Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -27.87% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹10.0 L (8.15%)Admitted-Finance | -21.99% | ₹1.3 Cr+₹10.0 L (8.15%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹11.1 L (9.09%)Admitted-Finance | -21.31% | ₹1.3 Cr+₹11.1 L (9.09%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
12 Jul 2026, 6:00 pmClosed
SEWDSCPALI
SEWDSCPALI
Construction Khadin, Tanka, CCT, Farm Pond, PCD, ECD, Bank Stabilisation, Safety/Retaining Wall etc in MJSA 2.2 Rani Station
2026_WDSC_571733_2
1002/29-6-26
Open Tender
Civil Works
Percentage
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Secretary, RREIS
₹3.4 L
Yes
22 Jul 2026
30 Jun 2026
13 Jul 2026
30 Jun 2026
12 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr¼thds,u 2025 vkbZVe ua- 191½ | 86,224.3 | sqm | 2.86 | ₹2,46,601.5 |
| 2 | c.M ij 5 ls 7-5 lseh xgjkbZ dk Mkxcsfyax dk;Z ¼thds,u 2025 vkbZVe ua- 6 c½ | 39,413.98 | m | 1.71 | ₹67,397.91 |
| 3 | जे-सी-बी- मशीन@ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य] खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर] पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन ¼काट क्षेत्रफल में½ प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी- एवं लिफ्ट 3 मी- तक। Draft based on chapter 5th of irrigation page number 32 to 34 ¼दिनाँक 01-04-2022 से मान्य½ ईकाई 1 घन मी.(GKN 2025 item 196 b) in hard soil | 61,953.16 | cum | 88.5 | ₹54,82,854.66 |
| 4 | जे-सी-बी- मशीन@ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य] खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर] पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन ¼काट क्षेत्रफल में½ प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी- एवं लिफ्ट 3 मी- तक। Draft based on chapter 5th of irrigation page number 32 to 34 ¼दिनाँक 01-04-2022 से मान्य½ ईकाई 1 घन मी.(GKN 2025 item 196 a) in soft soil | 3,264 | cum | 75.9 | ₹2,47,737.6 |
| 5 | lhesUV daØhV uhao ;k Q'kZ esa 40 fe- eh- ukHkh; eki dh iRFkj fxÍh@bZV fxÍh] lhesUV jsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk] rjkbZ lesrA | 43.55 | cum | 3,495.05 | ₹1,52,209.43 |
| 6 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m (WRD BSR 2022/CH-V/ ITEM 20) | 463.5 | cum | 73.63 | ₹34,127.51 |
| 7 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। | 132.82 | cum | 3,587.3 | ₹4,76,465.19 |
| 8 | नींव तथा कुर्सी में पत्थर की वे रद्धा-ढोका सीमेंट-बजरी मसाले में, मय बगल की झिरी बन्द करना तथा तराई आदि सहित। | 553.29 | cum | 3,330.46 | ₹18,42,710.21 |
| 9 | R/R stone Kharanja work In 23 Cm thick with cement mortar(1:6)(at D/S side of Head wall as per required) | 160.43 | sqm | 639.12 | ₹1,02,534.02 |
| 10 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । | 83.68 | cum | 4,495.29 | ₹3,76,165.87 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 15.57 MB
tendernit05.pdf
Tender Documents • 15.55 MB
BOQ_1017351.xls
BOQ • 0.26 MB
NIT5.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .