Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance AT PO BAJRAKOTE VIA RENGALI DAM SITE DIST ANGUL ODISHA PIN 759105 | ANGUL | ANGUL | ODISHA | 759105 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.5 L+₹12,411.45 (3.71%)Admitted-Fee/PreQual/Technical/Finance PLOT NO 4541 8062 INDRAHARI NAGAR TURANG DIST ANGUL ODISHA 759122 | ANGUL | ANGUL | ODISHA | 759122 | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.7 L+₹30,727.36 (9.19%)Admitted-Fee/PreQual/Technical/Finance AT PO SHARMA CHHAK TALCHER DIST ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.9 L+₹57,839.72 (17.3%)Admitted-Fee/PreQual/Technical/Finance AT PO DERA COLLIERY TALCHER DIST ANGUL ODISHA 759103 | TALCHER | ANGUL | ODISHA | 759103 | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.1 L
EMD Value
₹8,900
Closing Date
7 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Shifting and renovation of old viewpoint near KCC camp to embankment of Bangaru Nallah for clear view of working area of mines under AOCP, JA.(Re-tender/2nd call)
2026_MCL_368229_1
MCL/GM(JA)/SO(C)/e- Tender/26-27/68, Dtd-04/11/26
Open Tender
Civil Works - Others
Percentage
5 days
ANANTA OCP
AS PER NIT
3 documents required · 3 mandatory
₹8,900
7 Nov 2026
4 Nov 2026
7 Nov 2026
4 Nov 2026
7 Nov 2026
4 Nov 2026
4 Nov 2026 - 5 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 6.8 | cum | 217 | ₹1,476.47 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete. | 0.77 | cum | 910.15 | ₹700.36 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 0.77 | cum | 5,219.9 | ₹4,016.71 |
| 4 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.27 | cum | 6,575 | ₹34,617.38 |
| 5 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 1,589.51 | kg | 3.6 | ₹5,722.23 |
| 6 | Refixing Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,589.51 | kg | 34.44 | ₹54,742.63 |
| 7 | Refixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). | 283.81 | kg | 172.6 | ₹48,985.73 |
| 8 | Providing & fixing false ceiling at all height including providing & fixing of framework made of special section, power pressed from M.S. sheets and galvanised with zinc coating of 120 gms/ sqm (both side inclusive) as per IS : 277 and consisting of angle cleat of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm c/c, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25 x10 x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I chanels 45 x15 x 0.90 mm running at the spacing of 1200 mm c/c, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5mm, at 450 mm c/c, shall be fixed in a direction perpendicular to G.I intermediate channel with connecting clip made out of 2.64 mm dia x 230 mm long G.I wire at every junction, including fixing perimeter channels 0.50 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/ partitions with the help of Rawl plugs at 450 mm centre, with 25 mm long dry wall screws @ 230 mm interval, including fixing of Calcium Silicate Board to ceiling section and perimeter channels with the help of dry wall screws of size 3.5 x25 mm at 230 mm c/c, including jointing & finishing to a flush finish of tapered and square edges of the board with recommended jointing compounds, jointing tapes,finishing with jointing compounds in three layers covering up to 150 mm on both sides of joints and two coats of primer suitable for boards, all as per manufacture's specification and also including the cost of making opening for light fittings, grills, difusers, cut outs made with frame of perimeter channels suitably fixed, all complete as per drawings, specificaton and direction of the Engineer in charge but excluding the cost of painting with:8 mm thick Calcium Silicate Board made with Calcareous & Siliceous materials reinforced with cellulose fiber manufactured through autoclaving process. | 12.25 | sqm | 1,475.6 | ₹18,076.1 |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 176.11 | sqm | 114.65 | ₹20,190.55 |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,245.79 | kg | 124 | ₹2,78,477.79 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.85 MB
Tendernotice_2.pdf
PDF • 1.48 MB
Tendernotice_3.pdf
PDF • 0.76 MB
BOQ_381207.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .