| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63,007Admitted-Fee/PreQual/Technical/Finance | ₹63,007 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹72,387Admitted-Fee/PreQual/Technical/Finance | ₹72,387 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SARVESH ADS L1 | Sekar L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for cutting open BT Road for laying water mains including cost and conveyance of materials cost etc.,complete | 10 | m3 | 300 ₹3,000 Lowest | 998 ₹9,980 |
| 2.00 | Earth work pipe line excavated in all charges of soils and sub soils except hard rock requiring blasting with initial lead and lift including etc, complete as per SS20B all other incidental charges etc, complete | 105 | m3 | 85 ₹8,925 Lowest | 200 ₹21,000 |
| 3.00 | Supply and delivery of 90mm PVC Pipe 6 KSC including cost and conveyance of materials cost etc.,complete | 194 | Mtr | 220 ₹42,680 | 150 ₹29,100 Lowest |
| 4.00 | Lowering PVC pipes and specials to trench and laying to proper grade and alignment and as directed by the Departmental Officers | 194 | Mtr | 28 ₹5,432 Lowest | 38 ₹7,372 |
| 5.00 | Supply and delivery of PVC Pipe Specials including cost and conveyance of materials cost 90mm PVC Elbow | 1 | No | 95 ₹95 | 90 ₹90 Lowest |
| 6.00 | 90mm PVC Coupling | 1 | No | 150 ₹150 | 60 ₹60 Lowest |
| 7.00 | 90mm PVC Tee | 1 | No | 150 ₹150 Lowest | 150 ₹150 Lowest |
| 8.00 | Refilling with excavated soil and other sand including all labour charges etc, complete as per standard specification. | 103 | Mtr | 25 ₹2,575 Lowest | 45 ₹4,635 |
Tender Value
₹82,000
Closing Date
29 Jul 2026, 3:00 pmClosed
Commissioner Thirupathur Municipality
Thirupathur Municipality
Providing Water Supply Distribution Pipe Line B.K Nagar in Ward No 02 Thirupathur Municipality
2026_MAWS_684684_1
0191/2026/E1
Open Tender
Pipe Laying Works
Works
60 days
Thirupathur Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Yes
29 Jul 2026
9 Jul 2026
29 Jul 2026
9 Jul 2026
29 Jul 2026
9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for cutting open BT Road for laying water mains including cost and conveyance of materials cost etc.,complete | 10 | m3 | - | - |
| 2 | Earth work pipe line excavated in all charges of soils and sub soils except hard rock requiring blasting with initial lead and lift including etc, complete as per SS20B all other incidental charges etc, complete | 105 | m3 | - | - |
| 3 | Supply and delivery of 90mm PVC Pipe 6 KSC including cost and conveyance of materials cost etc.,complete | 194 | Mtr | - | - |
| 4 | Lowering PVC pipes and specials to trench and laying to proper grade and alignment and as directed by the Departmental Officers | 194 | Mtr | - | - |
| 5 | Supply and delivery of PVC Pipe Specials including cost and conveyance of materials cost 90mm PVC Elbow | 1 | No | - | - |
| 6 | 90mm PVC Coupling | 1 | No | - | - |
| 7 | 90mm PVC Tee | 1 | No | - | - |
| 8 | Refilling with excavated soil and other sand including all labour charges etc, complete as per standard specification. | 103 | Mtr | - | - |
stage.html
html • 0.02 MB
finance_823054.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_823054.xls
BOQ • 0.28 MB
corregendum.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].