Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical admitted |
| 2 | Accepted-Technical SASPOL | Accepted-Technical admitted |
| 3 | Accepted-Technical | Accepted-Technical admitted |
| 4 | Accepted-Technical STAKMO | Accepted-Technical admitted |
| 5 | Accepted-Technical | Accepted-Technical admitted |
Tender Value
₹11.8 L
EMD Value
₹27,720
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction and Upgradation of main Mayur Gongma at Liker (Lartan to Sabchak(Under Capex)
2026_PWD_19317_3
28 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
60 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer InFC division Leh
₹27,720
22 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 171.5 | Cum | 445.85 | ₹76,463.28 |
| 2 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 55.12 | Cum | 537.71 | ₹29,638.58 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)1:2:4 (1 cement : 2 coarse sand (zone-III) including manufactured sand derived | 97.12 | Cum | 7,993.55 | ₹7,76,333.58 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form
work for Foundations, footings, bases for columns | 525 | Sqm | 306.15 | ₹1,60,728.75 |
| 5 | Carriage of material by mechanical transport includind loading unloading and stacking. A.Solling stone an avg lead of 05 kms | 55.12 | Cum | 236.64 | ₹13,043.6 |
| 6 | B. Cement an avg lead of 50 kms. | 31.07 | MT | 585.61 | ₹18,194.9 |
| 7 | c.Sand an avg lead of 20 kms. | 45.64 | Cum | 384.74 | ₹17,559.53 |
| 8 | c.Stone agg an avg lead of 20 kms. | 86.43 | Cum | 384.74 | ₹33,253.08 |
| 9 | Carriage of material by manual labour includind loading unloading and stacking. A. Solling stone an avg lead of 100mtrs | 55.12 | Cum | 271.21 | ₹14,949.1 |
| 10 | B. Cement an avg lead of 100 mtrs. | 31.07 | MT | 129.21 | ₹4,014.55 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_45907.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .