Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.0 LAccepted-AOC | ₹44.0 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹48.4 L+₹4.4 L (9.94%)Rejected-Finance | ₹48.4 L+₹4.4 L (9.94%) | L2 | Rejected-Finance Being Not L1 |
Tender Value
₹42.8 L
EMD Value
₹85,600
Closing Date
12 Sept 2022, 6:00 pmClosed
Col Subhro Banerjee CWE
Commander Works Engineers AF South Gangamma Circle Opp Guard Room 410 AFS Jalahalli Bangalore 560013
PROVISION OF EFFLUENT TREATMENT PLANT (ETP) AND ACCOMMODATION OF CENTRAL GAS PIPELINE SYSTEM FOR 6AFH AT AFAC COIMBATORE
2022_MES_517074_5
84210/E8
Open Tender
Civil Works
Lump-sum
180 days
AGE (I) (AF) Coimbatore
As per tender documents
7 documents required · 7 mandatory
₹500
Yes
AGE (I) (AF) Coimbatore
₹85,600
8 Oct 2022
17 Aug 2022
14 Sept 2022
17 Aug 2022
12 Sept 2022
31 Aug 2022
17 Aug 2022 - 24 Aug 2022
Amount
GENERALSUMMARY Note : Schedule ‘A’ Part I & II are prepriced by MES under Ser No. 2 and 3 Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only.
Lumpsum price worked out by the contractor for “Building Work” as listed in Schedule ‘A’ Part-I representing **______________% (_______________________)* above/below the lumpsum price of Rs 710000.00 inserted by MES for Schedule 'A' Part-I.
Lumpsum price worked out by the contractor for “Internal Electrification” as listed in Schedule ‘A’ Part–II representing **______________% (_______________________)* above/below the lumpsum price of Rs 73609.11 inserted by MES for Schedule 'A' Part-II.
SCHEDULE `A' PART - III Miscellaneous items is not prepriced by MES and prepriced rates indicates 0.0 under column 5 signified this fact only. Bidder shall insert their rates in Green filed under Col-6.
Medical gas outlet pipes supply, install, commissioning and testing of copper pipes drawn half hard temp.,solid drawn, seamless, Phosphorous di-oxidized, non-arsenic and degreased copper pipe (Grade CW024A/Cu-DHP) conforming to EN13348:2001with incorporation of amendment. All pipes should be installed as per HTM 2022 or NFPA 99. The supplies of copper pipe would be accompanied with manufacturers test certificate for the physical properties of copper pipes and their Chemical composition. The supply of pipes be further substantiated with inspection certificate from the third party like SGS/ Lloyds Register (MAKE: RAJKO, JANYA, MAX FLOW). Fittings:All copper fittings shall be manufactured to the highest standards complying with EN1254-1. The fittings should be manufactured in accordance with EN1254-1 and 4 (formerly BS864:Part 2). Copper pipes would be secured to wall with LDPE saddles or to ceiling fixed MS bracket wherever necessary . Brazing :For copper joints, brazing material to be used will be silver-copper phosphorous alloy which shall be used without flux. For copper to brass joints 43% silver brazing rods with flux would be used.Flow of nitrogen gas would be provided to avoid oxidization inside the pipeline during brazing. Fabrication: Cleaning : Before putting for erection all pipes,valves and fittings shall be cleaned and degreased.Pipe and tube joints: For copper fittings in the copper pipeline,the brazing for copper joints shall be done without using flux and the material for jointing used will be silver-copper phosphorous alloy. For brass joints for jointing outlet points and area/zonal valves material used is 43% silver brazing rod with specified flux. For installation of equipment's threaded connections equipped with nut, nipple & adaptors are used.
Bends: All bends are made of copper pipe of higher Dia than the pipe requiring change of direction and these bends will be made out of thicker size pipe to avoid thinning and flattening at any point.Erection:The erection of the copper pipe shall be done only after cutting the pipes to size as per site requirements.It does not leave any scope for springing. Supports:To avoid weight of the pipe on the joints supports (saddles made of LDPE material) are provided at a distance of every 4-6 feet as prescribed by HTM-2022 and NFPA99. Testing Blowing:After erection all the pipes are blown with nitrogen or compressed air. This blowing of the pipeline with nitrogen or compressed air under pressure cleans the pipeline thoroughly Joints tests: The entire pipeline after erection is put to test for checking leakage of brazing joints at a pressure one and a half times of the working pressure for 24hours. In case of drop in pressure the joints are examined with soap solution. Final test: After repairing the joints in case leakages are found, the pipeline shall again be put to test with compressed air at a pressure of one and a half times the working pressure for 24hours and then there after entire pipeline will be tested with specific gas for anti-confusion tests.Painting: All pipes after lying shall be painted as per color specification "IS CODE "2379: 1963 amended 1990 or BS1710: 1984 for size of 15 x 0.9mm outer dia complete all as specified and directed.
Description all as per item No 1 to 1.1 above but for size of 22 x 0.9mm outer dia
Description all as per item No 1 to 1.1 above but for size of 28 x 0.9mm outer dia
Supply, install test and commissioning of medical gas compressor single stage 8.5 Kg/Cm2 working pressure, piston displacement 649 LPM three phase 50 Hz 440 volts 5 HP capacity hospital grade (non lube model) as per ISO 14001 with auto on off starter with pressure switch, 500 ltrs air storage tank, pressure gauge, safety valves for relese the air as per standered pressure of storage tank, common base frame of suitable size for motor and compressor and storage tank including necessary foundation and standared accessaries all as directed Make - Anest Iwata or equivalent
Supply, install, test and commissioning of dry spell plus drier uint 10 CFM heat less Air dryer twin tower model suitable for 5 HP air compreessor fitted with pre filter, bypass arrangement controlled by electronic timer complete unit fitted in rigid floor mounted frame all as directed. Make - Trident or equivalent
Design, Supplying, of Effluent Treatment Plant capacity 10 CMD .(including excavation, back filling & disposal of surplus earth /Civil construction work) for the following duty: Nature of effluent -Hospital Building Effluent from Lab use , Operation Threatre and other areas of Hospital building.
Incoming Criterion: Hydrogen Ion Concentration - 5.8-7.5, BOD5 - upto 0.75 Ib/yd3, S. Solids - 0.42-0.45 Ib/yd3, COD - upto 2.35-2.85 Ib/yd3, Oil & Grease -Upto 0.08 Ib/yd3
Standard after treatment : Hydrogen Ion Concentration - 6.0 - 7 , BOD5 - Less than 0.05 Ib/yd3, S. Solids - Less than 0.016 Ib/yd3 ,COD - Less than 0.08 Ib/yd3 ,Oil & Grease - NIL, Comprising of the following works as listed:-
Effluent Treatment Plant civil works
Bar Screen Chamber (0.6 L X 0.6 W X 1.0 T.D)-RCC wall Thickness-200mm/Epoxy Coating
Receiving Tank (2.0 L X 2.0 W X 3.5 T.D)-RCC wall Thickness-200mm/Epoxy Coating
Aerobic Digestor beds( 1.0 x 1.0 x 1.0)-RCC wall Thickness-200mm/Epoxy Coating
Bloom Box Effluent Treatment plant (1.5 X 2.0 X 1.3 (T.D) Pedestal Work
Supply , installation, testing & commissioning of 1 No Manual handrack Stainless Steel Bar Screen with suitable lifting arrangement . Make: GRAM
Supplying, installing, testing and commissioning of 2 Nos. (one working + one standby) submersible type raw Bloom Box water pumps with cutter version. The pump shall be coupled to adequate H.P.The pump shall be provide with suitable enclosure with strainer arrangement for the protection submersible pumps.Dry Run Protection ,1 no. pressure gauge 4" dial with valve tee and fittings.2 nos. of ball valves of brass body nickel plated with stainless steel ball, lever operated (RB/TBS / Cimbrio make) and tested to 20 kg / sq.cm.on delivery side. 2 nos. spring operated type gun metal non return valve tested to 10 kg/ sq.cm pressure including necessary fittings like union, Hex, nipples etc. on delivery side.GI manifold of suitable dia on delivery side finished neatly with hot dip galvanizing to 100 microns with flanged end on either sides and collar provision for connectivity of above mentioned valves. Submersible Raw Transfer Pumps 2 Nos. (1 Working + 1 Standby ) , Flow rate (each) = 1000 LPH, Head 32.8 feet, Make - Gram
COAGULENT DOSING SYSTEM : Supplying, installing, testing and commissioning of Coagulent dosing system consisting of one LDPE tank of 50 litres capacity with a positive displacement diaphragm dosing pump having variable flowrate of 0-6 lph. The motor shall be suitable for operation at 240 V / single phase /50 Hz. Supply. The pump shall be supplied complete with necessary polypropylene piping, valves, strainers and injection fittings. The pump shall be speed & stroke control. The pump shall be suitable for the following requirements: Min. Actuating Pressure - 5 kg/sq cm, Max. Working Pressure - 6 kg/sq cm, Max. Temperature - 50 degree Centigrade, Dosing flow range- 0-6 LPH, Head - 16.4 Ft, Chemical: Cationic Polymer Make Gram
POLY DOSING SYSTEM : Supplying, installing, testing and commissioning of Coagulent dosing system consisting of one LDPE tank of 50 litres capacity with a positive displacement diaphragm dosing pump having variable flowrate of 0-6 lph. The motor shall be suitable for operation at 240 V / single phase /50 Hz. Supply. The pump shall be supplied complete with necessary polypropylene piping, valves, strainers and injection fittings. The pump shall be speed & stroke control. The pump shall be suitable for the following requirements: Min. Actuating Pressure - 5 kg/sq cm, Max. Working Pressure - 6 kg/sq cm, Max. Temperature - 50 degree Centigrade, Dosing flow range- 0-6 LPH, Head - 16.4 Ft, Chemical: Anionic Polymer Make Gram
PH DOSING SYSTEM : Supplying, installing, testing and commissioning of Coagulent dosing system consisting of one LDPE tank of 50 litres capacity with a positive displacement diaphragm dosing pump having variable flowrate of 0-6 lph. The motor shall be suitable for operation at 240 V / single phase /50 Hz. Supply. The pump shall be supplied complete with necessary polypropylene piping, valves, strainers and injection fittings. The pump shall be speed & stroke control. The pump shall be suitable for the following requirements: Min. Actuating Pressure - 5 kg/sq cm, Max. Working Pressure - 6 kg/sq cm, Max. Temperature - 50 degree Centigrade, Dosing flow range- 0-6 LPH, Head - 16.4 Ft, Chemical: HCL/Caustic Make Gram
REACTION TANK WITH AGITATOR : Supplying, installing, testing and commissioning of Agitator (shaft submersible / surface mounted ), Blade-SS 304, No Of Blades-3 Nos, Motor-0.5HP, Shaft-SS 304 Make - Gram
TUBE SETTLER IN CLARIFIER TANK: Supplying, installing, testing and commissioning of Tube settler,Its used for Solid liquid seperation and shall be applied for ETP Plants. Quantity-2 Lot, MOC: PVC, Thickness: 1.1mm, Colour : Black, Tank Size: 1.0 m X 1.2 m X 1.3 m
Supply, installation, testing & commissioning factory assembled Horizontal Filter Feed Pump and tested vertical pumpset with CI body and CI impeller, shaft of CI,CI suction and discharge and C.I. Base & head, mechanical seal, connected to a TEFC induction motor suitable for 400/440 volts, 3 phase 50 cycles A.C. supply with,isolation valve, non return valve of required sizes at discharge and suction of each pump, vibration eliminating pads as required, M.S channel fabricated common base plate bolted to cement concrete foundations complete.Dry Run Protection ,1 no. pressure gauge 4" dial with valve tee and fittings.2 nos. of ball valves of brass body nickel plated with stainless steel ball, lever operated (RB/TBS / Cimbrio make) and tested to 20 kg / sq.cm.on delivery side. 2 nos. spring operated type gun metal non return valve tested to 10 kg/ sq.cm pressure including necessary fittings like union, Hex, nipples etc., (make: Neka/leader ) on delivery side.GI manifold of suitable dia on delivery side finished neatly with hot dip galvanizing to 100 microns with flanged end on either sides and collar provision for connectivity of above mentioned valves. Capacity : 1000 LPH, Head : 98.42-ft, No. of Pumps (1 working + 1 standby) Make - Gram
SITC of FRP vessel sand filter with all necessary accessories. Filter shall be suitable for minimum working pressure of 2 kg / cm2 and shall include media, standard fittings like pressure gauges, sampling cock, rinse drain, vacuum breaker etc. The FRP sheet thickness for shell shall be min. 5 mm and for dishes shall 8 mm.The Filter should be consisting of fully automated side mounted multiport valve with top and bottom strainer arrangments - Pressure sand filter flow rate 1000 LPH, Filteration velocity 12 Cum/Hr/Sqm, Filter media Coarese sand, Fine sand and peddles, gravels Make- Gram
-do- but Activated Carbon Filter flow rate 1000 LPH, Filteration velocity 12 Cum/Hr/Sqm, Filter media Activated Carbon, sand and peddles, gravels Make- Gram
SITC of Entire piping shall comprise of pipes droppers/ laterals with uPVC Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc .Air piping System to Collection tank,FBBR Tank,Clear water tank ,Final water tank shall made up of MS(Epoxy coated) Make - Gram
Supply and laying of Cables , Connector, Cable Trays, to make Electrical Installation Complete. Necessary cable alleys, internal / cabling, wiring, cabling from MCC to various pumps / equipment and interlocking, earthing and earthing pits for all equipment.
SITC of Patented ETP Bloom Box will be the next revolution in waste Effluent treatment which consist of following tanks & chambers in 6mm thick and 8mm thickness of bottom plates MS construction including the methane perforated top cover for eliminating air pollution as per as the approved calculation including 2 mm special grade anti corrosive epoxy lining inside the tank and epoxy painting on out side of the approved colors and shades of emanel paint over a coat of primer. The plant should be of compact nature mounted on a common platform.The above cost shall include the cost of all required MS structure for skid plat form ,walking platform,puddle flanges,foot rest,manhole cover etc with painting of desired shadeof enamel paint over a coat of primer for reaction tank, Clarifier tank, Clarified tank. All tanks shall be constructed in MSEP except bar screen and equalization tank
Material and labour for earthing complete with galvanised steel earth plate electrode 600 x 600 x 6 mm thick burried directly in ground (earth pit not less than 2.25m deep below ground level) with top edge of the plate not less than 1.5m below normal ground level, connected to galvanised earth lead wire 4 mm dia by means of bolts, nuts, check nuts and washers of galvanised iron all as shown in electrical plate No. 3 of SSR Part-I and including necessary excavation and earth work in any type of soil, removal and refilling of soil and funnel with wire mesh and GI watering pipe 20mm dia, Chamber in PCC 1:3:6, type C1 using 20mm graded stone aggregate and 40mm thick cover in RCC 1:2:4, type B1 using 20mm graded stone aggregate and reinforced with 8mm dia TMT bars at 150mm c/c on both ways, handle with 16mm dia round bars and 15 mm dia GI pipe medium grade upto 7.5m for protection and connected to earthing test point all as specified or indicated including testing on completion.
Hydro Therm Engineers
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .