Loading…
Loading…
Tender Value
₹4.5 Cr
EMD Value
₹9.1 L
Closing Date
15 Jul 2026, 4:00 pm7d left
Executive Engineer rnb division Awantipora
Executive Engineer rnb division Awantipora
Construction of Auditorium Block at GDC Tral.
2026_PWDJK_314049_1
39/EEA/RNB of 2026-27/2502-12 Dated 30-06-2026
Open Tender
Civil Works
545 days
tral
as per NIT/SBD
17 documents required · 17 mandatory
₹5,500
JK Bank Account Bearing No 0470010200000099
₹9.1 L
Superintending Engineer PWD(RNB) Circle Pul/Spn
30 Jun 2026
30 Jun 2026
16 Jul 2026
1 Jul 2026
15 Jul 2026
1 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of main Building. | - | - | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 1 | CUM | 0.88 | ₹0.88 |
| 3 | Providing & Laying of stone soling (dully hand packed) including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 1 | CUM | 0.03 | ₹0.03 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | CUM | 0.85 | ₹0.85 |
| 5 | Filling available excavated earth (excl. rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | CUM | 0.19 | - |
| 6 | Supply and filling of split Nallah boulders (75mm to 150mm) as directed including dressing, hand ramming watering incl. all material involved loading, unloading complete. | 1 | CUM | 0.08 | ₹0.08 |
| 7 | Supply/Filling with stone dust under floors incl.watering hand ramming consoladating and dressing carriage complete . | 1 | CUM | 0.08 | ₹0.08 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately.All works upto plinth level | - | CUM | 0.83 | - |
| 9 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separately. All works above plinth level upto floor V leve | 1 | CUM | 0.2 | ₹0.2 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 0.2 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_1016693.xls
BOQ • 0.68 MB