| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance CHHOTI LINE B 5 160 A 3 CHHOTI LINE YAMUNA NAGAR 135001 | YAMUNA NAGAR | YAMUNANAGAR | HARYANA | 135001 | -0.25% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 LAdmitted-Finance | +4.10% | ₹1.8 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical GANGA NAGAR COLONY 1251 B GANGA NAGAR COLONY JAGADHRI 135003 | JAGADHRI | YAMUNANAGAR | HARYANA | 135003 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
9 May 2026, 3:00 pmClosed
DHARAM VIR
DIV Karnal
J-2 A/mtc of EPHS in various Sector UE Jagadhari.
2026_HBC_519289_1
202652ADC907 C9E5 4CA2 9A42 B3257035FB5B240HSV
Open Tender
Civil Works
30 days
Jagadhari
2 documents required · 2 mandatory
₹250
₹3,380
Yes
26 May 2026
4 May 2026
11 May 2026
4 May 2026
9 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. | 87.85 | cum | 184 | ₹16,164.4 |
| 2 | [2.B0229] B0229. Galvanised steel J or L hooks 8 mm dia | 36 | 10 Nos. | 107 | ₹3,852 |
| 3 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 8.2 | cum | 83 | ₹680.6 |
| 4 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 8.2 | cum | 3,476 | ₹28,503.2 |
| 5 | [6.15.1]Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor four level, excluding cost of centering, shuttering, finishing and reinforcement : 1. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1.86 | cum | 5,969 | ₹11,102.34 |
| 6 | [6.30.6]Centering and shuttering including strutting, propping etc. and removal of form for 6. Columns, Pillars, Piers, Abutments, Posts and Struts | 142.56 | Sqm | 262 | ₹37,350.72 |
| 7 | [6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars | 231.66 | Kg. | 68 | ₹15,752.88 |
| 8 | [7.70]Extra for bailing / pumping out standing water of pond caused by springs, sub soil water, canal or river seepage and broken water mains or drains except rain water collected in the trenches or foundations before laying brick work. | 369.89 | Kilolitre | 27 | ₹9,987.03 |
| 9 | [9.2]Hoisting R.C.C. battens and placing in position up to floor IV level | 1.86 | cum | 1,799 | ₹3,346.14 |
| 10 | Prov and fixing of 4 Nos horizontal and 2 nos diagonal cross line of GI barbed wire fencing 12x12 guage complete in all respect | 250 | pmtr | 170.8 | ₹42,700 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_598184.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid