Loading…
Loading…
Tender Value
₹14.6 L
EMD Value
₹30,000
Closing Date
6 Oct 2026, 4:00 pm
Executive Engineer Kurseong Division PHED
Office of the Executive Engineer Kurseong Division PHED
Recovery and reconstruction of PWS Scheme for tindharia and narbung
2026_GTA_5074226_1
EE/KD/PHED/GTA/eNIT- 1_1-26 of 2026-27 Retender
Open Tender
CIVIL WORKS
Percentage
Kurseong
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,005
₹30,000
Yes
22 Sept 2026
22 Sept 2026
8 Oct 2026
22 Sept 2026
6 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing compound premises of shurbs, plants, jungles etc.
By cutting and removing as directed (Specific permission of
Engineer-in-Charge prior to execution will be necessary). | 159 | m2 | 11 | ₹1,749 |
| 2 | Landslide clearance in soil clearance of landslides in soil and ordinary rock by a bulldozer D 80 A 12 , 180 Hp and disposal of the same side on the valley | 400 | m3 | 69.9 | ₹27,960 |
| 3 | Earthwork in excavation of foundation trenches of drains an all sorts of soils ( including mixed soils but excluding laterite or sand stone ) including removing, spreading or stacking the spoils within a lead of 75 mtr. as directed.item includes neccessary triming the side of trenches levelling dressing and ramming the bottom bailing out as required complete depth of excavation not exceeding 1.50 mtr. | 39.1 | m3 | 119.27 | ₹4,663.46 |
| 4 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. N.B | 30 | M2 | 64 | ₹1,920 |
| 5 | Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size. | 30 | m3 | 1,272 | ₹38,160 |
| 6 | Cement concrete with graded stone ballast (40 mm size, excluding shuttering ) ( 1:3:6)-( N.B. Variety Stone Metal) | 1.3 | m3 | 4,976 | ₹6,468.8 |
| 7 | Cement concrete (1:1.5:3) with 20mm down graded stone chips excluding shuttering with N.B.Variety River bazree. | 0.95 | m3 | 5,123.04 | ₹4,866.89 |
| 8 | Reinforcement ( for RCC works) in all sorts of structure including distribution bars,stirrups,binders etc. including supply of bars,initial straightening and removal of loose rust if necessary cutting to requisite length hooking & bending to corrrect shape placing in proper position and binding with 16 swg black annealed wire at every intersection complete as per drawing & direction. (a)(i) Tor steel/ Mild steel( Other than SAIM/Tata/RINL) | 0.1 | MT | 86,333.48 | ₹8,633.35 |
| 9 | Hire & Labour charges for shuttering with centering and necessary staging upto 4 mtr. Using approved stouts props and thick hard wood plank of approved thickness with required bracing for concrete slabs, beams, columns,lintels including fitting fixing and striking out after completion of work(25 mm to 30 mm thick wooden shutttering as directed) a) 25mm to 30mm thick wooden shuttering as per decision & direction of ECI | 150 | m2 | 400.8 | ₹60,120 |
| 10 | Plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone boulder size 150mm and above placed in as directed, excluding shuttering if any (1:3:6). | 54 | m3 | 3,964.8 | ₹2,14,099.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_5160245.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .