Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.4 LAccepted-AOC | ₹12.4 L Quoted ₹10.5 L | L-1 | Accepted-AOC The work is awarded to L-1 bidder |
| 2 | Rejected-Technical R P NAGAR KORBA C G DIST KORBA C G PIN 495678 | 495678 | - | - | Rejected-Technical DUE TO L-3 BIDDER |
| 3 | Rejected-Technical B 71 VIKAS NAGAR COLONY NEAR GURUDWARA KUSMUNDA DIST KORBA C G 495454 | KORBA | CHHATTISGARH | 495454 | - | - | Rejected-Technical DUE TO L- 2 BIDDER |
Tender Value
₹20.9 L
EMD Value
₹26,200
Closing Date
8 Jul 2022, 5:00 pmClosed
GM CIVIL GEVRA AREA
Office of the General Manager , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 9425534061
Making wing walls / protection walls for Hume pipe culverts at different locations of Gevra Project of Gevra Area
2022_SECL_247346_1
SECL /GA/ GM(C) / ETN/ 22-23 /54 dtd. 20.06.22
Open Tender
Civil Works - Others
Item Rate
90 days
Gevra Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹26,200
3 Nov 2022
22 Jun 2022
11 Jul 2022
22 Jun 2022
8 Jul 2022
23 Jun 2022
22 Jun 2022 - 26 Jun 2022
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, huttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone ggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Total impact of GST for the purpose of CTC
M/s Yugesh Prasad Singh
BHAKULAL SAHU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_255551.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .