| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 Cr+₹48.2 L (17.3%)Admitted-Finance | ₹3.3 Cr+₹48.2 L (17.3%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SIDDHIVINAYAK INFRASTRUCTURE L2 | Atul Sambhajirao Nikam L1 |
|---|---|---|---|---|---|
| 1.00 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix
and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) | 274.4 | One Cubic Metre | 11,000 ₹30,18,400 | 6,390 ₹17,53,416 Lowest |
| 2.00 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of
specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,470 | One Cubic Metre | 12,000 ₹1,76,40,000 | 9,022 ₹1,32,62,340 Lowest |
| 3.00 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 63,274.4 | One Square Metre | 18 ₹11,38,939.2 | 15 ₹9,49,116 Lowest |
| 4.00 | Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal
with conical crusher plant heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG30 bulk bitumen rates are considered to arrive at
rates) | 17,500 | One Square Metre | 306 ₹53,55,000 | 249 ₹43,57,500 Lowest |
| 5.00 | Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum.Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary
labour, material and artificial watering etc. complete complete as directed by Engineer in charge. 1.Spec. No. Rd.28,30,31 Page No.205.
2.Spec. No. Rd.23 Page No.202. 3.Spec. No. Rd.38 Page No.211. | 10,000 | One Cubic Metre | 450 ₹45,00,000 Lowest | 653 ₹65,30,000 |
| 6.00 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of
unsuitable or excess stuff as directed all sorts of soils. | 14,000 | One Cubic Metre | 75 ₹10,50,000 | 70 ₹9,80,000 Lowest |
| 7.00 | Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed. | 1,500 | One Cubic Metre | 48.2 ₹72,300 Lowest | 80 ₹1,20,000 |
Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
6 Feb 2024, 5:30 pmClosed
EE NHD Aurangabad Chh. Sam.
EE NHD Aurangabad Chh. Sam.
OR DPP to AS Club Vaijapur Kopargaon Road Km. 00.000 to Km. 50.000 section of NH 752 I in the state of Maharashtra.
2024_MoRTH_790475_1
EENHD/Chh.S./Tender/NIT No-03/300035
Open Tender
Civil Works
Works
335 days
Chhatrapati Sambhajinagar (Aurangabad)
Rs.5,000/- Toward cost of RFP at the time of the submission, through the portal Bharatkosh.gov.in (receipt/document of online payment to be submitted along with bid in soft copy.
8 documents required · 8 mandatory
₹0
₹4.1 L
SE NH Circle Office Chh. Sambhajinagar Aurangabad
12 Mar 2024
15 Jan 2024
7 Mar 2024
15 Jan 2024
6 Feb 2024
15 Jan 2024
18 Jan 2024
Amount
DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates)
BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates)
Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG30 bulk bitumen rates are considered to arrive at rates)
Supplying hard murum / kankar at the road side, including conveying and stacking etc. Spreading hard murum.Compacting the hard murum / kankar in layers of thickness upto 20cm with vibratory roller including necessary labour, material and artificial watering etc. complete complete as directed by Engineer in charge. 1.Spec. No. Rd.28,30,31 Page No.205. 2.Spec. No. Rd.23 Page No.202. 3.Spec. No. Rd.38 Page No.211.
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils.
Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed.
SIDDHIVINAYAK INFRASTRUCTURE
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .