Loading…
Loading…
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
21 Jul 2026, 12:00 pm
EE C BR_VIII
172/5, R.B. AVE KOL- 29
DIFFERENT MAINTENANCE WORKS AT KEORATOLA MAHA SMASHAN IN WARD NO-088.
2026_KMC_1031368_1
KMC/EEC/VIII/088/001/26-27/R
Open Tender
CIVIL WORKS
75 days
IN WARD NO 88
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
10 Jul 2026
10 Jul 2026
23 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 57.36 | SQM | 19 | ₹1,089.84 |
| 2 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 57.36 | SQM | 161 | ₹9,234.96 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 1. Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment) | 6.97 | M3 | 306 | ₹2,132.82 |
| 4 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (ii) Other than Coloured decorative including white. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m | 12 | SQM | 1,040 | ₹12,480 |
| 5 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 31. Supplying, fitting & fixing granite tiles 10mm to 12mm. thick in columns, wall, facia etc. with 15 thick [avg] cement mortar (1:2) including making suitable arrangements to hold the stones properly by brass / copper hooks including pointing in cement mortar (1:2) (1 white cement : 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of the Engineer-in-charge including cost of all materials, labours, scaffolding, staging ,curing and roughening of concrete surface complete. [Using cement slurry at back side of tiles@ 4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m] Area of each slab upto 0.2 Sq.m. (Add extra for each addl, floor over the rate for item 22, 25, 26, 17, 20, 31, 32 & 15 of subhead A. (I) upto 4 th floor- Rs. 12/-per Sq.m (II) above 4th floor -Rs. 16/- per Sq.m | 3.3 | SQM | 1,755 | ₹5,791.5 |
| 6 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) ((ii) Grill weighing above 16 Kg./sq.mtr and above. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018) | 1.6 | QTL | 9,696 | ₹15,513.6 |
| 7 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 19. (a) Supplying, fitting and fixing steel rolling shutter profile type with 18 B.G . of approved type steel latche section 75mm wide, fitted with coil wire spring to necessiate the fitting of required Nos. of C.I. Pulleys on heavy type solid drawn seamless steel tube complete with locking arrangements both inside and outside specially builtup side guide channels including providing a hood for the steel rolling shutter in the room, painting two coats of approved aluminium paint over a coat of red lead primer complete. 1. (Measurement will be made on the area of opening covered by the rolling shutter corrected upto 2 decimal.) 2. Payment of painting to be separately. | 22.05 | SQM | 2,170 | ₹47,848.5 |
| 8 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 14. Oiling and greasing of rolling shutter and repair to in side lock. | 60.05 | SQM | 73 | ₹4,383.65 |
| 9 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 7. Reparing collapsible gate by cutting out all rivets as necessary reassambling all members including welding pieces of channels, sraightening bent bars and rivetting with new rivets and fitting in position and painting two coats. | 39.6 | SQM | 379 | ₹15,008.4 |
| 10 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 8. Easing and oiling, cleaning collapsible gate and repairing to locking arrangements | 55.02 | SQM | 17 | ₹935.34 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
BOQ_2532530.xls
BOQ • 0.38 MB
TF.pdf
Tender Documents • 1.07 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
Download all tender documents and submit your bid