Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC 1191 ARDEVOK ROAD BARASAT 24 PGS N KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | L1 | Accepted-AOC Lowest (L1) | |
| 2 | L2₹1.8 L+₹4,911.65 (2.76%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹1.8 L+₹5,089.60 (2.86%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
Tender Value
₹1.8 L
EMD Value
₹3,560
Closing Date
12 Jan 2026, 12:00 pmClosed
EE, DIV-IV, Housing (BSUP), Housing Sector, KMDA
OFFICE OF THE EXECUTIVE ENGINEER DIVISION-IV, HOUSING SECTOR (BSUP), KMDA. UNNAYAN BHAWAN, BLOCK A (6TH FLOOR), SALT LAKE CITY, KOL-91
Internal repairing and strengthening of ceiling, lintel, beam etc. of different flats in different blocks and verandah, stair, common passage area of BL-11 with other allied civil works in KIT Housing Scheme No. LIGH-I under Housing Sector, KMDA
2025_KMDA_975341_1
36/EE/DIV-IV/Housing (BSUP)/KMDA of 2025-2026
Open Tender
CIVIL WORKS
Percentage
60 days
KIT Housing Scheme No. LIGH-I
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹3,560
24 Feb 2026
24 Dec 2025
14 Jan 2026
24 Dec 2025
12 Jan 2026
24 Dec 2025
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge.
Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in -charge. a) 37.5mm thick
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,where necessary GF to 3rd floor roof including scaffolding (i) With 1:4 cement mortar a) 10 mm thick plaster
b) 15 mm thick plaster
White washing including cleaning and smoothening surface thoroughly. All floors :(b) Two coats (to be done on specific instruction).
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in-charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labor required for the work including all incidental changes such as electricity charges, labor insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. (I) For structural members of specified sections weighing less than 22.5 Kg./m
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Add GST @ 18% on Total amount over item No. 1 to 7
Add Labour Welfare Cess @ 1% on Total amount over item No. 1 to 8
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tendernotice_2.pdf
PDF • 4.69 MB
Tendernotice_3.pdf
PDF • 0.16 MB
BOQ_2375123.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .