Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Finance | ₹4.4 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RISHI CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Regular Maintenance of Water Supply Scheme for two years at Ind area Gudli Udaipur | ||||
| 1.01 | Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and un-lowering etc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electric connections service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wellslt is also inclusive of complete repair and maintenance of pipes connected with pump and motor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender document scope of work complete in all respect and as directed by engineer in charge | 24 | Per tubewell per month | 6,100 ₹1,46,400 Lowest |
| 1.02 | Regular operation and maintenance of pump houses located at WSS Complex The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation Regular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clock monitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing material panel main switches kit Kates Electric connections service cable including cost of material and labour required for repairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets with regular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campus complete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in charge | 24 | Per pump house per month | 6,100 ₹1,46,400 Lowest |
| 1.03 | Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVC UPVC HDPE CI DI Lines for maintaining smooth water supply in area covered under the scope of work The scope of work includes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site of work at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractor will do dewatering at his own level by making necessary arrangements if required Contractor has to provide water connection from distribution line to allotee and distribution of water bills to allottes.Contractor will use their own T and P however the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store But no additional payment shall be made on account of transportation. | 24 | per month | 6,000 ₹1,44,000 Lowest |
Tender Value
₹3.6 L
EMD Value
₹7,121
Closing Date
7 Aug 2026, 5:00 pmClosed
Additional GM
ROAD NO 2 MIA UDAIPUR
Regular Maintenance of Water Supply Scheme for two years at Ind area Gudli Udaipur
2026_RIICO_579503_1
2026/Udaipur/40344/1711
Open Tender
Civil Works
Item Rate
730 days
Gudli Industrial area
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
RIICO UDAIPUR
₹7,121
Yes
15 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Regular Maintenance of Water Supply Scheme for two years at Ind area Gudli Udaipur | |||||
| 1.01 | Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour requited for repairing rewinding lowering and un-lowering etc The scope of work also includes repair and maintenance of panel board main switches kit Kates Electric connections service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wellslt is also inclusive of complete repair and maintenance of pipes connected with pump and motor its replacement if required regular upkeeping of log book etc and other works as mentioned in tender document scope of work complete in all respect and as directed by engineer in charge | - | Per tubewell per month | 1,400 | - |
| 1.02 | Regular operation and maintenance of pump houses located at WSS Complex The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation Regular Operation of pump house installed with existing centrifugal Monoblock pump motors with round the clock monitoring including complete repair and maintenance of pump sets connecting suction delivery pipes jointing material panel main switches kit Kates Electric connections service cable including cost of material and labour required for repairing rewinding removal and replacement etc for uninterrupted functioning of Electric Panels and Pump sets with regular upkeepment of log books repair of leakages in pump glans and MS Cl AC Pipeline system inside of WSS Campus complete Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in charge | - | Per pump house per month | 5,235 | - |
| 1.03 | Repair and maintenance of existing distribution rising main pipe line system consisting of AC Pressure Pipeline PVC UPVC HDPE CI DI Lines for maintaining smooth water supply in area covered under the scope of work The scope of work includes timely repairing of leakage in all existing distribution rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil hard soil including cutting of Bituminous Cement Concrete WBM WMM surface at any site of work at no extra cost It is also inclusive of cutting of pipe ends fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit trench by excavated soil by ramming it at all sides of pipes upto ground level Contractor will do dewatering at his own level by making necessary arrangements if required Contractor has to provide water connection from distribution line to allotee and distribution of water bills to allottes.Contractor will use their own T and P however the pipe line and jointing materials sluice valves etc shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store But no additional payment shall be made on account of transportation. | - | per month | 8,200 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
TDWSSGUDLI.pdf
Tender Documents • 0.20 MB
BOQ_1029850.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].