Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
14 Nov 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (AF) MC CHANDIGARH
Garrison Engineer (AF) MC Chandigarh 160 003
REPAIR/MAINT OF LEAKAGE/SEEPAGE FROM ROOF IN CERTAIN BUILDING OF TECH AREA AT 3 BRD UNDER GE (AF) MC CHANDIGARH
2026_MES_783467_2
GE (AF) MC/CHD/T-14/2026-27
Open Tender
Civil Works
Item Rate
180 days
CHANDIGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (AF) MC CHANDIGARH
₹90,000
Yes
14 Nov 2026
14 Oct 2026
16 Nov 2026
14 Oct 2026
14 Nov 2026
31 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick tiles or terracing tiles, single layer on roof and removal of unserviceable brick tiles / brick bats of rubbish outside defence land upto a distance exceeding 1.5 Kms but not exceeding 5.0 Kms, complete all as specified and directed. | 450 | SQUARE METRE | 1 | ₹450 |
| 2 | Taking down existing bitumen felt including cement mortar bedding padding and cleaning the surface and removal of all rubbish outside defence land upto a distance exceeding 1.5 Kms but not exceeding 5.0 Kms, complete all as specified and directed. | 450 | SQUARE METRE | 1 | ₹450 |
| 3 | Demolition of mud in roof, any thickness, including plastering and leaping (whether full thickness removed or only a part thereof) and removal of all rubbish outside defence land upto a distance exceeding 1.5 Kms but not exceeding 5.0 Kms, complete all as specified and directed. | 90 | CUBIC METRE | 1 | ₹90 |
| 4 | M & L for PCC 1:2:4 type B-0 (12.5 mm graded crushed stone aggregate) as in padding on roof laid in 50mm thick average required thickness to maintain desired slope, finished even and fair without using extra cement, complete all as specified and directed. | 450 | SQUARE METRE | 1 | ₹450 |
| 5 | Material and labour for rendering 15mm thick in cement mortar (1:3) using WPC @ 200ML per 50Kg bag of cement on surfaces of roof and parapet, finished even & fair without using extra cement, complete all as specified and directed.
Note : WPC shall be measured and paid separately. | 205 | SQUARE METRE | 1 | ₹205 |
| 6 | Supply only Liquid Water Proofing Compound complete all as specified and directed. | 7 | LITRE | 1 | ₹7 |
| 7 | Material and Labour for 40mm thick brick tiles laid over and including 15mm thick cement screed bed in cement mortar (1:6) using grey cement and grouted flush in cement mortar (1:3) mixed with 5% of crude oil by weight of cement laid on concrete roof, complete all specified and directed. | 225 | SQUARE METRE | 1 | ₹225 |
| 8 | M&L for waterproofing treatment of roof using ready-to-use, highly flexible, UV-resistant, liquid-applied acrylic waterproofing membrane complete as specified.
(a) Priming : Clean and prepare the roof surface by removing dust, dirt, oil, grease, loose particles and other contaminants. Apply acrylic waterproofing and allow it to dry before subsequent coats.
(b) Waterproofing Treatment : Apply minimum two coats by roller, brush or airless spray. For reinforced roof treatment, apply the first coat at approximately 0.70 Kg/m², embed suitable glass fibre fabric (60 GSM) /reinforcement into the fresh coating wherever specified, and apply the second coat at approximately 0.70 Kg/m² after the required drying interval.
(c) The glass fibre reinforcement shall be properly embedded and fully covered by the waterproofing membrane. Special attention shall be given to corners, junctions, cracks, joints, seams, outlets and other vulnerable areas, with localised reinforcement wherever required.
(d) The interval between coats shall generally be 02 to 04 hours, subject to site temperature, humidity and coating thickness. The completed system shall be allowed to cure as per manufacturer's instructions.
(e) The finished waterproofing membrane shall provide UV and weathering resistance, crack-bridging capability and reduction of heat absorption. The material shall comply with the manufacturer's current technical data sheet.
(f) The completed waterproofing shall be continuous, fully bonded and free from pinholes, blisters, cracks, exposed reinforcement or other defects. The roof shall have adequate slope/drainage to prevent water ponding. | 450 | SQUARE METRE | 1 | ₹450 |
| 9 | All as per the description of Serial Item No 08 here-in-before but on Chajjas, complete all as specified and as directed. | 100 | SQUARE METRE | 1 | ₹100 |
| 10 | All as per the description of Serial Item No 08 here-in-before but on Walls, complete all as specified and as directed. | 200 | SQUARE METRE | 1 | ₹200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_890275.xls
BOQ • 0.36 MB
TenderDocument14.pdf
Tender Documents • 1.17 MB
Corrigendum1.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .