Loading…
Loading…
Tender Value
₹5.9 Cr
EMD Value
₹11.8 L
Closing Date
24 Sept 2026, 5:00 pmDue tomorrow
VIKRAM SINGH
Storm Water Drainage
Supply, installation and commissioning of Radar Level Sensor 3. PTZ Camera 4. Data Logger
2026_HRY_548541_1
202628B8D28C C571 4D59 9B75 156AB4B1575F717001
Open Tender
Civil Works
Works
90 days
Gurugram
Supply, installation and commissioning of Radar Level Sensor
2 documents required · 2 mandatory
₹5,000
₹11.8 L
Yes
17 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning of Radar Level Sensor (RLS) complete with SVR100 Surface Velocity Sensor for measurement of water level, surface velocity, flow rate, total flow, and cumulative volume, including SL-3 Display Unit (1 No.) and Prodis Software for profiling, velocity, level, flow, and volumetric measurement. The scope shall include supply of all accessories, mounting arrangements, cabling, interconnections, configuration, calibration, testing, commissioning, and integration required for complete and satisfactory operation of the system, strictly in accordance with the manufacturer`s specifications and as directed by the Engineer-in-Charge, complete in all respects. | 10 | Each | - | - |
| - | Supply, installation, testing and commissioning of Solar Panel complete with Solar Charge Controller, including all necessary mounting structures, brackets, cables, connectors, battery interfacing (where applicable), earthing, hardware, accessories, wiring, testing, and commissioning for providing a reliable power supply, as per the manufacturer`s specifications and as directed by the Engineer-in-Charge, complete in all respects. | 10 | Each | - | - |
| - | Supply, installation, testing and commissioning of Pan-Tilt-Zoom (PTZ) Camera complete with protective cage enclosure as per the drawings provided in Section-IV, including all mounting accessories, power supply, cabling, connectors, hardware, and other accessories required for proper installation and operation. The camera system shall include cloud-based video storage with a minimum retention period of 40 days and shall be capable of continuous remote monitoring for surveillance and regular monitoring of the installation/site. The scope shall also include configuration, testing, commissioning, and integration of the complete system to ensure satisfactory performance, as per the manufacturer`s specifications and as directed by the Engineer-in-Charge, complete in all respects. | 10 | Each | - | - |
| - | Supply, installation, testing and commissioning of Data Logger complete with Cloud-Based Monitoring Software Platform for acquisition, storage, processing, visualization, and transmission of monitoring data. The system shall support real-time data logging, remote monitoring, data analytics, alarm generation, historical data storage, and report generation. The scope shall include data transfer and integration with the GMDA/HSPCB website through Application Programming Interface (API) for seamless and secure exchange of monitoring data, along with all necessary hardware, communication modules, software licenses, configuration, programming, API integration, testing, commissioning, training, and documentation required for complete and satisfactory operation of the system. The entire system shall be installed, tested, and commissioned in accordance with the manufacturer`s specifications and as directed by the Engineer-in-Charge, complete in all respects. | 10 | Each | - | - |
| - | Supply, installation, testing and commissioning of Online Water Quality Analyzer for continuous monitoring of Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), Total Suspended Solids (TSS), and pH, complete with sensors, analyzer unit, sample handling system, calibration accessories, mounting arrangements, power supply, cabling, communication modules, and all other necessary hardware and accessories required for proper installation and operation. The scope shall include configuration, calibration, testing, commissioning, training, and integration with the data logger and cloud monitoring platform, wherever applicable, to facilitate real-time data acquisition, storage, visualization, and transmission. The system shall be supplied complete with all necessary software, licenses, documentation, and consumables required for commissioning and shall operate in accordance with the manufacturer`s specifications and as directed by the Engineer-in-Charge, complete in all respects. | 6 | Each | - | - |
| - | Operation and Maintenance with insurance (after warranty period of 1 year) (2nd year) as per direction by Engineer in Charge complete in all respect. | 10 | Each | - | - |
| - | Operation and Maintenance with insurance (after warranty period(3rd year) as per direction by Engineer in Charge complete in all respect. | 10 | Each | - | - |
| - | Operation and Maintenance with insurance (after warranty period (4th year) as per direction by Engineer in Charge complete in all respect. | 10 | Each | - | - |
| - | Operation and Maintenance with insurance (after warranty period (5th year) as per direction by Engineer in Charge complete in all respect. | 10 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_628242.xls
BOQ • 0.26 MB
777806Z179640.pdf
Additional Documents • 2.13 MB
OT0179640.pdf
Other Document • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .