| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance | -3.55% | ₹6.0 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 L+₹17,327.22 (2.89%)Admitted-Finance | -3.15% | ₹6.2 L+₹17,327.22 (2.89%) | L2 | Admitted-Finance |
| 3 | L3₹7.0 L+₹95,534.45 (15.9%)Admitted-Finance | +3.99% | ₹7.0 L+₹95,534.45 (15.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MANDEEP CONSTRUCTION L2 | M/s Jyoti Construction L3 | MS SUDESH SAINI L1 |
|---|---|---|---|---|---|---|
| .01BOQ- II (Item Rate Basis) | ||||||
| 1.00 | E/W in filling of excavated earth except black cotton soil with watering & compaction of spreaded earth in 15-30cm layers levelled & neatly dressed as per requirement of site & direction of E/I, work includes cost of earth with taxes, loading, unloading, transportation, labour, water & T&P etc. complete with all lead & lift. | 740 | Cum. | 265 ₹1,96,100 | 320 ₹2,36,800 | 245 ₹1,81,300 Lowest |
| 2.00 | Supply, stacking & spreading & hand ramming of quarry rubbish in layer not exceeding 15 cm including all lead and lift transportation, loading, unloading with watering and hand ranning with labour, T&P, machinary water etc. complete in all respect finishing in line, level & camber as per directon of Engineer incharge. | 111 | Cum. | 700 ₹77,700 | 810 ₹89,910 | 690 ₹76,590 Lowest |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
27 Jul 2026, 3:00 pmClosed
SE (CIVIL) JPD, JAIPUR
OLD POWER HOUSE PREMISES, NEAR RAM MANDIR, BANIPARK, JAIPUR
Protection work by pitching on back side B/wall at 33 KV S/S Kolila joga (Neemrana)
2026_JVVNL_576077_3
NIT-06/2026-27 JPD JAIPUR
Open Tender
Civil Works
Percentage
90 days
BEHROR
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
AO (O AND M) JVVNL, ALWAR
₹16,000
Yes
ALWAR
31 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | BOQ- I (Bldg, Electric, PHED & Road Work) | - | - | - | - |
| 1 | 1.8
E/W in excavation by mechanical means (hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5m in which or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering &ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils. | 22 | Cum | 178 | ₹3,916 |
| 2 | (B-54/3.1.6)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) | 8 | P.cum | 3,302 | ₹26,416 |
| 3 | RR stone masonry for with hard stone in foundation and plinth in CSM above 30cm thick wall in CM 1:6 (1cement :6 Sand) (6.1.6) | 55 | Cum | 2,838 | ₹1,56,090 |
| 4 | (B-139/12.3.2)
Plaster on new surface on walls in cement sand mortar 1:6 including racking of joint etc. complete fine finish:
20mm thick. | 200 | Sqm. | 190 | ₹38,000 |
| 5 | (B-56/3.8)
Providing & fixing precast cement concrete coping 1 : 2 : 4 mix 50mm thick complete as per specification : | 39 | Sqm. | 367 | ₹14,313 |
| 6 | (B-12.41.1)
Finishing wall with water proofing cement paint of approved brand and manufacture and or required shade to give an even shade including all scaffolding:
New work (Two or more coats applied @ 3.84 kg/10 sqm). | 100 | Sqm. | 53 | ₹5,300 |
| 7 | B-1.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 500 | Sqm | 5 | ₹2,500 |
| 8 | (R-14.5(I))
Providing and laying pitching on slopes laid over prepared filter media as per drawing and MoRTH specifications Clause 2504.2.1
Stone/Boulder | 87 | Cum. | 800 | ₹69,600 |
| 9 | (R-14.6)
Providing and laying filter material underneath pitching in slopes complete as per drawing and MoRTH specifications Clause 2504.2.2 | 52 | Cum. | 734 | ₹38,168 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 26.87 MB
BOQ_1024312.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .