Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 CrAccepted-AOC KHUDUS | MALSHIRAS | SOLAPUR | MAHARASHTRA | ₹4.5 Cr | 1 | Accepted-AOC ac |
| 2 | 2₹4.5 CrSame as 1Rejected-AOC N A | ₹4.5 CrSame as 1 | 2 | Rejected-AOC re |
| 3 | 3₹4.5 CrSame as 1Rejected-AOC 1551 SUBHASH NAGAR BARSHI TAL BARSHI DIST SOLAPUR | BARSHI | SOLAPUR | MAHARASHTRA | ₹4.5 CrSame as 1 | 3 | Rejected-AOC re |
Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
18 Feb 2026, 5:00 pmClosed
Add ceo zp solapur
ee bnc 2
as above
2026_SOLAP_1276581_1
CONSTRUCTION OF STAFF QUARTERS FOR P.H.C.MAIN BUILDING at Gurasale, Tal - Pandharpur,
Open Tender
Civil Works
Percentage
365 days
solapur
Please refer Tender documents.
5 documents required · 5 mandatory
₹15,000
₹4.5 L
2 Apr 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift Upto3.00 M.) By Manual Means SSR Pg No./It No. 153/720/21.01/BDA1 Spec. No. : Bd A.1 Page No. 259 TYPE-I | 116.11 | Cu.m. | 250.7 | ₹29,108.78 |
| 2 | TYPE-II | 118.26 | Cu.m. | 250.7 | ₹29,647.78 |
| 3 | TYPE-III | 101.6 | Cu.m. | 250.7 | ₹25,471.12 |
| 4 | POST MOTOM ROOM | 40.45 | Cu.m. | 250.7 | ₹10,140.82 |
| 5 | COMPOUND WALL | 128.24 | Cu.m. | 250.7 | ₹32,149.77 |
| 6 | Excavation for foundation in hard murum including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete ( Lift Upto 1.5 m) By Manual Means. SSR Pg No./It No. 153/725/21.06/BDA2 Spec. No. : Bd A. 2 Page No. 259 TYPE-I | 60.24 | Cu.m. | 238.1 | ₹14,343.14 |
| 7 | TYPE-II | 62.53 | Cu.m. | 238.1 | ₹14,888.39 |
| 8 | TYPE-III | 45.25 | Cu.m. | 238.1 | ₹10,774.03 |
| 9 | POST MOTOM ROOM | 23.19 | Cu.m. | 238.1 | ₹5,521.54 |
| 10 | COMPOUND WALL | 200.88 | Cu.m. | 238.1 | ₹47,829.53 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.71 MB
BOQ_2196723.xls
BOQ • 0.82 MB
SBD.pdf
Tender Documents • 2.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .