 | Cum. | - | - |
| 10 | Plain cement concrete (PCC 1:3:6 in Foundation) nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. as per MoRT&H specification clause No. 12.04, 2100, 12.04 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 33 | Cum. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.90 MB
BOQ_2067922.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .