Loading…
Loading…
Tender Value
₹569.2 Cr
EMD Value
₹2 Cr
Closing Date
24 Mar 2026, 3:00 pmClosed
Yes (up to 4 members)
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
Yes
08/01/2026 11:00
Lowest to Highest
180 days
Expenditure
Capital (Works)
GENERAL
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 5% of Estimated Project Cost at the close of the preceding Financial Year. (Refer clause No. 2.2.2.2 of RFP).
The Bidder shall have the Technical Capacity and Experience as mentioned in Clause No. 2.2.2.1, 2.2.2.3 to 2.2.2.9 of the RFP.
30 conditions · 15 needing a document upload
ANNEXURE I TO APPENDIX IA-(DETAILS OF BIDDER) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) Clause 2.1.4, 2.11 and 3.1.6 of RFP.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID) (Para 2.1.4, 2.11 and 3.1.6 of RFP)- The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) Clause No. 2.1.5 of RFP.
ANNEXURE II TO APPENDIX IA(TECHNICAL CAPACITY OF THE BIDDER): Refer CLAUSE 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
APPENDIX III- Format for power of attorney for lead member of Consortium/Joint venture CLAUSE 2.1.6 of RFP.
ANNEXURE III TO APPENDIX IA- (FINANCIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8(i), 2.2.2.7(iii) of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2 and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINT VENTURE) Clause 2.1.11 of RFP.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS) Refer Clause 2.2.2.1, 2.2.2.4 and 2.2.2.6 of RFP.
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY).
APPENDIX-VII (BID SECURITY)/EMD (REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e-payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE VI TO APPENDIX IA-(Guidelines of the Department of Disinvestment) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
ANNEXURE VII TO APPENDIX IA-(Department of Expenditure, Ministry of Finance, Government of India letterF.No.6/18/2019-PPD dated:23/07/2020 shall be referred which is enclosed as Annexure-VII of Appendix-IA) The Bidder shall ensure that all the details are updated as on the due date of submission of this Bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
SCR Construction Organization: Engineering, Procurement and Construction (EPC) Contract for Doubling of Track between Gadwal station to Alampur Road station including Electrification & Signaling works in connection with Doubling of Mahabubnagar-Dhone section in the State of Telangana.
EPC-12-CAO-C-SC-2025~SCR
EPC-12-CAO-C-SC-2025
Open
Works - General
30 Months
Unknown (Unspecified Location)
₹0
₹2 Cr
24 Mar 2026
8 Dec 2025
10 Mar 2026
8 Jan 2026
1 item across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Organization: Alampur Road in the State | :- SCR Construction station to section | Engineering, station including of Telangana. | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Usageof7mmdroppersand10mmrevitwithsplitpin1.pdf
ATTACHMENT
GadwalAlampurroadrevisedFC.pdf
ATTACHMENT
7ProtectivescreenMODI.pdf
ATTACHMENT
Provisonalalampurroadsip.pdf
ATTACHMENT
ProvisonalGadwalSIP.pdf
ATTACHMENT
Provisonalitikyalasip.pdf
ATTACHMENT
Provisonalmanopadsip.pdf
ATTACHMENT
Provisonalpoodoorsip.pdf
ATTACHMENT
ProvisonalpothulapaduSIP.pdf
ATTACHMENT
ReferenceDrawings-1ST.pdf
ATTACHMENT
ReferenceDrawings-2ST.pdf
ATTACHMENT
ReferenceDrawings-3ST.pdf
ATTACHMENT
ReferenceDrawings-4ST.pdf
ATTACHMENT
ReferenceDrawings-5ST.pdf
ATTACHMENT
TOCGADWALJnSHEET01TO03IPU.4019A-ALT.4.pdf
ATTACHMENT
TOCGADWALJnSHEET04TO06IPU.4019A-ALT.4.pdf
ATTACHMENT
TOCPOTHULAPADUTC.4052A-PART1_APPROVE_P10.pdf
ATTACHMENT
EMPLOYMNTOFRETIREDRAILWAYOFFICERSCERTIFICATEFORMAT.pdf
ATTACHMENT
DETAILSOFPERSONNEL,PLANTANDMACHINERYWORKSONHANDFORMATS.pdf
ATTACHMENT
VHFTower15m.pdf
ATTACHMENT
ToolkitAnnexure-11.pdf
ATTACHMENT
ApprovedfloorplanforRBGOFCMTGoomtyandLCGateLodge.pdf
ATTACHMENT
PUPU-ALPRcablerouteplan.pdf
ATTACHMENT
MOA-PUPUcablerouteplan.pdf
ATTACHMENT
LowlevelShelteroverPassengersbenchesonPlatformofWayside-RDSO-B-1758.pdf
ATTACHMENT
23.ApproachRoad.pdf
ATTACHMENT
154-2020-STD-DetailsofArrangementforRevisedBallastRetainerforPostTensionedPSCSlabwith2-UnitsSpan-3.66m.1.pdf
ATTACHMENT
HeightgaugeforLHSupto4.0mspanupto7.5m.pdf
ATTACHMENT
HeightgaugeforLHSupto4.0mspanupto12.5m-2728-2011.pdf
ATTACHMENT
153-2020-STD-DetailsofArrangementforRevisedBallastRetainerforPostTensionedPSCSlabwith2-UnitsSpan-4.57m..pdf
ATTACHMENT
148-2020-STD-DetailsofArrangementforhShapeFootPathunitfor12.2m.to3.05m.PSCSlabsofRDSOStd..pdf
ATTACHMENT
150-2020-STD-DetailsofArrangementforRevisedBallastRetainerforPost-TensionedPSCSlabwith4-UnitsSpan-12.20m._1.pdf
ATTACHMENT
RevisedKITofEPCGWD-ALPR.pdf
ATTACHMENT
PSCGIRGER-STD-158-2020.pdf
ATTACHMENT
ESO-73dt-05.05.2011.pdf
ATTACHMENT
17-2025Barbedfencingdrg.pdf
ATTACHMENT
27.Retainigwall.pdf
ATTACHMENT
RevisedAnnex-IIofSch-Adt.01.03.2026.pdf
ATTACHMENT
RevisedAnnex-IofSch-Hdt.01.03.2026.pdf
ATTACHMENT
Br406A.pdf
ATTACHMENT
TentativeSketchforBTRoadCrossSection.pdf
ATTACHMENT
TypicalSketchofCirculatingArea.pdf
ATTACHMENT
TypicalSketchofRCCPaleFencing.pdf
ATTACHMENT
Policycircular22.12.2021.pdf
ATTACHMENT
3.05157-2020-STD-DetailsofArrangementforBallastRetainerforPre-TensionedPSCSlabwith2-unitsSpan-3.05m..pdf
ATTACHMENT
GWD-ALPRRevisedAnnex-IofSch-DSTdt.03.03.2026.pdf
ATTACHMENT
ElectricalrevisedSch-DBdt.01.03.2026.pdf
ATTACHMENT
PlatformWall702022Sh1of2_compressed.pdf
ATTACHMENT
EPCGWD-ALPRRevisedSch-Gdt.03.03.2026.pdf
ATTACHMENT
149-2020-STD-DetailsofArrangementforCantileverIntegratedFootPathforPSCSlabsofspans12.20m9.15m6.10mofRDSOStd..pdf
ATTACHMENT
150-2020-STD-DetailsofArrangementforRevisedBallastRetainerforPost-TensionedPSCSlabwith4-UnitsSpan-12.20m..pdf
ATTACHMENT
152-2020-STD-DetailsofArrangementforRevisedBallastRetainerforPostTensionedPSCSlabwith2-UnitsSpan-6.10m..pdf
ATTACHMENT
GWD-ALPRRevisedSch-BSTdt.03.03.2026.pdf
ATTACHMENT
ElectricalrevisedSch-Cdt.01.03.2026.pdf
ATTACHMENT
HeightgaugeforRUBupto5.5m.pdf
ATTACHMENT
ElectricalRevisedAnnex-IofSch-Bdt.01.03.2026.pdf
ATTACHMENT
Gadwal-AlampurRoadCorrigendum-03.03.2026..pdf
ATTACHMENT
26.Tentativesketchfortrolleypath.pdf
ATTACHMENT
GWD-ALPRRepliestoPreBidQueriesdt.03.03.2026...pdf
ATTACHMENT
155-2020-STD-DetailsofArrangementforBallastRetainerforPre-TensionedPSCSlabwith2-UnitsSpan-3.66m..pdf
ATTACHMENT
156-2020-STD-DetailsofArrangementforBallastRetainerforPost-TensionedPSCSlabwith2-UnitsSpan-3.05m..pdf
ATTACHMENT
ProvisionofTransitionSystem-RDSOlr.mo.GEGEN112-TranitionVol-IIIDt19-05-20251.pdf
ATTACHMENT
MinimumrecommendedFormationWidths-BanksCutting.pdf
ATTACHMENT
37.COP8.23mWide-10517.pdf
ATTACHMENT
39.Bufferend.pdf
ATTACHMENT
50.VDCAlt-1to71_2022.pdf
ATTACHMENT
GWD-ALPRRevisedSch-BCivildt.09.03.2026.pdf
ATTACHMENT
CorrigendumforEmailId..pdf
ATTACHMENT
teleconsoleAssembly.pdf
ATTACHMENT
ModifiedKITofEPCGWD-ALPR.pdf
ATTACHMENT
PublicProcurementPolicy19.07.2024.pdf
ATTACHMENT
ALAMPURALPRESP.pdf
ATTACHMENT
SBBJHESP.pdf
ATTACHMENT
POTHULAPADU-PUPU-ESP.pdf
ATTACHMENT
MANOPADMOAESP.pdf
ATTACHMENT
ITIKYALAIKI-ESP.pdf
ATTACHMENT
PDO-ESP.pdf
ATTACHMENT
MBNR-DHNE190-195KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE195-200KMLSCPs_1.pdf
ATTACHMENT
MBNR-DHNE200-205KMLSCPs_1.pdf
ATTACHMENT
MBNR-DHNE205-210KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE210-215KMLSCPs_1.pdf
ATTACHMENT
MBNR-DHNE215-220KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE220-225KMLSCPs_2.pdf
ATTACHMENT
MBNR-DHNE225-230KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE230-235KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE235-240KMLSCPs.pdf
ATTACHMENT
MBNR-DHNE185-190KMLSCPs.pdf
ATTACHMENT
TOCPOTHULAPADUTC.4052A-PART2_APPROVE_P10.pdf
ATTACHMENT
TOCPOTHULAPADUTC.4052A-PART3_APPROVE_P10.pdf
ATTACHMENT
ITIKYALA-TC.4021-A3-01of02.pdf
ATTACHMENT
ITIKYALA-TC.4021-A3-01Aof02.pdf
ATTACHMENT
MANOPADTC.4022-A3_01OF02.pdf
ATTACHMENT
MANOPADTC.4022-A3_02OF02.pdf
ATTACHMENT
TOCPOODOOR_TC.4020_A.pdf
ATTACHMENT
Alampurroad_IPU4024_Alt.3_1.pdf
ATTACHMENT
Alampurroad_IPU4024_Alt.3_1A.pdf
ATTACHMENT
ExistingSIPALAMPURROADIPU.4024.ALT.3.pdf
ATTACHMENT
ExistingSIPGADWALJnIPU.4019A-ALT.4.pdf
ATTACHMENT
ExistingSIPPOODOOR_IPU.4020_A0.pdf
ATTACHMENT
ExistingITIKYALA-IPU.4021-A3.pdf
ATTACHMENT
ExistingMANOPADIPU.4022-A3.pdf
ATTACHMENT
ExistingSIPPOTHULAPADUIPU.4052A.ALT.1.pdf
ATTACHMENT
GWD-PDOcableroutepath.pdf
ATTACHMENT
PDO-IKIcableroutepath.pdf
ATTACHMENT
SRNR-GWDCableRoutePath.pdf
ATTACHMENT
IKI-MOAcableroutepath.pdf
ATTACHMENT
CableRoutePathPERR-WPR.pdf
ATTACHMENT
WPR-SRNRCableRoutePath.pdf
ATTACHMENT
TechnicalCirculars-1.pdf
ATTACHMENT
TechnicalCirculars-21.pdf
ATTACHMENT
PEDDADINNE-ESP_1.pdf
ATTACHMENT
GADWALGDW-ESP.pdf
ATTACHMENT
All2x25TSSSPSSPRDSOdrawings.pdf
ATTACHMENT
BafflewallandprotectivescreenRDSOdrgs.pdf
ATTACHMENT
Electricalpolicyletters.pdf
ATTACHMENT
Electricalpolicyletters3.pdf
ATTACHMENT
Electricalpolicyletters2.pdf
ATTACHMENT
ElectricalTRDdrawingslinks.pdf
ATTACHMENT
ETISPCPSICLS0020.pdf
ATTACHMENT
GEworksCircular04-2022_monitoringGEWorks.pdf
ATTACHMENT
ImportantElectricalTRDguidelinesletters.pdf
ATTACHMENT
Master_list_of_drawings_TI2023.pdf
ATTACHMENT
RDSOOHEPSIReportsandemp.sch.pdf
ATTACHMENT
SCADATI_SPC_RCC_SCADA_0134-pages-11.pdf
ATTACHMENT
TICIVMS2020dt22.08.2022galvanization.pdf
ATTACHMENT
TOWERCARANDOHECUMPSIdepotdrg.pdf
ATTACHMENT
180-186lop.pdf
ATTACHMENT
186-197lop.pdf
ATTACHMENT
197-205lop.pdf
ATTACHMENT
205-211lop.pdf
ATTACHMENT
211-218lop.pdf
ATTACHMENT
211-218lop_1.pdf
ATTACHMENT
218-224lop.pdf
ATTACHMENT
224-233lop.pdf
ATTACHMENT
233-242lop.pdf
ATTACHMENT
PrebidConferenceLink.pdf
ATTACHMENT
FacilityChartGadwalAlampurRoad.pdf
ATTACHMENT
EPCGWD-ALPR08.12.25.pdf
ATTACHMENT
Brandsandmakesapprovedlist-2025.pdf
ATTACHMENT
RFPGWD-ALPR08.12.2025.pdf
ATTACHMENT
StationatPDNA-Model.pdf
ATTACHMENT
SBBJFOB-Model.pdf
ATTACHMENT
GWD-ALPRRevisedSch-BCivildt.09.03.2026.pdf
CORRIGENDUM
Usageof7mmdroppersand10mmrevitwithsplitpin1.pdf
CORRIGENDUM
teleconsoleAssembly.pdf
CORRIGENDUM
CorrigendumforEmailId..pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .