Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 LAccepted-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹1.6 L | L-1 | Accepted-AOC Technically acceptable and quoted rate lowest. |
| Sl No | Description | Qty | Unit | S K ENTERPRISES L1 |
|---|---|---|---|---|
| 2.00 | Cost of Ferrule(15joints) | 90 | Nos | 35 ₹3,150 Lowest |
| 3.00 | Cost of Solder 60/40 (15joints) | 7.5 | Kg | 1,600 ₹12,000 Lowest |
| 4.00 | Cost of Insulating material(15joints) | 15 | Sets | 2,500 ₹37,500 Lowest |
| 5.00 | Cost of Rubber sheet and vulacanizing rubber(15joints) | 30 | Kg | 500 ₹15,000 Lowest |
| 6.00 | Cost of Screen(15joints) | 7.5 | Meter | 350 ₹2,625 Lowest |
| 7.00 | Cost of Petrol(15joints) | 15 | litre | 250 ₹3,750 Lowest |
| 8.00 | Hiring charges for Tools and tackels(15joints) | 15 | Days | 250 ₹3,750 Lowest |
| 9.00 | Labor charges for repairing | 15 | Job | 3,367 ₹50,505 Lowest |
| 10.00 | Contractor Profit on labor charges | 1 | Percent | 5,050 ₹5,050 Lowest |
| 11.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹1.5 L
EMD Value
₹1,900
Closing Date
27 Apr 2026, 11:00 amClosed
Staff Officer(Excv), Kakri Project
Office of the General Manager, Kakri Project, NCL
Repairing or Vulcanizing of trailing cable for 03Nos of Drills and 01 No of Shovel (15joints) at Kakri Project.
2026_NCL_358407_1
KKR/SO(Excv)/E-01/26-27/10
Open Tender
Excavation Department Work
Item Rate
365 days
NCL Kakri Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,900
18 Jul 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
27 Apr 2026
17 Apr 2026
16 Apr 2026 - 18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Cost of Ferrule(15joints) | - | Nos | - | - |
| 3 | Cost of Solder 60/40 (15joints) | - | Kg | - | - |
| 4 | Cost of Insulating material(15joints) | - | Sets | - | - |
| 5 | Cost of Rubber sheet and vulacanizing rubber(15joints) | - | Kg | - | - |
| 6 | Cost of Screen(15joints) | - | Meter | - | - |
| 7 | Cost of Petrol(15joints) | - | litre | - | - |
| 8 | Hiring charges for Tools and tackels(15joints) | - | Days | - | - |
| 9 | Labor charges for repairing | - | Job | - | - |
| 10 | Contractor Profit on labor charges | - | Percent | - | - |
| 11 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.18 MB
ITBandCOCandATC.pdf
Tender Documents • 1.50 MB
LOBandUndertakingsandAnnexures.pdf
Tender Documents • 0.74 MB
BOQ_371281.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .